| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-Finance | L1 | Accepted-Finance LOWEST AMOUNT | |
| 2 | L2₹8.4 L+₹79,422 (10.4%)Rejected-Finance | L2 | Rejected-Finance HIGEST AMOUNT | |
| 3 | L3₹8.7 L+₹1.1 L (14.4%)Rejected-Finance | L3 | Rejected-Finance HIGEST AMOUNT | |
| 4 | L4₹10.0 L+₹2.4 L (30.9%)Rejected-Finance | L4 | Rejected-Finance HIGEST AMOUNT | |
| 5 | L5₹10.0 L+₹2.4 L (30.9%)Rejected-Finance VILL PO GAGRET TEHSIL GHANARI DISTT UNA HP | UNA | HIMACHAL PRADESH | 174301 | L5 | Rejected-Finance HIGEST AMOUNT |
Tender Value
₹6.8 L
EMD Value
₹13,660
Closing Date
26 Feb 2022, 5:00 pmClosed
EE HPPWD DIVISION KOTLA BEHAR
EE HPPWD DIVISION KOTLA BEHAR
C.O LINK ROAD FROM MALKOA TALAI RATTAN BEHAR VIA DHIMAN BASTI CHALALI UP TO LINK ROAD BHARWAIN BEEHAN KM 0.0 TO 1.050 SUB HEAD 5.7 METER FORMATION CUTTING KM 0.300 TO 0.885 C.O R.WALL AT RD 0.340 TO 0.360
2022_PWD_57058_1
TENDER NOTICE KOTLA BEHAR
Open Tender
Civil Works
Item Rate
90 days
KOTLA BEHAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹350
₹13,660
14 Mar 2022
21 Feb 2022
28 Feb 2022
21 Feb 2022
26 Feb 2022
21 Feb 2022
Amount
Excavation for road way in hilly areas in all heights and depths and in all kinds of soil by manual/ mechanical means, including saturated soil comprising of ordinary soil, ordinary rock, soft rock, hard rock chiseling or wedging out of rock (where blasting is prohibited) and their intermediate classification of soil complete including setting out true to the required lines grades, cutting and trimming of side slopes, camber, super elevation and levels shown as per the drawings and as directed by the Engineer-in Charge complete in conformity with the requirements of MORD Technical Specification section 300 and 1600 and sorting out and stacking of useful materials with in all leads and lifts of material in acquired road width and transporting of un-useful materials for filling in road ways, camber, embankments for grade improvements and disposal of all surplus materials to the approved dumping sites through all modes of transportation including head load or animal transport or by mechanical means including leveling, fine dressing and carriage of machineries, materials, tools, equipments and safety measures and other incidentals necessary to complete the work by mechanical means and labour if required. Recovery of stones to the tune of 133.61 cubic metre quantity at the rate of Rs. 300/- only (Rupees three hundred only) per cubic metre shall be effected from the contractor running bills on pro-rata basis as per actual quantity executed. Any loss to the public/private property during the course of execution shall be the absolute responsibility of the contractor which shall have to be compensated by him to the extent of damage occurred in all cases. The rate is including Octroi, Royality, Malkhana, toll tax, sale tax, GST or any other taxes imposed by the Government.
Construction of embankment with approved materials deposited at site obtained from roadway cutting and excavation from drains and foundation of all other structures or other sources, graded and compacted to meet requirement, including setting out, true to the lines, grades, width and side slopes in accordance with drawings, including spreading the embankment material with motor–Grader in successive layers of 200mm (two hundred millimeter) uniform thickness, and compacting with vibratory roller 8-10 (eight to ten) Tonne static weight to meet the requirements of table 300.1 & 300.2 of MORD technical specification clause 301 and 1603.5 and as per the entire satisfactions and directions of Engineer-in-Charge, including carriage of material within all leads, lifts and other incidentals. The rate including Octroi, Royality, Malkhana, toll tax, sale tax, GST or any other taxes imposed by the Government.
Earth work in excavation in foundation for all types of structures such as retaining walls, breast walls, culverts, drains, parapets and other similar structures in all kinds and classification of soil, including saturated soil comprising of ordinary mix soil, ordinary rock, hard rock, chiseling/ wedging out rocks (where blasting is prohibited) complete in accordance with the lines and dimensions shown on the drawings, including setting out, construction of shoring, bracing, removal of stumps and other deleterious materials and disposal of excavated material upto any leads and lifts including dressing of sides and bottom and obstructions necessary for placing the foundations, trimming, leveling ramming and watering bottom of excavation and backfilling in trenches with excavated suitable approved materials to the original surface in layers not exceeding 15cm (fifteen centimeter) compacted thickness including shoring and strutting and pumping or bailing out water (surface and sub-soil water) up to any depth and any quantum of water and cleaning of slush which may arise out during dewatering complete as per drawing and MORD Technical Specification clause 305.1 and as per the direction and the entire satisfaction of Engineer-in-Charge including carriage of material within all leads, lifts and other incidentals. The rate is including Royality, Malkhana, Octroi, GST, toll tax, sales tax or any other taxes imposed by the Government.
Providing and laying mechanically mixed and vibrated concrete for plain cement concrete 1:5:10 (One cement isto five sand isto ten graded crushed stone aggregate 40mm(Forty millimeter) nominal size), in or under water in Retaining wall/breast wall and the like etcetera complete including pumping or bailing out water, dewatering (surface/sub soil water)including removal of slush which may arise at time of laying under water for all heights/depths and any quantum of water, including cost of form work and curing complete for 14 (fourteen) days and as per drawing and MORD Technical specification section 800, 900,1200 and 1600 and as per entire satisfaction and directions of Engineer-in-charge, including carriage of materials within all leads, lifts and other incidentals. The rate is including Royality, Malkhana, Octroi, GST, toll tax, sales tax or any other taxes imposed by the Government.
Providing and laying 100mm (one Hundred millimeter) dia ISI marked P.V.C. pipe Weep Holes in brick masonry/stone masonry plain/ reinforcement concrete abutments, wing wall/ return wall, retaining walls and breast walls, extending through the full width of the structure with slope of 1(V): 20H (One vertical isto twenty Horizontal) towards drawing face complete as per drawing and MORD technical specification clause 614,709,1204.3.7 and as per the direction and entire satisfaction of Engineer-in-Charge complete, including carriage of materials with in all leads, lifts and other incidentals. The rates including Royality, Malkhana, Octroi, GST, toll tax, sale tax or any other taxes imposed by the Government.
Back filling behind abutment Retaining wall/Breast wall, Wing walls and the like with approved granular materials complete as per drawings and MORD technical specification clause 1604.7 and section 300 as directed by the Engineer-in-Charge including carriage of materials with in all leads, lifts and other incidentals. The rate is including Royality, Malkhana, Octroi, GST, toll tax, sale tax or any other taxes imposed by the Government.
PARMINDER SINGH RANA
Sourav Sharma
Mehar Singh
MINAKSHI SHARMA
Sunil Kumar
Mohit Sharma
Varinder Singh
Balbir Singh Govt Contractor
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .