| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LQualified | L1 | Qualified MSE, Category: General | |
| 2 | L2₹2.5 L+₹21,060 (9.13%)Qualified 711 712 YASHKAMAL BUILDING NR KALAGHODA CIRCLE SAYAJIGUNJ VADODARA GUJARAT 390020 UDYAM GJ 24 0059576 | VADODARA | GUJARAT | 390020 | L2 | Qualified MSE, Category: General | |
| 3 | L3₹3.0 L+₹69,660 (30.2%)Qualified 204 2ND FLOOR 15A 15B BUDH VIHAR COLONY TAKROHI INDIRA NAGAR LUCKNOW LUCKNOW UTTAR PRADESH 226016 | LUCKNOW | UTTAR PRADESH | 226016 | L3 | Qualified MSE, Category: General |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
13 Dec 2024, 4:00 pmClosed
Repair maintenance of transformer 200 KVA
7116587
GEM/2024/B/5588625
Two Packet Bid
Taking down carefully transformer 200 KVA from pole oblique plinth by dismantling disconnecting HT
15 days
Gujarat; Vadodara
Total value wise evaluation
BOQ
2 documents required · 2 mandatory
Exempted
13 Dec 2024
22 Nov 2024
13 Dec 2024
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | Taking down carefully transformer 200 KVA from pole oblique plinth by dismantling disconnecting HT and LT sides comma earthing of transformer | Taking down carefully transformer 200 KVA from pole oblique plinth by dismantling disconnecting HT and LT sides comma earthing of transformer comma supporting angles oblique cross arms for repair comma opening of top cover comma replacing of all joints oblique types of gaskets HV oblique LV coils HV oblique LV bushings comma LV metal parts comma breather assembly etc and reassembling the same after repairs installing recommissioning the transformer at its original place connecting up HT and LT sides earthing and supporting angles oblique cross arms etc and testing | 1 | Each Job | Vadodara | 10 |
| 2 | Material and labour for shifting of the transformer mounted on plinth oblique pole from existing location to workshop and vice versa | Material and labour for shifting of the transformer mounted on plinth oblique pole from existing location to workshop and vice versa including testing reporting and commissioning cost of material paid seperately | 1 | Each Job | Material And Labour HV Copper Vadodara Coil Replacement | 10 |
| 3 | Material and labour HV copper coil replacement | Material and labour HV copper coil replacement per phase as per IS | 1 | Each | Material And Labour LV Copper Vadodara Coil Replacement | 10 |
| 4 | Material and labour LV copper coil replacement | Material and labour LV copper coil replacement per phase as per IS | 2 | Each | Material And Labour Silica Vadodara Gel Breather | 10 |
| 5 | Material and labour silica gel breather | Material and labour silica gel breather with assembly | 1 | Each | Vadodara | 10 |
| 6 | Rubbersied cork sheet gasket of 6mm thickness for top cover | Rubberised cork sheet gasket of 6mm thickness for top cover of transformer | 5 | Sqm | Vadodara | 10 |
| 7 | Material and labour HV bushing | Material and labour HV bushing | 3 | Each | Vadodara | 10 |
| 8 | Material and labour LV bushing | Material and labour LV bushing | 3 | Each | Material And Labour Transformer Vadodara Oil | 10 |
| 9 | Material and labour transformer oil | Material and labour transformer oil | 290 | Ltr | Vadodara | 10 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_7116587.pdf
GEM_BID
brief_details_2024-11-08-16-05-17_edba58fcf25910aebabdf607aab2946d.pdf
BOQ
boq_2024-02-16-17-30-35_c077553faa875bd05bea780788c_2024-11-08-16-05-17_7ee2a344a3c1bac9b78fa7a14ffe52b6.csv
BOQ
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .