| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹10.2 L+₹59,478.72 (6.17%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | ABDUL SHEREEF N L1 | rajith k L2 |
|---|---|---|---|---|---|
| 1.00Anganwadi maintanance | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 92.08 | cum | 197.18 ₹18,157.12 Lowest | 209.4 ₹19,282.39 |
| 1.00 | OD221540/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. | 36.56 | cum | 4,573.56 ₹1,67,227.65 Lowest | 4,940.63 ₹1,80,649.2 |
| 1.00 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 40 mm nominal size derived from natural sources) | 2.96 | cum | 6,402.98 ₹18,984.84 Lowest | 6,798.72 ₹20,158.2 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 12.35 | cum | 8,029.93 ₹99,193.73 Lowest | 8,525.28 ₹1,05,312.78 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 17.99 | sqm | 295.63 ₹5,318.38 Lowest | 313.87 ₹5,646.52 |
| 1.01 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 6.75 | cum | 9,777.81 ₹66,000.22 Lowest | 10,381.23 ₹70,073.3 |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 64.6 | sqm | 772.05 ₹49,874.43 Lowest | 819.75 ₹52,955.85 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1,504.56 | kilogram | 86.02 ₹1,29,422.25 Lowest | 91.38 ₹1,37,486.69 |
| 1.01 | 50.18.9.17.2:Providing and fixing PVC pipes including fixing the pipe with clamps/clips at 1.00 m spacing. This includes jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 63 mm dia 4 Kgf/cm2- External work - exposed on wall | 4 | metre | 224.77 ₹899.08 | 207.3 ₹829.2 Lowest |
Tender Value
₹11.8 L
EMD Value
₹29,592
Closing Date
30 Sept 2025, 5:00 pmClosed
ASSISTANT ENGINEER
OFFICE OF THE LIDEW KUTTIKOL
BUILDING MAINTAINANCE
2025_LSGD_800705_1
ET/3/AE/LIDEW/KKL/25-26
Open Tender
Civil Works - Buildings
Item Rate
45 days
KUTTIKOL
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,760
Yes
₹29,592
Yes
3 Nov 2025
23 Sept 2025
3 Oct 2025
23 Sept 2025
30 Sept 2025
23 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .