| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.1 LAccepted-AOC | ₹30.1 L Quoted ₹25.5 L | L1 | Accepted-AOC AOC IS ACCEPTED DUE TO L1 |
| 2 | L2₹26.0 LRejected-Finance | ₹26.0 L | L2 | Rejected-Finance BID IS REJECTED DUE TO L2 |
| 3 | L3₹28.4 LRejected-Finance | ₹28.4 L | L3 | Rejected-Finance BID IS REJECTED DUE TO L2 |
| 4 | L4₹31.1 LRejected-Finance | ₹31.1 L | L4 | Rejected-Finance BID IS REJECTED DUE TO L2 |
| 5 | Rejected-Technical | - | - | Rejected-Technical REJECTED DUE TO NOT QUALIFIED IN TECHNICAL EVALUATION |
| Sl No | Description | Qty | Unit | M/S VASUDEV CONSTRUCTION L3 | M/S ARYA CONSTRUCTION L1 | ABHISHEK ASSOCIATES L2 | PRATENDRA SINGH L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth as per site requirement and with removal and proper disposal of surplus earth including all cost of material, labour, T&P etc. as per directed by engineer-in-charge for proper completion of work. | 1,016.05 | CUM | 50 ₹50,802.50 | 52 ₹52,834.60 | 40 ₹40,642 | 140.06 ₹1.4 L |
| 2.00 | Supply and laying of Ordinary Sand till GL for easily abd early compaction including cost of all material labour T&P etc. as per directed by engineer in charge complete for proper completion of work. | 71.65 | CUM | 500 ₹35,825 | 1,091 ₹78,170.15 | 700 ₹50,155 | 742.6 ₹53,207.29 |
| 3.00 | Centering & shuttering fo C.C. work in defferent parts of structures all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P. etc. | 151.95 | SQM | 5,000 ₹7.6 L | 337 ₹51,207.15 | 250 ₹37,987.50 | 567.66 ₹86,255.94 |
| 4.00 | Cement Concrete in (1:3:6) M20 mix with Cement, Coarse Sand (F.M. not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc. as per directed by engineer in charge complete for proper completion of work | 40.85 | CUM | 5,700 ₹2.3 L | 4,097 ₹1.7 L | 4,600 ₹1.9 L | 5,800 ₹2.4 L |
| 5.00 | Centering & shuttering fo RC.C. work in defferent parts of structures all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P. etc. | 186.15 | SQM | 400 ₹74,460 | 554 ₹1.0 L | 300 ₹55,845 | 660 ₹1.2 L |
| 6.00 | RCC 1:2:4 including all costs of T&P material required for proper completion of work as directed by Engineer-in -charge. | 150.1 | CUM | 600 ₹90,060 | 4,760 ₹7.1 L | 5,300 ₹8.0 L | 6,485 ₹9.7 L |
| 7.00 | Provide & Fixing PVC water stop for expantion/ construction joint including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge | 14 | RM | 65,000 ₹9.1 L | 650 ₹9,100 | 600 ₹8,400 | 190 ₹2,660 |
| 8.00 | Providing & Fixing pvc pipe 75 mm dia for weep hole above FSL and zigzag @ 1.00 mtr distance centre to centre along both sides of the Abutment in position including cost of all mterial, labour and T&P for proper complition of work. | 14 | RM | 250 ₹3,500 | 83 ₹1,162 | 70 ₹980 | 190 ₹2,660 |
| 9.00 | Providing & Fixing steel Angle 50 x50 x 8 mm at vertical joints edge including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 8.35 | RM | 8,000 ₹66,800 | 208 ₹1,736.80 | 200 ₹1,670 | 285 ₹2,379.75 |
| 10.00 | Providing and fixing of nomitax Board for expansion / construction joint i/c all cost of material labour T & P etc. for proper comp. of work. | 7.1 | SQM | 2,000 ₹14,200 | 1,082 ₹7,682.20 | 1,100 ₹7,810 | 285 ₹2,023.50 |
Tender Value
₹31.6 L
EMD Value
₹63,000
Closing Date
12 Nov 2025, 2:00 pmClosed
EE, MGCCD 14, GARHMUKTESHWAR
EE, MGCCD 14, GARHMUKTESHWAR
CONSTRUCTION OF CROSS DRAINAGE (PIPE SYPHON) AT KM. 1.020 OF HASANPUR DY
2025_UPIDC_1086514_2
05/EE/2025-26
Open Tender
Civil Works
120 days
HASANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹63,000
27 Feb 2026
29 Oct 2025
12 Nov 2025
29 Oct 2025
12 Nov 2025
29 Oct 2025
Amount
Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth as per site requirement and with removal and proper disposal of surplus earth including all cost of material, labour, T&P etc. as per directed by engineer-in-charge for proper completion of work.
Supply and laying of Ordinary Sand till GL for easily abd early compaction including cost of all material labour T&P etc. as per directed by engineer in charge complete for proper completion of work.
Centering & shuttering fo C.C. work in defferent parts of structures all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P. etc.
Cement Concrete in (1:3:6) M20 mix with Cement, Coarse Sand (F.M. not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc. as per directed by engineer in charge complete for proper completion of work
Centering & shuttering fo RC.C. work in defferent parts of structures all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P. etc.
RCC 1:2:4 including all costs of T&P material required for proper completion of work as directed by Engineer-in -charge.
Provide & Fixing PVC water stop for expantion/ construction joint including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge
Providing & Fixing pvc pipe 75 mm dia for weep hole above FSL and zigzag @ 1.00 mtr distance centre to centre along both sides of the Abutment in position including cost of all mterial, labour and T&P for proper complition of work.
Providing & Fixing steel Angle 50 x50 x 8 mm at vertical joints edge including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing and fixing of nomitax Board for expansion / construction joint i/c all cost of material labour T & P etc. for proper comp. of work.
Cutting, Bending, Binding & Placing in position of steel reinforcement with all wastage, carriage and including all labour material and T&P etc complete for proper completion materials, labour and T&P etc.
P/f RCC Hume Pipe 1200 mm dia NP-3 type including cost of all material, labour, T&P etc for proper completion of work complete as directed by Engineer-in- charge.
Provide & Laying Boulder 40.00 to 70.00 kg.wt in pitching with all lead and lift including cost all labour, T&P material etc complete for proper completion of work as per direction of Engineer - in charge.
Earth work in Filling in embankment in ordinary soil including ramming and dressing the surface to be required levels and slopes and also including all lift and Lead upto 600 m distance including cost of all Labour T&P etc complete as directed by Engineer-in- charge.
Supplying & Fixing B.M. plate 150 X 150 X 25 mm. Size i/c all cost of material, labour T&P etc. for proper comp. of work.
Supplying & Fixing Marble Name & year plate 450 X 300 X 25 mm. Size i/c all cost of material, labour T&P etc. for proper comp. of work.
ABHISHEK ASSOCIATES (BID ID -5665394)
M/S VASUDEV CONSTRUCTION (BID ID -5670628)
PRATENDRA SINGH (BID ID -5670230)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.49 MB
02.pdf
Tender Documents • 2.56 MB
BOQ_1992247.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid