| 1 | 1₹2.7 CrAccepted-AOC | ₹2.7 Cr | 1 | Accepted-AOC approved |
| 2 | 2₹4.4 Cr+₹1.7 Cr (64.7%)Rejected-AOC | ₹4.4 Cr+₹1.7 Cr (64.7%) | 2 | Rejected-AOC approved |
| 3 | 3₹4.4 Cr+₹1.8 Cr (65.4%)Rejected-AOC NA | NA | NA | 121004 | ₹4.4 Cr+₹1.8 Cr (65.4%) | 3 | Rejected-AOC approved |
Tender Value
₹3.3 Cr
EMD Value
₹6.6 L
Closing Date
4 May 2024, 5:00 pmClosed
XEN BML CANAL AND GROUND WATER DIV PTA
XEN BML CANAL AND GROUND WATER DIV PTA
Rehabilitation of Sangatpura Minor by concrete lining from RD 43000-63500
2024_WR_119127_3
88/23-24
Open Tender
Civil Works
Item Rate
90 days
LUDHIANA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹6.6 L
2 Jul 2024
29 Apr 2024
6 May 2024
29 Apr 2024
4 May 2024
29 Apr 2024
Amount
Ordinary Jungle Clearance of both banks of running Disty., Minors and Drains including Boundary road with discharge upto 1.5 cumecs.
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.
Excavation of soil ( any type ) using hydraulic excavator CK 90 excavation with hydraulic excavator of 0.9 cum capacity including cutting trimming bottom and side slopes in accordance with requirement of grades and cross sections, includingall lift and combined lead upto 30 mtr.
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads (a) disposal carriage from 0 upto 450 m
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads (b) Extra for carriage of earth/soil beyond 450 m but upto 1 km with hydraulic tractor trolley. (Pucca)
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads (c)Extra rate for carriage of earth/soil per km along pucca bank of canal beyond 1st km but upto 10 km lead with hydraulic tractor & trolley
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads (d)Extra rate for carriage of earth/soil per km along pucca bank of canal beyond 10 km to 14 km lead with hydraulic tractor & trolley
Extra for laying earth as per specification for compaction in 20 Cm. layers and dressing including the cost of rolling and watering as per P.W.D specifications.
Earth work for lip cutting for lining of irrigation channels inclusive of all allowance leads and dressing( as per earth work statement) 0-1.5mt. depth
Dressing of Earth work ( NEW )
Dressing of side slopes and preparation of sub grade for lining complete in all respect as per PWD specifications.
Laying 1:3 (cement: water) cement slurry with cement @ 2.25 kg per sqm on prepared bed & side slope before laying concrete
Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII) for sleepers
Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII) (For bed & Side slopes)
Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII) For Coping
Filling of construction joints with sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight-10 mm depth
Filling expansion joints with special impervious hot pour 12.5 mm wide including supply ,carriage, of material complete in all respect as per design/drawing and PWD specifications
Providing and laying LDEP 150 micron over sleeper on construction joints and expansion joints complete in all respect as per design/drawing and PWD specifications
Shuttering for faces of concrete lining on side slopes and bed complete in all respect as per design/drawing and PWD specifications
Extra for Bitumen Painting @ 0.69 kg per sqm.
Dag Belling single kassi stroke minimum 7.5 cm. depth complete in all respect as per design/drawing and PWD specifications
Laying RCC 1:2:4 (M-15) excluding steel reinforcement but including centering and shuttering and vibrating the concrete.
Cement Concrete 1:3:6 (M-10) with stone ballast using concrete mixer volume metric type.
C.C. 1:4:8 with brick ballast 40 mm gauge
Cold twisted deformed (Ribbed/ Tor Steel Bar) Bars Fe-500 grade as per IS 1786-1985, for R.C.C works, where not including in the complete rate of RCC including bending and placing in position complete.
Earth Work involved in dismantling of outlet ’H’ upto 0.50mt.
Dismantling of APM of type outlet involved dismantling cement masonry & RCC slab with ‘H’ upto 0.50 mt.
Adjusting new APM block in correct ‘y’ and fixing in position
Brick masonry in 1:4 CSM
RCC M20 for slab
Extra labour for dressing of bricks for outlet with ‘H’ upto o.50 mt
supply of new APM/OF block
First class burnt brick work laid in cement sand mortar 1:4 in foundation and plinth
12.50 mm thick cement plaster 1:4
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary soil, Mechanical Means, Depth up to 3 m
Plain/Reinforced Cement Concrete (M15) in Open Foundation complete as per Drawing and Technical Specifications.
Plain/Reinforced cement concrete M20 in sub-structure With Batching Plant, Transit Mixer and Concrete Pump complete as per drawing and Technical Specifications
Plain/Reinforced cement concrete M25 in sub-structure With Batching Plant, Transit Mixer and Concrete Pump complete as per drawing and Technical Specifications
Plain/Reinforced cement concrete grade M30 in sub-structure with batching Plant, Transit Mixer and Concrete Pump complete as per drawing and technical specifications with Height up to 5m.
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing force. Complete as per drawing and MoRT&H Specifications
PCC M15 Grade as levelling course below approach slab complete as per drawing and Technical specification.
Drainage Spouts complete as per drawing no. SD/205 and MoRT&H MoRT&H specification clause 2705 with 6 meter long GI 100 mm dia drainage GI light grade pipe (For Bridges)
Provision of an Reinforced cement concrete crash barrier at the edges of the Bridge,road, approaches to bridge structures and medians, constructed with M-40 grade concrete , with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94- DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified-with concrete mixture.
Providing and laying 60 mm thick factory made cement concrete interlocking Paving blocks of M40 grade manufactured by block making machine equipped with steel mould clamped to a strong vibratory table with hydraulic pressure for compaction of concrete as per IRC SP 63 -2014 and of approved size and design / shape laid in Ordinary Grey Colour and pattern over and including 40 mm thick compacted bed of coarse sand, filling the joints with fine sand etc, all complete as per directions of Engineer-in Charge.
Dismantling of brick work in cement sand mortar / lime mortar including T&P scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material & staking the serviceable material with all lifts & lead of 100 metre (By Mechanical Means).
Dismantling of prestressed / RCC including T&P scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material. & staking the serviceable material with all lifts & lead of 100 metre (By Mechanical Means)
Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm.
Painting new letters and figures of black synthetic enamel paint to an even shade.
Providing and laying PCC M-10 in foundation & floor using well graded stone aggregates complete as per drawing and technical specifications.
Laying/ Dumping stone/Bajri (in jharies)
Rehandelling of Earthwork
Supplying fitting and placing HYSD bar reinforcement complete in sub structure as per drawing and technical specification
Providing and laying of strip seal expansion jiont catering to maximum horizontal movement upto 70 mm complete as per approved drawing and standard specification to be installed by the manufacturer / supplies or their authorized representative ensuring compliance to the manufacturers instructions for installation
ONKAR SHARMA CONTRACTOR
SUKHDEV SINGH CONTRACTOR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .