| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹78.3 LAccepted-AOC | 1 | Accepted-AOC WORK AWARDED | |
| 2 | 2₹81.0 L+₹2.7 L (3.42%)Rejected-Finance | 2 | Rejected-Finance SECOND LOWEST RATE | |
| 3 | Rejected-Technical | - | Rejected-Technical Highest rate | |
| 4 | Rejected-Technical | - | Rejected-Technical Third lowest rate |
Tender Value
₹81.0 L
EMD Value
₹50,000
Closing Date
7 Sept 2020, 6:00 pmClosed
Executive Engineer
Executive Engineer Harbour Engineering Division, Alappuzha
Upgradation of coastal roads in Alappuzha District - Upgradation of road from Kadathu kadavu (Ferry) in Ward No. 9 Ulunthi to Puramthada in Budhanoor Panchayath in Chengannur LAC
2020_HED_358765_2
15/2020-21/EE/e-T/s
Open Tender
Civil Works - Roads
Item Rate
270 days
Budhanoor Panchayath
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,760
Yes
online
₹50,000
Yes
16 Jan 2021
24 Aug 2020
14 Sept 2020
24 Aug 2020
7 Sept 2020
24 Aug 2020
Amount
APPENDIX:- A - CONSTRUCTION OF BITUMINOUS ROAD (MoRD)
4.9 : Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead
5.1.1a : Prime Coat :- Low porosity <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
5.2.3a : Tack Coat <br>Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
od501/2020_2021 : 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen)Binder bitumen S-65&lt;br&gt;Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.(sherdded plastic waste havinng thickness less than 50 micron is sprayed over thev 165 c heated stone aggregate mix with 30 seconds and then mixed with hot bitumen)&lt;br&gt;Case - II By Mechanical Means&lt;br&gt;(I) Bitumen (S-65) with 7% of sherededd plastic
5.12.A.3.2a : Seal Coat - Manual Means - Type C - Bitumen S-65 <br> Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 <br> A. By Manual Means :- Case - III : Type C <br> (II) Bitumen (S-65)
Quarry muck filling
51.2.3 : Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
APPENDIX:- B - CONSTRUCTION OF PROTECTION WALL (RIVER SIDE)
3.5.2 : Excavation in Soil with Dozer with lead upto 100 m <br> Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections.
11.4.1.1 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203I.P.C.C grade M 10(i)Nominal mix 1:3:6
11.4.5 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203V. R.C.C. grade M 25
12.5.4 : Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204For height upto 5 mIV.R.C.C. grade M 25
12.5.3 : Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204For height upto 5 m III.R.C.C grade M 20
11.8 : Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
12.5.2.1 : Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204For height upto 5 mII.P.C.C. grade M 20 (i)Nominal mix (1:2:4)
DR masonry
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
60.64.1 : Coconut Pile - Supplying and stacking well matured straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete.
60.64.4 : Coconut Pile - Driving down coconut pile to lines and levels through variuos strata including all hire charges and labour for fixing , staging platform and all other appliances necessary for pile driving down after pointing the bottom end
60.64.6 : Cutting and removing the excess length of wooden piles to lines and levels and removing the cut end of piles and stacking within 150m
Filling
od6218/2018_2019 : construction of embankment with material obtained from borrow pits. Construction of embankment with approved material obtained from borrow pits with a lift up to 1.5m transporting to site , spreading , grading to reuired slope and compacting to meet requirement of tables 300.1 and 300.2
AKARSHKUMAR P
SHIHAB S
MUHAMMED AFSAL
Bidder Name
SUNIL CHANDRAN
SHIHAB S
AKARSHKUMAR P
MUHAMMED AFSAL
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_537929.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .