| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹2.7 L+₹37,768.23 (16.6%)Accepted-Finance | ₹2.7 L+₹37,768.23 (16.6%) | L2 | Accepted-Finance OK |
| 2 | L1₹2.3 LRejected-Finance | ₹2.3 L | L1 | Rejected-Finance BIDBER DEBARRED |
Tender Value
₹3.5 L
EMD Value
₹7,000
Closing Date
24 Mar 2025, 1:00 pmClosed
Executive Engineer
PHED Campus NH 68 Sanchore.
Demolition of OHSR Capacity 150KL RWSS Khara in Division Sanchore.
2025_PHCJO_453327_1
NIT No.29/2024-25 Item No.02
Open Tender
Civil Works
Item Rate
365 days
PHED Sanchore
As Per Tender Documents
3 documents required · 3 mandatory
₹500
MD,RISL
₹7,000
Yes
2 Apr 2025
18 Mar 2025
25 Mar 2025
18 Mar 2025
24 Mar 2025
18 Mar 2025
Amount
14.3 Demolishing of RCC Work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead.
14.5 Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work Payment shall be made on the cross sectional area of .C.C. or R.B. work) as per direction of Engineer-in-arge
14.6 Extra for scrapping, cleaning and straightening reinforcement from R.C.C. or R.B. work .
14.18 Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50metres lead.
14.43 Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes and including stacking of pipes within 50 meter lead :
14.43.1 14.5 15mm to 40mm nominal bore
14.41 Dismantling CI or asbestos rain water pipes with fittings and clamps including stacking of pipes lead at site within 50 meter, of dia:
14.41.2 100 mm dia pipes
14.52 Dismantling of CI sluice valve including stacking of useful materials within a lead of 50 meter:
14.52.1 Up to 150mm dia.
13.22 Providing and fixing double scaffolding system on the exterior side, upto five story made with 4" wooden member 1.5 m c/c horizontal and vertical direction joining with rassi, clamps, challies. The scaffolding system shall be stiffened with bracing, runner, connection of building if necessary with all essential safty features for the workmen etc complete as per direction of EI.The lavation area of the scaffolding shall be measured for payment. The payment will be made once irrespective of duration of scaffolding. Note : This item to be used for maintence work judicially
5.2 Carriage of material including loading & unloading Building Rubish Stone metal (Grit and Ballast etc.) (i) For 5 km
M/S mk builders (BID ID -3106825)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .