Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.1 LAccepted-AOC | ₹15.1 L | L1 | Accepted-AOC ACCEPT |
| 2 | L2₹16.4 L+₹1.3 L (8.84%)Rejected-AOC | ₹16.4 L+₹1.3 L (8.84%) | L2 | Rejected-AOC REJECT |
| 3 | L3₹17.0 L+₹1.9 L (12.6%)Rejected-AOC KASARAGOD MUNICIPAL CORPORATION KASARAGOD | KASARAGOD | KASARAGOD | KERALA | 671121 | ₹17.0 L+₹1.9 L (12.6%) | L3 | Rejected-AOC REJECT |
| Sl No | Description | Qty | Unit | MOHAMMED ALI C H L2 | AFSAL A A L3 | ABDUL RAHIMAN K A L1 |
|---|---|---|---|---|---|---|
| 1.00BUILDING | ||||||
| 1.00 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 2,870.76 | kg | 88 ₹2,52,626.88 | 97 ₹2,78,463.72 | 85.96 ₹2,46,770.53 Lowest |
| 1.00 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 69.12 | sqm | 760 ₹52,531.2 | 800 ₹55,296 | 754 ₹52,116.48 Lowest |
| 1.00 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 5.83 | cum | 10,400 ₹60,652.8 | 11,200 ₹65,318.4 | 9,567 ₹55,794.74 Lowest |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 63.5 | sqm | 637 ₹40,452.05 | 637 ₹40,452.05 | 567 ₹36,006.77 Lowest |
| 1.00 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 26.1 | sqm | 500 ₹13,050 Lowest | 500 ₹13,050 Lowest | 788 ₹20,566.8 |
| 1.01 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 35.9 | metre | 200 ₹7,180 | 200 ₹7,180 | 178 ₹6,390.2 Lowest |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 108.23 | sqm | 800 ₹86,582.4 | 800 ₹86,582.4 | 712 ₹77,058.34 Lowest |
| 1.01 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size). | 36.42 | cum | 10,600 ₹3,86,009.6 | 11,200 ₹4,07,859.2 | 10,038 ₹3,65,543.81 Lowest |
| 1.01 | 50.6.1.1:Solid block masonry using pre cast solid blocks ( factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part 1 of 1979 for foundation and plinth with thickness 20 cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 34.36 | cum | 7,000 ₹2,40,548 | 6,800 ₹2,33,675.2 | 5,214 ₹1,79,173.9 Lowest |
Tender Value
₹16.9 L
EMD Value
₹42,337
Closing Date
20 Aug 2025, 11:00 amClosed
ASSISTANT ENGINEER
Office of the Assistant Engineer LID EW Section Chemnad Grama Panchayat Perumbala P O koliyadukkam PIN 671317
Annual Plan PR No 738 Construction of class room for Bendichal School
2025_LSGD_784628_1
3/2025-26/AE/LSGD/CHMD
Open Tender
Civil Works - Buildings
Item Rate
CHEMNAD GRAMA PANCHAYAT
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹42,337
Yes
22 Nov 2025
11 Aug 2025
20 Aug 2025
11 Aug 2025
20 Aug 2025
11 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .