Loading…
Loading…
Tender Value
₹81.7 L
EMD Value
₹81,747
Closing Date
6 Jul 2026, 4:30 pmClosed
Sri Bramarambha Sametha Sri Mallikarjuna Swamy Tem
Sri Bramarambha Sametha Sri Mallikarjuna Swamy Temple, Nippatiapadu (V), Chimakurthy (M), Prakasam District
Completion of Balance Works at Sri Bramarambha Sametha Sri Mallikarjuna Swamy Temple, Nippatiapadu (V), Chimakurthy (M), Prakasam District
950116
P/COE/896/2026-142
OPEN - NCB
Civil Works
PRAKASAM, ANDHRA PRADESH
14 documents required · 13 mandatory · 1 optional
₹2,894
₹81,747
22 Jun 2026
22 Jun 2026
22 Jun 2026
( Balance work of Sri Bramarambha Sametha Sri Mallikarjuna Swamy Temple at Nippatlapadu Village, Chumakurty (M),Prakasam (D).)Earth work excavation for foundations (Manual Means) of buildings, septic tank, sump, compound wall in ordinary soils and depositing on bank with an initial lead of 10m and 1m additional lift charges over the initial depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding seigniorage excluding dewatering charges etc.
Filling with carted coarse sand in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental ,labour charges,hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, excluding seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work.
Random Rubble stone masonry in CM (1:6) prop: (Cement: Screened sand) using hard granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand, water, stones etc., from approved quarry, to site and excluding seigniorage charges, sales & other taxes on all materials including labour for cutting stones to required size and shape, mixing, of cement, mortar, construction, curing etc.,and overheads & contractors profit complete for finished item of work in foundation and basement.
Supplying and fixing of hard granite stone for required ornamentation including cost and conveyance of stone rough dressing palamana dressing cost of tool making charges cost of jointing charges etc.(A) Cost of stone
(B)Rough Dressing-Chitravanam to Upapeetam-kapothakam
Pillars to Vyalam
(C)5 Line Palmana dressing-Chitravanam
Upapetam padma jagati
Upapeetam Kantam
Upapetam Kapothakam
Kodangai Bottom
Pushpa Pothika 2 sides
Pushpa Pothika 3 sides
Pushpa Pothika 4 sides
Cost of Tool making charges
Labour Charges for Jointing
VRCC M-20 grade nominal mix (cement :fine aggreegate: coarse aggregate) corresponding to table 9 of IS456 using 20mm size machine crushed hard granite metal (coarse aggreegate)from approved Quarry including cost and conveyancej of all materials like cement,fine aggregate(sand) coarse aggregate, water etc, to site and excluding seigniorage charges,sales and other taxes on all materials including all operational incidental and labour charges such as machine mixing , laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering shuttering :(A)For 5'' thick roof slab of M.M
Supplying & fixing in position the following steel bars for all RCC works including cost and conveyance of steel to work site and including straightening, cutting, bending, hooking, lapping or welding where required and placing in position, tying with binding wire of cost of binding wire, anchoring to the adjoining members wherever necessary approved quality and gauge including etc., complete as per design specifications and directions.
Supplying and fixing of scaffolding including cost & conveyance of all materials such as casurina poles,bamboos,bamboos mats and coir rope etc.,including all labour charges complete for finished item of work(Up to 20.0ht)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.01 MB
Tender Document.docx
TENDER_DOCUMENT • 0.18 MB
BOQItems.xls
TENDER_DOCUMENT • 0.57 MB
Nippatlapadu.pdf
TENDER_DOCUMENT • 6.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .