Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
14 Aug 2026, 4:00 pmClosed
SE TR Surendranagar
Construction of foundations, Cable Trench, FP wall, Oil sump , chemical water proofing & misc. civil works at various S/S under Dhrangadhra Am Division Under Surendranagar circle (2026-27)
326175
STC-100-2026
Open
Civil Works
Works
Surendranagar
12 documents required · 10 mandatory · 2 optional
₹4,248
GETCO,Surendranagar
₹1.1 L
21 Jul 2026
21 Jul 2026
21 Jul 2026
14 Aug 2026
21 Jul 2026
TRANSMISSION CIRCLE SURENDRANAGAR
Name of work : Construction of foundations, Cable Trench, FP wall, Oil sump , chemical water proofing &
misc. civil works at various S/S under Dhrangadhra Am Division Under Surendranagar circle (2026-27)
DESCRIPTION UNIT RATE AMOUNT
1 Demolition including stacking of serviceable materials and
disposal of un serviceable materials with all lead and lift [1].
R.C.C. work 41.00 CMT 1021.00
2 Dismantling the B.B./Bella /U.C.R. masonry work in C.M. or
L.M. including scaffolding and throwing away the dismantled
stuff with in the lead of 500 Mt. radius & stacking of the 87.00 CMT 531.00
useable material etc., complete as directed by E.I.C.
3 Removing existing plasterwork including scaffolding &
throwing the stuff up to any lead etc. complete as directed
4 Excavation for foundation up to 1.5m depth including
refilling the trenches, sorting out and stacking of useful
materials and disposing of the excavated stuff up to any
lead, dressing, rolling watering & lift. No extra payment shall
be made for disposing of extra excavated earth from s/s
premises or switch yard etc as per directive of EIC -
including De-watering if required for Loose or soft soil/ 867.00 CMT 352.00
Dense or Hard soil/ Hard Murrum/ Soft rock not
requiring Blasting - Executed with manual.
Backfilling Consolidation shall be done by spring
vibratory earth compaction machine of 5 ton capacity.
5 Excavation for foundation up to 1.5m depth including
refilling the trenches, sorting out and stacking of useful
materials and disposing of the excavated stuff up to any
lead, dressing, rolling watering & lift. No extra payment shall
be made for disposing of extra excavated earth from s/s
premises or switch yard etc as per directive of EIC -
including De-watering if required for Hard rock - Executed
Backfilling Consolidation shall be done by spring
vibratory earth compaction machine of 5 ton capacity.
6 Excavation for foundation from 1.5m Mt. to 3.00m depth
including refilling the trenches, sorting out and stacking of
useful materials and disposing of the excavated stuff up to
any lead, dressing, rolling watering & lift. No extra payment
shall be made for disposing of extra excavated earth from
s/s premises or switch yard etc as per directive of EIC - 273.00 CMT 426.00
including De-watering if required for Loose or soft soil/
Dense or Hard soil/ Hard Murrum/ Soft rock not
requiring Blasting - Executed with manual.
Backfilling Consolidation shall be done by spring
vibratory earth compaction machine of 5 ton capacity.
7 Excavation for foundation from 1.5m Mt. to 3.00m depth
including refilling the trenches, sorting out and stacking of
useful materials and disposing of the excavated stuff up to
any lead, dressing, rolling watering & lift. No extra payment
shall be made for disposing of extra excavated earth from
s/s premises or switch yard etc as per directive of EIC -
including De-watering if required for Hard rock - Executed
with manual.Backfilling Consolidation shall be done by
spring vibratory earth compaction machine of 5 ton
8 Earthwork for embankment including breaking clods,
dressing with all lead and lift and including watering rolling
and consolidation of subgrade in layers at O.M.C. to
required dry density including filling the depression which
occur during the process using power roller 8T to 10T. -
Earth brought from out side excluding black cotton soil &
boulders. The item rate includes all leads from the SS
with all lifts& labours. Note: Before laying
Consolidation shall be done by spring vibratory earth
compaction machine of 8T to 10T capacity.
9 Providing Precast concrete block masonry (including
quoin blocks Jamb blocks, closer etc.) with solid concrete
blocks of approved size made of cement concrete 1:3:6 mix
(1cement : 3 course sand : 6 graded stone aggregates of
mm and down gauge) in foundation and plinth in cement
mortar.1:6 (1-Cement : 6-Fine Sand) including racking out
joints up to 12mm depth, scaffolding, curing, filling up the 23.00 CMT 3600.00
gaps between the joints complete as directed by E.I.C.
1. Testing certificate requires to be submitted.
2. Wetting of bricks/Bella/Block requires for 03 to
hours be forelaying.
3. Curing shall commenced from 12 hours of laying and
shall be done till 7 days.
10 Providing Precast concrete block masonry (including
quoin blocks Jamb blocks, closer etc.) with solid concrete
blocks of approved size made of cement concrete 1:3:6 mix
(1cement : 3 course sand : 6 graded stone aggregates of
mm and down gauge) in superstructure above plinth up to
floor two level in cement mortar.1:6 (1-Cement : 6-Fine
Sand) including racking out joints up to 12mm depth, 63.00 CMT 3865.00
scaffolding, curing, filling up the gaps between the joints
complete as directed by E.I.C.1. Testing certificate
requires to be submitted.2. Wetting of
bricks/Bella/Block requires for 03 to 24 hours before
laying.3. Curing shall commenced from 12 hours of
laying and shall be done till 7 days.
11 Providing and laying cement concrete 1:4:8 (1 Cement :
4 Coarse sand : 8 black crushed stone aggregate 40mm
Nominal size) and curing complete- excluding cost of
formwork Foundation and plinth. 83.00 CMT 2605.00
Note:Before laying PCC, Consolidation shall be done by
spring vibratory earth compaction machine of 5 ton
12 Providing form work of ply wood shuttering so as to give a
smooth exposed finish including centering (adjustable
tubular steel supports). Shuttering strutting and propping
etc. for any height of propping and centering below 1055.00 SMT 267.00
supporting floor to ceiling , and removal of the same for
reinforced concrete and plain concrete. for Footings
foundations and pedestal
13 Providing & laying control cement concrete M-20 as per
mix design exposed work with curing etc. complete
excluding the cost of ply wood form work & adjustable
tubular steel supports / Props. and the cost of
reinforcement. -For Footing base of col., foundation &
mass Concrete 431.00 CMT 3892.00
1. Date of casting shall be mentioned and curing with
Jute bag shall be done for 10 days.
2. Ensure concrete or PVC cover blocks are placed on
all sides and bottom.
14 Providing and laying controlled cement concrete M-20
with curing etc. complete including the cost of ply wood
shuttering form work and adjustable tubular steel supports
but excluding the cost of reinforcement for G.F+ FF &
Staircase RCC structures For Vertical wall.
1. Date of casting shall be mentioned and curing with 93.00 CMT 8714.00
Jute bag shall be done for 10 days for slab beam curing
shall be done with water spray 3-4 times a day till
2. Ensure concrete or PVC cover blocks are placed on
all sides and bottom.
15 Providing & laying control cement concrete M-20 as per
mix design exposed work with curing etc. complete
Including the cost of ply wood form work & adjustable
tubular steel supports / Props. but excluding the cost of
reinforcement. G.F+ FF & Staircase. - For Beam.
1. Date of casting shall be mentioned and curing with
Jute bag shall be done for 10 days for slab beam curing
shall be done with water spray 3-4 times a day till
2. Ensure concrete or PVC cover blocks are placed on
all sides and bottom.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
STC-100-2026 Tender Dhrangadhra ARC FDN.pdf
STC-100-2026 tender doc dhrangadhra ARC.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .