| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.2 LAccepted-AOC | L1 | Accepted-AOC accept of bid | |
| 2 | L2₹22.6 L+₹9.4 L (71.3%)Rejected-AOC KOTTEKATTUKARAN H KANAKAMALA | KOTTAYAM | KERALA | 686001 | L2 | Rejected-AOC reject |
Tender Value
₹13.2 L
EMD Value
₹19,900
Closing Date
30 Jun 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
K Sureshkumar
Assistant Executive Engineer, Dredger Sub Division Ernakulam(Irrigation) Civil station, 5th floor, Kakkanad- 682030
Urgent repair works on downstream lock shutter regulating shutters 2 5 6 9 10 11 12 13 of Pathalam RCB
2021_Irrig_425693_1
08/AEE/DSD/EKLM/2021-22
Open Tender
Repair and Maintenance Works
Item Rate
90 days
Eloor Municipality
Please refer Tender Documents
7 documents required · 7 mandatory
₹2,800
Yes
₹19,900
Yes
29 Jul 2021
11 Jun 2021
5 Jul 2021
11 Jun 2021
30 Jun 2021
11 Jun 2021
11 Jun 2021 - 30 Jun 2021
60 days
Amount
Supply and fabrication of materials for the down stream side lock shutter
od46818/2020_2021/MH : Supply of 28 mm steel fiber core 6/36 galvanized wire rope confirming to IS 2266-1989 including all cost materials, labour, conveyance to the site etc complete.
85.101 : Supply of MS plates confirming to IS 2062GrB including cost of conveyance charges
85.110 : Fabrication and supply of Structural steel wheel gate and accessories as per approved specifications, drawings and directions of deptl officer at site including cost of labour, machinery, all leads and lifts, incidental and handling charges etc complete but excluding cost of material already supplied
od46825/2020_2021/MH : Supply of MS bolts with nut and washer including all cost of materials, Labour, conveyance etc complete
od47948/2020_2021/MH : Supply of Plummerblock (2 Nos) including the cost of all materials, Labor, conveyance, incidental charges etc complete.
od47949/2020_2021/MH : Supply of bearing with sleeve including the cost of all materials,labor,conveyance etc complete
od47994/2020_2021/MH : Supply of pinion shaft 100mm dia 770mm LG 40C8 IS1570 including the cost of materials,machining,labor,conveyance etc complete
od48728/2020_2021/MH : Supply of drum gear PCD 1170, M13, number of teeth 90 including the cost of conveyance, labor etc complete
od48729/2020_2021/MH : Supply of pinion PCD 273mm,M13,N0:teeth 21 including the cost of labor,conveyance etc complete
od48732/2020_2021/MH : Supply of Drumshaft shaft 120 mm dia 1360 mm LG 40C8 IS1570 including the cost of materials,machining,labor,conveyance etc complete
Arresting the down stream side lockshutter
od46820/2020_2021/MH : Arresting the lock shutter safely using chain blocks. Works include conveying chain block to the hoisting platform cutting out the chequered plate and fixing chain blocks on main girder of the hoisting platform including cost of labor,machinery,materials,conveyance etc complete.
Dismantling the damaged wire rope and damaged drum assembly after removing the cover of winch assembly of the downstream side lock shutter
od46821/2020_2021/MH : Removing cover of winch unit and stacking it on the hoisting platform including all cost of labour,machinery, tools&plants,etc complete.
od46823/2020_2021/MH : Removing the existing damaged wire rope from the gate and Hoisting unit safely with all labour hirecharge lift and lead,conveyance up to store room etc complete
od46827/2020_2021/MH : Dismantling winch unit and lifting rope drum using chain block and placing it on the hoisting platform for the repair work of the stool support includes the cost of all labour,conveyance, incidental charges etc complete.
od47566/2020_2021/MH : Removing the gear wheel of the rope drum and placing it on the hoisting platform for examining the teeth including the cost of all labor,tools&plants, Incidental charges, etc complete.
od47567/2020_2021/MH : Dismantling the drum shaft using a press for checking bend of the shaft including the cost of all labour,tools&plants, conveyance ( from the hoisting platform to the nearest workshop) etc complete
od47950/2020_2021/MH : Dismantling the damaged Bearing house, pinion shaft, Pinion etc. including cost of materials, labour, conveyance of scrap to the store room etc complete.
Replacing the damaged components of the rope drum assemby of the downstream lock shutter
od46817/2020_2021/MH : Fixing the new fabricated stool support of the rope drum and correcting the position of drum includes the cost of labor,machinery, tools&tackles, conveyance etc complete
od47457/2020_2021/MH : Machining the existing threads on the rope drum including the cost of labor, materials.tools&plants,Conveyance etc complete
od47569/2020_2021/MH : Assembling drum shaft and rope drum using a hydraulic press including the cost of all labor, tools&machinery,incidental charges,conveyance from nearest work shop to hoisting platform of the lock shutter, etc complete
od47622/2020_2021/MH : Fixing gear wheel on the drum shaft including the cost of all labor,conveyance,incidental charges etc complete
od47623/2020_2021/MH : Fixing the shaft with rope drum on the support in correct alignment including the cost of all labor, materials,tools&machines,conveyance,incidental charges etc complete.
od47995/2020_2021/MH : Connecting the shaft to the flange& assembling plummerblock, Bearings, pinion etc including cost of labor, materials, conveyance, incidental charges etc complete
Fixing the wire rope after applying cardium compound, Alignmnet correction and trial run of the lock shutter
od46819/2020_2021/MH : Fixing the wire rope after applying cardium compound includes all cost of labour, materials, tools and tackles, conveyance etc complete.
od46824/2020_2021/MH : Releasing the shutter from the jammed position using I beam support and screw jack including cost of all labour, materials, hire charges, conveyance etc complete.
Temporary platform for the lock shutter
od46822/2020_2021/MH : Providing a temporary platform for lock shutter (assuming 40 times usage as life period) including all cost of materials, assembling, dismantling conveyance etc. complete.
Refixing the cover of winch mechaninsm and refixing chequred plate on hoisting platform of the downstream side lock shutter including all cost of labour,materials, conveyance,incidental charges etc complete.
od46816/2020_2021/MH : Refixing the cover of winch mechaninsm and refixing chequered plate on hoisting platform including all cost of labour,materials, conveyance,incidental charges etc complete.
Overhauling the non rotating stuck pulleys and rollers of downstream lockshutter
od47454/2020_2021/MH : Dismantling the pulley&pin of down stream side lock shutter using a puller including the cost of all labor,materials,hirecharges of tools and plants,conveyance charges etc complete.
od47455/2020_2021/MH : Cleaning each pulley pins& bushes (downstream lock shutter) facing it in the lathe including cost of labour, materials,conveyance etc complete
od47456/2020_2021/MH : Reassembling pulleys, Pin, brackets etc of the downstream lock shutter including the cost of labor, machinery,tools&tackles, conveyance etc complete.
od48909/2020_2021/MH : Correcting misalignment of thedown stream lock shutter and conducting trial run includes all cost of labout,material,conveyance,incidental charges etc complete.
od10118/2021_2022/MH : Greasing the roller assembly of the downstream lock shutter with the help of a pneumatic machine including cost of all material, labour etc complete.
Electrical works of downstream lockshutter
od64/2021_2022/MH : Supply and providing Fuse links 100A Type HN SIZE 00 in the existing SDF of downstream lock including all cost of labor, materials, hire charges, etc complete
od145/2021_2022/MH : Supply and providing 32 A 3 pole power Contactor in the existing enclosure including fixing and giving necessary connections as required (L&T MNX 32 /Equivalent make) including cost of labor,materials,conveyance etc complete.
od148/2021_2022/MH : Supply and providing Thermal Overload Relays MN 2 (Directly Operated) 20 -33A in the existing enclosure including fixing and giving necessary connections asrequired (L&T MN2 / Equivalant make) including cost of materials, labor,conveyance etc complete
Temporary paltform of regulating shutter
od48864/2020_2021/MH : Providing temporary platform for regulating shutter [40 times usage as life period (assumed) for these materials, hence cost for 1 time use] ,cost includes all materials and labour for assembling and dismantling
Overhauling non rotating pulleys of regulating shutters
od48887/2020_2021/MH : Dismantling pulley of the regulating shutter using a puller including the cost of all materials,labor,conveyance,incidental charges etc complete
od48888/2020_2021/MH : Cleaning each pulleypins&bushes of regulating shutters facing pins in a lathe including the cost of all labor,conveyance etc complete
od48889/2020_2021/MH : Reassembling pulley&pins of the regulating shutter including cost of conveyance,labor,hirecharges,incidental charges etc complete
Rewinding of motor of shutter no:2
od48903/2020_2021/MH : Removing the metallic protective cover of the gear box-Motor assembly unit of the Hoist mechanism, Disconnecting electrical connection of 7.5 HP burnt motor, decoupling the burned motor from brake assembly and manual operating system, dismantling from the base plate and taking out from the base and coveying it to the nearest workshop including the cost of all labor materials,incidental charges etc.
od48904/2020_2021/MH : Separate the 7.5HP motor in to stator and rotor, remove the whole burnt stator coil by cutting, pulling and cleaning the slots. Insulating the slots by using nomexpaper, rewinding the complete stator slots by using same gauge new copper super enameled winding wire and taping coils. Providing new lead wires, sockets etc. Varnishing the coil using best quality insulation varnish and baking the coils,reassembling and test run the motor.(Less the cost of scarp copperwire)(Common data for stator winding)
od48905/2020_2021/MH : Refitting the repaired / rewound 7.5HP burnt motor on base plate and coupling the motor with the break assembly and manual operating system, also correcting the alignment, giving electrical connections, test run etc as required. Refixing metallic protective cover of the gear box-Motor assembly unit of the Hoist mechanism.
Electrical works of regulating shutters
od48906/2020_2021/MH : Charges for dismantling the existing damaged auxiliary contact block in the starter control panel of the shutter motor and Supply, installation, testing, and commissioning of L&T or similar Make Front mounting add-on auxiliary contact block MNXA2.
od49900/2020_2021/MH : Replacing damaged push button( 2nos for each shutter ) of shutter 1&6 including the cost of materials, labor, conveyance, etc complete.
od15/2021_2022/MH : Supply and providing 18A, 3 pole power Contactor in the existing enclosure including fixing and giving necessary connections as required (L&T MNX 18 /Equivalant make) for shutter 2 including cost of all materials,labor,conveyance etc complete
od46/2021_2022/MH : Replacement of the mainswitch of shutter 2 including the cost of all materials,labor,conveyance etc complete
od147/2021_2022/MH : Supply and providing Thermal Overload Relays MN 2 (Directly Operated) 9 - 15A in the existing enclosure including fixing and giving necessary connections as required (L&T MN2 / Equivalant make)including cost of materials, labor,conveyance etc complete
od149/2021_2022/MH : Supply and providing Cylindrical fuse links 32A Type HF SIZE 14 X 51 in the existing SDF as required (L&T / Equivalant make) including cost of materials,labor,conveyance etc complete.
Alignment correction & Trailrun (regualating shutters)
od48908/2020_2021/MH : Correcting misalignment of the regulating shutters and conducting trial run includes all cost of labout,material,conveyance,incidental charges etc complete.
Shaju. K.G
Bidder Name
Shaju. K.G
Brothers Engineering Contractors
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_604119.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .