| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.3 LAccepted-AOC | 1 | Accepted-AOC 1 | |
| 2 | 2₹5.0 L+₹77,144 (18.1%)Accepted-AOC | 2 | Accepted-AOC 2 | |
| 3 | 3₹4.9 L+₹65,440 (15.3%)Accepted-AOC KERALA KL | 3 | Accepted-AOC 3 |
Tender Value
Refer Docs
EMD Value
₹11,170
Closing Date
16 Oct 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASSISTANT ENGINEER OFFICE
ASSISTANT ENGINEER OFFICE LSGD SECTION KODANCHERY
CONSTRUCTION OF WELL
2021_LSGD_443559_1
02/AE/LSGD/KDRY/21-22
Open Tender
Civil Works - Water Works
Item Rate
120 days
KODENCHERY
Please refer Tender documents.
5 documents required · 5 mandatory
₹893
Yes
₹11,170
Yes
1 Feb 2022
6 Oct 2021
20 Oct 2021
6 Oct 2021
16 Oct 2021
6 Oct 2021
6 Oct 2021 - 16 Oct 2021
60 days
Amount
Construction of Well
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
od1116819/2020_2021 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m to 3.00, for well construction<br>All kinds of soil for first depth after initial depth
od1116820/2020_2021 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 3.00 m to 4.50, for well construction<br>All kinds of soil for second depth after initial depth
od1116821/2020_2021 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 4.5 m to 6.00m, for well construction<br>All kinds of soil for third depth after initial depth
od1116822/2020_2021 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 6.00 m to 7.50 m, for well construction<br>All kinds of soil for forth depth after initial depth
od777586/2020_2021 : well steining- Laterite masonry with neatly dressed laterite stone of size 40x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc.
5.7 : Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) : 3 graded stone aggregate 20 mm nominal size)
5.9.12 : Centering and shuttering including strutting, etc. and removal of form for:Well steining
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od777603/2020_2021 : Providing filtration unit using 20 mm , 12 mm and 6 mm metal (30%,30%and 40%) for surrounding the well 50 cm width and 150 cm depth including all expenses
51.2.3 : Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
od777604/2020_2021 : Providing and fixing M.S. Grills of required pattern in frames of covering net for well etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete.<br>
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
13.4.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand)
GOPALAKRISHNAN KM
ARUN CONSTRUCTION
Bidder Name
GOPALAKRISHNAN KM
ARUN CONSTRUCTION
MINHAJ A T
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_631869.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .