Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.2 LAdmitted-Fee/PreQual/Technical/Finance | ₹14.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹15.4 L+₹1.2 L (8.14%)Admitted-Fee/PreQual/Technical/Finance | ₹15.4 L+₹1.2 L (8.14%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹15.6 L+₹1.4 L (9.78%)Admitted-Fee/PreQual/Technical/Finance | ₹15.6 L+₹1.4 L (9.78%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹16.5 L+₹2.3 L (16.3%)Admitted-Fee/PreQual/Technical/Finance | ₹16.5 L+₹2.3 L (16.3%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Registration and Terms & Conditions not Correct (attached document related to CD PWD, Roorkee) |
| Sl No | Description | Qty | Unit | KURBAN CONSTRUCTION L4 | RUDRAN ENGINEERING L1 | Tulsi Constructions L3 | M/s Jogender Singh Contractor L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | WBM Grading 2
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. | 140.63 | Cum | 1,200 ₹1,68,756 | 1,670 ₹2,34,852.1 | 850 ₹1,19,535.5 Lowest | 2,400 ₹3,37,512 |
| 2.00 | WBM Grading 3
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. | 140.63 | Cum | 1,200 ₹1,68,756 | 1,900 ₹2,67,197 | 900 ₹1,26,567 Lowest | 2,400 ₹3,37,512 |
| 3.00 | Interlocking Concrete Block Pavement
Providing and Laying of Interlocking Concrete Block (M-35) Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504. | 1,725 | sqm | 495 ₹8,53,875 | 388.25 ₹6,69,731.25 | 580 ₹10,00,500 | 300 ₹5,17,500 Lowest |
| 4.00 | Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing ofsides and bottom and backfilling in trenches with excavated suitable material. | 82.8 | cum | 50 ₹4,140 Lowest | 155 ₹12,834 | 80 ₹6,624 | 100 ₹8,280 |
| 5.00 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:3:6 | 32.02 | cum | 3,500 ₹1,12,070 | 3,000 ₹96,060 | 2,800 ₹89,656 Lowest | 3,000 ₹96,060 |
| 6.00 | Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 Brick masonry in 1:4 cement mortar | 47.61 | cum | 4,800 ₹2,28,528 | 1,900 ₹90,459 Lowest | 2,800 ₹1,33,308 | 3,000 ₹1,42,830 |
| 7.00 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 M - 20 | 21.95 | cum | 3,800 ₹83,410 | 2,000 ₹43,900 Lowest | 3,200 ₹70,240 | 3,500 ₹76,825 |
| 8.00 | Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 | 220.8 | sqm | 160 ₹35,328 | 35 ₹7,728 Lowest | 70 ₹15,456 | 100 ₹22,080 |
Tender Value
Refer Docs
EMD Value
₹75,000
Closing Date
12 Aug 2026, 3:00 pmClosed
EE, PD, PWD, Haridwar
EE, PD, PWD, Haridwar
Construction of link road and construction of internal roads using interlocking tiles up to the Sant Kripal Nagar Ashram (Rawli Mahdood) in Shivalik Nagar Distt. Haridwar under District Sector (Job 1)
2026_pwd_98300_1
1801/2A Dated 15.07.2026
Open Tender
Civil Works - Roads
Item Rate
90 days
Haridwar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
EE, PD, PWD, Haridwar (through E-Challan)
₹75,000
18 Aug 2026
30 Jul 2026
13 Aug 2026
30 Jul 2026
12 Aug 2026
4 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | WBM Grading 2
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. | 140.63 | Cum | - | - |
| 2 | WBM Grading 3
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. | 140.63 | Cum | - | - |
| 3 | Interlocking Concrete Block Pavement
Providing and Laying of Interlocking Concrete Block (M-35) Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504. | 1,725 | sqm | - | - |
| 4 | Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing ofsides and bottom and backfilling in trenches with excavated suitable material. | 82.8 | cum | - | - |
| 5 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:3:6 | 32.02 | cum | - | - |
| 6 | Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 Brick masonry in 1:4 cement mortar | 47.61 | cum | - | - |
| 7 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 M - 20 | 21.95 | cum | - | - |
| 8 | Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 | 220.8 | sqm | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
TC_Tiles_CC.pdf
Tender Documents • 0.28 MB
BOQ_115997.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .