Loading…
Loading…
Tender Value
₹2.7 L
EMD Value
₹5,500
Closing Date
5 Sept 2026, 11:00 am
EEWS(WEST)
212 RASHBEHARI AVENUE, KOLKATA 700019
RESTORATION DAMAGE LEAKY PORTION OF 900 MM DIA PSC FILTERED WATER MAIN NEAR P-45 GORAGACHA RD, IN WARD NO 79.
2026_KMC_1038719_1
KMC/WS/W79-6/T-13/26-27
Open Tender
CIVIL WORKS
Percentage
7 days
NEAR P-45 GORAGACHA RD
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,500
19 Aug 2026
19 Aug 2026
7 Sept 2026
19 Aug 2026
5 Sept 2026
19 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.1 Earth work in
excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as
required complete. (a) Depth of excavation not exceeding 1,500 mm. | - | CUBIC METER PERCENT | 119.27 | - |
| 2 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.1 Earth work in
excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (b) Depth of excavation for additional depth
beyond 1,500 mm. and upto3,000 mm. but not requiring shoring | 0.82 | CUBIC METER PERCENT | 192.38 | ₹158.52 |
| 3 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING,
BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.1 Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(c) Depth of excavation for additional depth beyond 3000 mm. upto 4000mm. excluding cost of shoring as necessary | - | CUBIC METER PERCENT | 234.7 | - |
| 4 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING &
SIGNALING AND SITE CLEANING ETC.1.6 Hire and labour charges for shoring work(including necessary close plank walling, framing,Eucalyptus/Jhou bulla piling, strutting etc)complete as per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge).(a) Depth upto 1.5 m. | - | SQUARE METER | 386 | - |
| 5 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING &
SIGNALING AND SITE CLEANING ETC.1.6 Hire and labour charges for shoring work(including necessary close plank walling, framing,Eucalyptus/Jhou bulla piling, strutting etc)complete as perdirection of the Engineer-in charge for foundation excavation (verticalsurface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge).(b) For additional depth beyond 1.5 m. and upto
3.00 m | 0.44 | SQUARE METER | 439 | ₹193.16 |
| 6 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING &
SIGNALING AND SITE CLEANING ETC. 1.6 Hire and labour charges for shoring work(including necessary close plank walling, framing,Eucalyptus/Jhou bulla piling, strutting etc)complete as perdirection of the Engineer-in charge for foundation excavation (verticalsurface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge).(c) For additional depth beyond 3.00 m. | 1 | SQUARE METER | 498 | ₹498 |
| 7 | BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS,
GATES ETC. A. ORIGINAL WORKS 3. Cutting to requisite length or shape departmental R.S. joists,channels, angles, tees, plates etc. (Payment to be made on area of cut surface) | 0.6 | SQUARE CENTIMET ER | 8 | ₹4.8 |
| 8 | M.S. PLATES AS PER IS: 2062-2011/ LATEST REVISION , MAKE: SAIL/TATA/JINDAL M.S. PIPE B) ABOVE 2MM UPTO 10 MM THICKNESS. | 0.09 | KILOGRAM | 73 | ₹6.92 |
| 9 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING &
SIGNALING AND SITE CLEANING ETC. 1.9 Hire and labour charges for 100 mm dia bamboo railing on Jhau /Eucalyptus post 1.40 m above G.L and 0.60 m below G.L tied strongly withbamboo railing with coir rope, digging holes for posts in any sort of soil or concrete surface packing the sides etc including cost of carriage of all materials and labour complete including cost of restoration to the damages of the ground to its original condition as per direction of Engineer- incharge after removing the barricade. (Cost of restoration to be paid separately.) (a) 100 mm. dia bamboo railing and 150 mm. dia. Jhaubullah / Eucalyptus posts @1.80 m. apart (i) Railing with 4 rows. | - | METER | 82 | - |
| 10 | BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS,
GATES ETC. B. REPAIRING 2. Welding in M.S. structural work with gas or electric: (a) Tack weld | - | POINT | 9 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
tbid.pdf
Tender Documents • 0.42 MB
BOQ_2551539.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].