Executive Engineer, Panchayat (R&B) Division, Valsad
DHR/PMAAGY- 2024-25/ 01, PMADI- Adarsh Yojana- 2024-25 Construction of Class Room @ Barumal Bariya Faliya, Bhensadara Patel Faliya, Rajpuri Talat, Tiskaritalat And Gorakhada Primary Schools, Taluka.- Dharampur, Dist. - Valsad (Re-invite)
271320
41 of 2025-26
Open
Civil Works - Buildings
Works
Valsad
5 documents required · 5 mandatory
₹2,400
Yes
Executive Engineer, Panchayat (R&B) Division, Valsad
₹54,600
Yes
31 Jan 2026
31 Jan 2026
31 Jan 2026
9 Feb 2026
31 Jan 2026
Item No. Quantity Unit Amount
Reference to Book of Specifications) Figures
1 Excavation for foundation upto 1.5 m depth 330.89 CMT. 117.07
including sorting out and stacking of useful
materials and disposing off the excavated stuff
upto 50 Meter lead. (A) Loose or soft soil ( I )
To 1.5 mt. Depth
2 Excavation for foundation upto 1.5 m to 3.0 m 90.05 CMT. 129.80
depth including sorting out and stacking of
useful materials and disposing off the excavated
stuff upto 50 Meter lead. (A) Loose or soft soil
( II ) 1.5 To 3.0 MT Depth
3 Filling available excavated earth (Including rock 347.77 CMT. 130.39
in trenches plinth, sides of foundations etc. in
layers not exceeding 20 cm. in depth
consolidating each deposited layer by ramming
4 and watering)
Providing & filling in plinth with murrum or 45.24 CMT.
Thickness. Incl. watering, ramming &
consolidation etc. complete.
5 Filling in plinth with sand under floors 45.24 CMT. 460.18
including watering ramming, consolidating and
dressing complete (A) Foundation and plinth
6 Providing and laying cement concrete 1:2:4 (1- 62.41 CMT. 3855.17
Cement : 2- coarse sand : 4- hand Machine
crushed stone aggregates 40 mmnominal size)
and curing complete including cost of formwork
in (A) PCC
7 Providing and laying controlled cement concrete 45.33 CMT. 4419.76
M.250 and curing complete inculding the cost of
formwork but Excluding the cost of
reinforcement for reinforced concrete work in
foundation, footings base of column and mass
concrete. (A) Footing
SHEDULE B Page
Description of Item (With brif Specification And Rate in
Item No. Quantity Unit Amount
Reference to Book of Specifications) Figures
8 Providing and laying controlled cement concrete 11.93 CMT. 7963.85
M.250 and curing complete inculding the cost of
formwork but Excluding the cost of
reinforcement for reinforced concrete work in All
Types of Column D) Column, Pillers, posts and
struts , upto Plinth
9 Providing and laying controlled cement concrete 20.30 CMT. 7927.49
M.200 and curing complete inculding the cost of
formwork but Excluding the cost of
reinforcement for reinforced concrete work in All
Types of Column D) Column, Pillers, posts and
struts, upto Ground Floor
10 Providing and laying controlled cement concrete 3.35 CMT. 7967.58
M.200 and curing complete inculding the cost of
formwork but Excluding the cost of
reinforcement for reinforced concrete work in
All Types of Column D) Column, Pillers, posts
and struts, upto First Floor
11 Providing and laying controlled cement concrete 23.76 CMT. 6265.03
M.250 and curing complete inculding the cost of
formwork but Excluding the cost of the cost of
reinforcement for reinforced concrete work in
Beams. (E) Beam, upto Plinth
12 Providing and laying controlled cement concrete 26.96 CMT. 6269.77
M.200 and curing complete inculding the cost of
formwork but Excluding the cost of
reinforcement for reinforced concrete work in All
Types of Beams,(E) Beam, Ground Floor
13 Providing and laying controlled cement concrete 34.71 CMT. 6229.68
M.200 and curing complete inculding the cost of
formwork but Excluding the cost of
reinforcement for reinforced concrete work in All
Types of Slab,All Thickness (C) Slab upto Plinth
and Ground Floor
14 Providing and laying controlled cement concrete 1.73 CMT. 5795.38
M.200 and curing complete inculding the cost of
formwork but Excluding the cost of
reinforcement for reinforced concrete work in
Lintel upto Ground Floor
SHEDULE B Page
Description of Item (With brif Specification And Rate in
Item No. Quantity Unit Amount
Reference to Book of Specifications) Figures
15 Providing and laying controlled cement concrete 2.48 CMT. 5618.63
M.200 and curing complete inculding the cost of
formwork but Excluding the cost of
reinforcement for reinforced concrete work in
Chajja. Upto Ground Floor
16 Providing and fixing TMT bars Fe-500D steel 20002.82 Kg . 76.25
reinforcement for R.C.C. work including binding,
bending and placing in position complete upto
floor two level ,Ground Floor, First Floor
Second Floor, Third Floor, Terrace Floor (all
17 Applying general insecticide pest control 301.74 SMT. 89.28
treatment to floors, cupboards etc including
labour material etc. complete. Using
Heptachloride 20 EC. As Per 6113_pests
Consentration Weight 0.50 percent is
recommended one litre chemical emulsion dillute
18 Brick work using common brunt clay building 27.25 CMT. 4021.02
bricks having crushing strength not less than
kg/sqcm. in foundation and plinth in cement
mortar 1:6 (1 cement :6 fine sand) etc.comp. (B)
Conventional Ground floor upto Plinth
19 Brick work using common brunt clay building 121.49 CMT. 4295.99
bricks having crushing strength not less than
kg/sqcm. in superstructure above plinth level upto
floor two level in cement mortar 1:6 (1 cement :6
fine sand) etc.comp. (B) Conventional Ground
20 Brick work using common brunt clay building 20.41 CMT. 4336.18
bricks having crushing strength not less than
kg/sqcm. in superstructure above plinth level upto
floor two level in cement mortar 1:6 (1 cement :6
fine sand) etc.comp. (B) Conventional First Floor
21 Providing 15mm thick cement plaster in single 873.45 SMT. 153.19
coat on Rough (Similar)side of single or Full/half
brick walls for interior plastering upto floor two
level and finished even and smooth in (ii)
Cement mortar 1:4 (1-cement :4-sand) Ground
SHEDULE B Page
Description of Item (With brif Specification And Rate in
Item No. Quantity Unit Amount
Reference to Book of Specifications) Figures
22 Providing 15mm thick cement plaster in single 88.80 SMT. 176.58
coat on Rough (Similar)side of single or Full/half
brick walls for interior plastering upto floor two
level and finished even and smooth in (ii)
Cement mortar 1:4 (1-cement :4-sand) First Floor
23 Providing & laying10 mm. thick cement plaster 301.74 SMT. 140.94
in single coat on fair side of ceilings for interior
plastering upto floor two level and finishing with
smooth mala plaster.(i) Cement mortar 1:4 (1
cement : 4 sand) Ground Floor
24 20mm thick sand faced cement plaster on walls 685.99 SMT. 300.65
upto height 10 metres above ground level
consisting of 12mm thick backing coat of C.M.
1:3 (1-cement : 3-sand) and 8mm thick finishing
coat of C.M. 1:1 (1-cement : 1-sand) etc.
complete. Upto Ground Floor to
25 Providing throating or plaster drip and moulding 73.06 RMT. 42.16
to R.C.C. Chhajja.
26 Providing 20 mm deep finished groove in plaster 73.06 RMT. 30.30
in line and level etc. Comp. For all Floor
27 Providing and laying polished Granite Slab 9.90 SMT. 2377.54
18mm thick in Flooring laid 20mm thick Cement
Mortar 1:4 (1-Cement : 4-Coarse Sand) and
jointed with Grey Cement Slurry including full
molded round front edges , rubbing and polishing
etc. complete.
28 Providing and laying polished Granite Slab 57.53 SMT. 2408.85
18mm thick in Risers of steps Dedo, window sill,
jembs and pillars laid 10 mm thick Cement
Mortar 1:4 (1-Cement : 4-Coarse Sand) and
jointed with Grey Cement Slurry including full
molded round edges , rubbing an
29 Providing and laying polished Kota stone slab 258.35 SMT. 965.59
flooring over 20mm (Average) thick base of
cement mortar 1:6 (1-cement : 6-coarse sand) or
L.M. 1.1.5 laid over and jointed with grey cement
slurry including rubbing and polishing etc.
complete. (B) 30 mm thic
SHEDULE B Page
Description of Item (With brif Specification And Rate in
Item No. Quantity Unit Amount
Reference to Book of Specifications) Figures
30 Providing and laying polished kota stone slab 49.08 SMT. 1089.66
25mm thick in risers of steps,skirting Dedo and
pillars laid on 10mm thick cement mortar 1:3 (1-
Cement : 3 coarse sand) and jointed with gray
cement slury mixed with pigment to match the
shade of slab includin
31 Providing and fixing 37 mm thick flush door both 17.64 SMT. 3737.00
sides laminated andshutter fabricated from 35 mm
thick solid core malemine faced three layered pre
laminated flat pressed wood based exterior grade
bonded BWP/BWR synthetic resin having
stamped IS 12823 gra
32 Providing and fixing window having extruded 27.90 SMT. 1583.95
aluminum Colour anodized section frame main
outer size 95mm x 24mm x 1.17mm @ wt.of
0.738 Kg/mt , horizontal Three track member size
vertical member of size 92mm x 31.75mm x
1.50mm @ Wt. 1.06 Kg/mt with sliding shutters
of horizontal member size 40 mmx18mm
x1.29mm @ wt.of 0.456 Kg/mt, vertical member
of size 40mm x 18mm x 1.29 mm @ wt.of
0.456Kg/mt/ with 5 mm thick transparent bronze
colour tinted float glass with powder coated
aluminum fittings and fixtures and transparent
silicon sealant glass fixing to frame as per details
33 Providing and fixing M.S. grill of required 480.30 Kg. 111.60
pattern of windows etc. with M.S.. flats at
required spacing and frame alround square or
round headed bolts and nuts or by
screws.including applying a priming coat of red
lead paint and two coats of oil painting
SHEDULE B Page
Description of Item (With brif Specification And Rate in
Item No. Quantity Unit Amount
Reference to Book of Specifications) Figures
34 Applying two coats of Birla (white cement 962.25 SMT. 161.45
based) or (acrylic lapy- putty) or equivalent &
two coats of primer of approved brand and
manufacture on new wall surface to give an even
shade including thoroughly brushing the surface
free from mortar dropping and other foreign
matter and sand papered smooth. with Wall
painting (three coats) with plastic emulsion paint
of approved brand and manufacture on
undecorated wall surface to give an even shade
including throughly brushing the surface free
from mortar droppings and other foreign matter
and sand papered smooth.
35 Applying two coats of Birla (white cement 301.74 SMT. 166.87
based) or (acrylic lapy- putty) or equivalent &
two coats of primer of approved brand and
manufacture on new Ceiling surface to give an
even shade including thoroughly brushing the
surface free from mortar dropping and other
foreign matter and sand papered smooth. Ceiling
painting (three coats) with plastic emulsion paint
of approved brand and manufacture on
undecorated Ceiling surface to give an even shade
including throughly brushing the surface free
from mortar droppings and other foreign matter
and sand papered smooth.
36 Finishing wall with weather proof exterior 685.99 SMT. 160.59
emulsion paint on wall surface (two coats) to give
an required shape even shade after thoroughly
brushing the surface to remove all dirt, and
remains of loose powdered materials.etc
complete. Priming: Apply a liberal coat of
exterior acrylic primer and allow it to dry for 4-5
hours. Application of putty is not recommended.
Minimum 4-6 hours duration is required
between each coat of weather shield max paint
SHEDULE B Page
Description of Item (With brif Specification And Rate in
Item No. Quantity Unit Amount
Reference to Book of Specifications) Figures
37 Applying priming coat over new steel and other 56.12 SMT. 122.49
metel surface after and including preparing the
surface by throughly cleaning, oil,grease, dirt and
other foreign matter and scoured with brushes
fine steel wood, scrapers and sand paper with
ready mixed priming paint brushing red lead. and
Painting two coats (excluding priming coat) on
new steel and other metal surface with enamel
paint, brushing, interior to give an even shade
including cleaning the surface an even shade
including cleanicn the surface of all dirt, dust and
other foreign matter.
38 Steel work welded in built up sections, framed 3.56 Quintal 9047.86
work including cutting, hoisting, fixing in
position and applying a priming coat of red lead
(A) In beams and joints channels angles, column,
tees, flats with connecting plates or angle cleats
39 Providing and fixing in position callapsible steel 23.12 SMT. 5785.56
shutters with vertical channels 20 x 10 x 2 mm
braced with flat iron diagonals 20 x 5 mm size
with top and bottom rails of T_rin 40x 40 x 6 mm
with 38mm dia, steel pulleys complete with bolts,
nuts, locki
40 Providing and laying broken chine mosaic 301.74 SMT. 747.28
flooring for terrace using 12 mm to 20 mm
broken pieces of glazed tiles to be laid over
cement mortar 1:3 to plain or slope and to be
tempered to bring mortar creme out upto
surface using
SHEDULE B Page
Description of Item (With brif Specification And Rate in
Item No. Quantity Unit Amount
Reference to Book of Specifications) Figures
41 Providing, laying and jointing in true line and 30.00 RMT. 836.73
level 110 diametre U.P.V.C (Type B) conforming
to IS 13592-1992 with one end plain and other
end socketed with rubber ring, & fittings
conforming to ISI 14735-1999 of approved make
for drainage system pipe line, pipe shall be
jointed with each other with rubber lubricant,
pipe shall be fixed on wall using of PVC clamp of
the size 110 mm diametre x 149 mm length x
mm heigh at every 2000 mm center to center or
shall be concealed in walls as directed including
necessary fittings such as bends, shoes etc.
including testing of pipes and joints and jointed
with adhesive solvent cement including cost of all
materials.
Rupees Fifty Four Lakhs Fifty Five Thousand Seventy Seven and Paise Fifty Two Only
I we am / are willing to carry out the work at …................................ % above/ Below percent ( Should
Estimated Amount Put to tender. 54,55,077.52 Estimated Amount Put to tender.
Deduct…........ % Below Deduct…........ % Below
In Words In Words
(1) The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-
In-Charge for which no extra payment shall be made.
(2) The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
(3) GST and Income tax TDS will be deducted at a source while making payments of bills
(4) In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-
10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there
is a change as per actual mix design the cost of difference of cement consumption have been deducted from the rate
of original item at the rate of input rate mentioned in all the tender.
Signature of Bidder
Deputy Executive Engineer Divisional Accountant
Panchayat ( R&B) Sub Division Panchayat ( R&B) Division
Dharampur Valsad
SHEDULE B Page
Description of Item (With brif Specification And Rate in
Item No. Quantity Unit Amount
Reference to Book of Specifications) Figures
Executive Engineer
Panchayat ( R&B) Division
SHEDULE B Page
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
(Compressed)GRs - SBD with Index.pdf
1.0 Put To Tender DHR.PMAAGY (2024-25) 01 School Room.pdf
2.0 SBD DHR.PMAAGY (2024-25) 01 School Room.pdf
3.0 Specification DHR.PMAAGY (2024-25) 01 School Room.pdf
3.1 Building-Specification Book.pdf
BOQ-DHR-1.pdf
CamScanner 04-09-2025 15.03.58.pdf
DMO_2876_01-May-2025_273.pdf
SBD.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .