| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | ₹4.9 L | L1 | Accepted-AOC Lowest rate |
| 2 | L2₹4.9 LRejected-Finance UTTAR PRADESH | ₹4.9 L | L2 | Rejected-Finance hiest rate |
Tender Value
₹4.9 L
EMD Value
₹49,000
Closing Date
2 May 2026, 2:00 pmClosed
Rajeev mohan saxena
Office Executive officer Npp Pt. DDU Nagar chanda
WD No.15 me Paras yada se poltry form tak interlocking karya
2026_DOLBU_1140705_1
Letter no.437/NPP/Pt. DDUN/2026-27 Date 22.04.2026
Open Tender
Civil Works
30 days
Chandauli
WD No.15 me Paras yada se poltry form tak interlocking karya
3 documents required · 3 mandatory
₹500
Office Executive officer Npp Pt. DDU Nagar chanda
₹49,000
29 Jun 2026
24 Apr 2026
2 May 2026
24 Apr 2026
2 May 2026
24 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 1 | Cum | - | - |
| 2 | Supply of 80mm. Thick zig zag Shaped mechanicaly compressed interlocking cement concrete pavers block manufactured by high pressure and controlled vibration machine having minimum 5mm. Thick topping cp cement mixed 20% marble powder the compressive strength of concrete paver blocks shall not be less than 30MPa. & 4.5Kg./No. and ISI marked and as per drawing and confiming IRC-SP-63-2004 including cost of material, labour, T&P etc. required for proper completion of work as directed by E/I. | - | Sqm | - | - |
| 3 | M-150 brick work in 1:4 cement and sand of 1.25 fineness modulous mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work. SOR 305 | - | Cum | - | - |
| 4 | 12mm thick plaster with cement & fine sand of 1.25 F.M. mortar in 1:4 including supply of all materials labour and T&P etc. required for proper completion of work SI no-584 | - | sqm | - | - |
| 5 | Providing and laying in cement concrete 4: 2 :1 of not less than strength of M 150 stone ballast (40 mm. Nominal size) Zapproved coarse sand : 1 cement including supply of all materials, labour and T & P etc. required for proper completion of the work and curing complete including cost of form work in foundation and floors | - | Cum | - | - |
| 6 | Supply and Sinage board at site all complete work at site | - | Nos | - | - |
| 7 | Add GST 18 % | - | job | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.78 MB
BOQ_2130150.xls
BOQ • 0.28 MB
T1.pdf
Tender Documents • 1.76 MB
Download all tender documents and submit your bid