Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance A 8 GREEN PARK NEW DELHI 110016 INDIA | NEW DELHI | SOUTH DELHI | DELHI | 110016 | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical Non-Responsive |
| 4 | Rejected-Technical T 10 3RD FLOOR CITY CENTRE PRESS COMPLEX PLOT NO 1 M P NAGAR ZONE I BHOPAL M P 462011 | BHOPAL | BHOPAL | MADHYA PRADESH | 462011 | Rejected-Technical Not Eligible |
Tender Value
Refer Docs
Closing Date
17 Sept 2020, 11:00 amClosed
Ashok Kumar Singh
General Manager (Technical) National Highways Infrastructure Development Corporation Ltd. 2nd Floor, PTI Building, 4- Parliament Street, New Delhi- 110001
Consultancy Services for Preparation of Detailed Project Report for 2 laning of Aizawl Bypass including Tunnel (Connecting Sairang on NH-306 to NH-02) in Mizoram under Bharatmala Pariyojna
2020_NHIDC_569046_1
NHIDCL/Miz/DPR/Aizawl Bypass/2020-21
Open Tender
Consultancy
Item Rate
180 days
Aizawl Mizoram
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,900
MD NHIDCL
Exempted
NHIDCL HQ, New Delhi
15 Oct 2020
4 Jul 2020
18 Sept 2020
4 Jul 2020
17 Sept 2020
10 Aug 2020
20 Jul 2020
Amount
Schedule A (Fixed Lumpsum Cost)
Remuneration for Local Staff (including per diem allowance)
A. KEY PROFESSIONALS
Team Leader Cum Senior Tunnel Engineer (1 no)
Tunnel Design Expert (1 no)
Highway cum Pavement Engineer (1 no)
Senior Geotechnical Engineer (1 no)
B. OTHER PROFESSIONALS
Senior E& M Engineer
Senior Geologist
Senior Surveyor Engineer
Environmental Specialist
Material Engineer
Quantity Surveyor/Documentation Expert
Land Acquisition Expert
Sub-Professional Staff: (To be assessed by Consultant as per requirement of assignment, Minimum 6 to be deployed)
Support Staff (Fixed Rates)
Office Manager (1 No.)
Typist (1 No.)
Office Boy (1 No.)
Night Watchman (1 No.)
Transportation (Fixed costs)
The vehicles hired by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for use of consultants (2 Vehicle for 6 months each)
Duty Travel to Site (Fixed Costs)
All Trips
Office Rent (Fixed Costs)
The rent cost includes operation & maintenance, cleaning, repairs, etc for entire duration of services.
Office Supplies, Utilities and Communication (Fixed Costs)
Office Supplies, Drafting Supplies, Computor Running Costs, Domestic and International Communication
Office Furniture and Equipment (Fixed costs)
Office Furniture and Equipment
Reports and Document (Fixed costs)
Monthly Report (03 sets)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment report & RAP
Final Environmental Assessment report & RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.
Final EMP
Final Bidding Documents
Draft 3(a) ,3(A) and 3(D) notification for land acquisition( 3 copies each)
LA & Clearances II Report
Survey and Investigation
A. Topographical Survey (Fixed Rate)
Complete Topographic Survey using mobile/ aerial LiDAR or equivalent/better technology for project approach area including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer, preparation of Drawings and their submission as per contract provision.
B. Investigation (Fixed cost)
All investigations/surveys including Road and Bridge Inventory, FWD Test and Pavement Evaluation, Roughness Survey, Axle Load Survey, Material Survey and Investigation, Sub-grade Investigation, Traffic Survey, Socio-economic & Census Survey/Studies, Land Acquisition Studies, etc.
Schedule B (Item rate costs)
Sub-soil Investigation & Other Works
Sub-Soil Investigation
a) Boring in all type of soils (other than hard rock)
b) Boring in hard rock
Resistivity based Geo-physical Investigations at portal locations of Tunnel.
Cost of supply and fixing Boundary Pillars
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval.
Land Acquisition Team including support staff and logistics/transportation
A. Land acquisition Team including support staff
Ex-Land Revenue Inspector/Officer or equivalent
Ex-Kanoongo/ Girdawar or equivalent
Ex-Patwari or equivalent
Typist
B. Logistics for Land acquisition Team
Computer including necessary peripherals
Printers
Vehicles (Bolero or equivalent) with monthly running limit of 4000 km
Intercontinental Consultants and Technocrats Pvt. Ltd.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .