Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.4 LAccepted-AOC | ₹8.4 L | 1 | Accepted-AOC L1 |
| 2 | 2₹8.9 L+₹46,200 (5.47%)Rejected-Finance | ₹8.9 L+₹46,200 (5.47%) | 2 | Rejected-Finance L2 |
| 3 | 3₹9.0 L+₹51,422 (6.09%)Rejected-Finance | ₹9.0 L+₹51,422 (6.09%) | 3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | Lehnu Ram L3 | Jagjeet Singh L1 | Sh. Chain Singh L2 |
|---|---|---|---|---|---|---|
| 1.00 | Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Dalli through skilled / unskilled manpower i.e pump operator, Helper, Chowkidar and Beldar for maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge.. | 1 | Job | 8,95,822 ₹8,95,822 | 8,44,400 ₹8,44,400 Lowest | 8,90,600 ₹8,90,600 |
| 2.00Description of main components of the scheme is as under:- | ||||||
| 2.01Civil works: 2 No pump house. Rising main: 1st stage 200mmdia 4650 Rmt, 2nd stage 100mmdia=1200Rmt, 3rd stage: 80mm dia3200 Rmt, 1st phase to Bhulsai 80mm dia=2400Rmt. Pumping machinery:Booster stage 1st=1x10=10 HP, Booster stage 2nd=1x5=5HP, 1st phase (old) stage)-2x90-180 HP, 1st stage=2x110=220HP, 2nd stage 2x25=50HP. Distribution system: Completed Total main storage tank: 3 Nos and 11 Nos sub storage tanks Total working hours 64 per day : through , 10 No person. Indicators to be mentioned:Average per day 3 Nos of complaints received thorugh differnt mode such as C.M Sanklap E-Samadhan, complaint register and toll free No. Quantity of water lifted per day: (510000 litr ). Pumping hours per day 15 and energy consumptoin per day 2702 Unit. | ||||||
Tender Value
₹8.1 L
EMD Value
₹16,100
Closing Date
16 Sept 2025, 11:00 amClosed
Executive Engineer
Jal Shakti Division Bilaspur
A/R and M/O LWSS Dalli in Tehsil Sadar District Bilaspur (SH Operation of pumping machinery and distribution system of water supply for sector storage tank to differed sub storage tanks for six months).
2025_HPIPH_113887_1
BLP-BLP-0736-NIT No. 7130-7229 Dated 03/09/2025
Open Tender
Civil Works
Item Rate
180 days
Sub Division Kandrouur Section Kandrour
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
₹16,100
19 Jun 2026
6 Sept 2025
16 Sept 2025
6 Sept 2025
16 Sept 2025
6 Sept 2025
Amount
Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Dalli through skilled / unskilled manpower i.e pump operator, Helper, Chowkidar and Beldar for maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge..
Description of main components of the scheme is as under:-
Civil works: 2 No pump house. Rising main: 1st stage 200mmdia 4650 Rmt, 2nd stage 100mmdia=1200Rmt, 3rd stage: 80mm dia3200 Rmt, 1st phase to Bhulsai 80mm dia=2400Rmt. Pumping machinery:Booster stage 1st=1x10=10 HP, Booster stage 2nd=1x5=5HP, 1st phase (old) stage)-2x90-180 HP, 1st stage=2x110=220HP, 2nd stage 2x25=50HP. Distribution system: Completed Total main storage tank: 3 Nos and 11 Nos sub storage tanks Total working hours 64 per day : through , 10 No person. Indicators to be mentioned:Average per day 3 Nos of complaints received thorugh differnt mode such as C.M Sanklap E-Samadhan, complaint register and toll free No. Quantity of water lifted per day: (510000 litr ). Pumping hours per day 15 and energy consumptoin per day 2702 Unit.
Sh. Chain Singh (BID ID -555365)
Lehnu Ram (BID ID -555375)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .