Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAccepted-AOC HIG 146 LUMBINI VIHAR SAILASHREE VIHAR CHANDRASEKHARPUR BHUBANESWAR 751021 | BHUBANESWAR | KHORDHA | ODISHA | 751021 | L1 | Accepted-AOC Awarded being L1 bidder | |
| 2 | L2₹2.6 Cr+₹8.9 L (3.59%)Rejected-Finance AT DEVIMANDAPSAHI PO PS NIMAPADA DIST PURI PIN 752106 | NIMAPADA | PURI | ODISHA | 752106 | L2 | Rejected-Finance Rejected being L2 bidder | |
| 3 | L3₹2.6 Cr+₹9.0 L (3.61%)Rejected-Finance AT PO CONTRACTORPADA DIST KANDHAMAL ODISHA | CONTRACTORPADA | KANDHAMAL | ODISHA | L3 | Rejected-Finance Rejected being L3 bidder | |
| 4 | L4₹2.6 Cr+₹9.7 L (3.90%)Rejected-Finance AT LINGIPUR PO SISUPALGARH PS DHAULI DIST KHURDHA PIN 751002 | LINGIPUR | KHURDHA | ODISHA | 751002 | L4 | Rejected-Finance Rejected being L4 bidder | |
| 5 | L5₹2.6 Cr+₹12.5 L (5.00%)Rejected-Finance AT PHULBANI SAHI PO CONTRACTOR PARA PS PHULBANI TOWN DIST KANDHAMAL | PHULBANI | KANDHAMAL | ODISHA | 726001 | L5 | Rejected-Finance Rejected being L5 bidder |
Tender Value
₹3.1 Cr
EMD Value
₹3.1 L
Closing Date
2 Sept 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CCE Phulbani (R and B) Circle Phulbani
Office of the CCE Phulbani RandB Circle Phulbani District Kandhamal PIN 762001
Repair and Renovation of K Nuagaon CHC under AMA Hospital Program in the District of Kandhamal
2026_EICCL_139088_1
CCE-R AND B-PLB-03 OF 2026-27
Open Tender
Civil Works - Buildings
Percentage
240 days
Balliguda
Please Refer Tender Documents
2 documents required · 2 mandatory
₹10,000
₹3.1 L
Yes
5 Nov 2026
19 Aug 2026
3 Sept 2026
19 Aug 2026
2 Sept 2026
19 Aug 2026
19 Aug 2026 - 1 Sept 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORK:
Removing old lime or cement plaster from walls including raking out joints 12 mm deep andremoving the debris within 50m lead | 2,647.97 | sqm | 58.9 | ₹1,55,965.43 |
| 2 | Dismantling and removing lime concrete flooring 7.5 cm to 10 cm thick including stacking the useful materials for reuse and removing the debris within 50 m lead | 865.91 | sqm | 162.1 | ₹1,40,364.01 |
| 3 | Dismantling and removing of door and windows and ventilators including removal of frame hinges, fastening and stacking the same to reuse and removing the debris within 50 m lead. | 223.5 | sqm | 465.1 | ₹1,03,949.85 |
| 4 | Dismantling and removing 2.5 cm thick grading concrete from roof slab cleaning the surface loweringand removing the debris within 50 m. | 1,058.67 | sqm | 132.6 | ₹1,40,380.17 |
| 5 | Earth Work in exavation of foundation in hard soil within initial leads of 50 m & lifts of 1.5m including dressing and levelling of bed etc. and adding contractor's profit and over head charges, etc. complete in all respect for the work as directed by the Engineer-in-charge. | 714.44 | cum | 282.9 | ₹2,02,115.08 |
| 6 | Supplying & filling of foundation with coarse sand well watered and rammed including cost, cost of all labour, carriage, royalty complete in all respect and as per direction of Engineer-in-Charge. | 502.62 | cum | 620.6 | ₹3,11,925.97 |
| 7 | Cement Concrete (1:3:6) using 4 cm size hard granite C.B. metal approved quality from approved quarry including cost, carriage, royalty, cost of all labour. etc complete. | 220.58 | cum | 6,534.7 | ₹14,41,424.13 |
| 8 | R.C.C.M-20 grade with 20 mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, centering shuttering etc complete but excluding cost of reinforcement.
Column Base Footing | 86.54 | cum | 6,941.6 | ₹6,00,726.06 |
| 9 | Column Super Structure
Ground Floor | 4.64 | cum | 16,324.5 | ₹75,745.68 |
| 10 | Concrete in Plinth Band | 22.24 | cum | 7,816 | ₹1,73,827.84 |
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_3.pdf
PDF • 1.41 MB
Tendernotice_2.pdf
PDF • 5.28 MB
Tendernotice_1.pdf
PDF • 2.24 MB
BOQ_606574.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .