Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.1 LAdmitted-Finance | +14.00% | ₹6.1 L | L1 | Admitted-Finance |
| 2 | L2₹7.1 LAdmitted-Finance | +33.00% | ₹7.1 L | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-NOT QUALIFIED IN COMMERCIAL EVALUATION. DETAILS ATTACHED. |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Updated dates
Tender Value
Refer Docs
EMD Value
₹10 L
Closing Date
7 May 2026, 3:00 pmClosed
CHIEF MANAGER PURCHASE
PATN ABIHAR
STANDING ORDER FOR EXECUTION OF BALANCE MECHANICAL, PIPING AND PAINTING WORKS FOR GRAIN BASED ETHANOL DISTILLARY UNIT AND OTHER AREAS AT HBL SUGAULI, EAST CHAMPARAN, BIHAR
2026_HPCLB_274698_1
HBL/TEN/PUB/26-27/001
Open Tender
Miscellaneous Works
120 days
SUGAULI EAST CHAMPARAN BIHAR
AS PER ATACHED TENDER DOCUMENT
2 documents required · 2 mandatory
₹0
₹10 L
Yes
PATNA THRU VIRTUAL MODE
3 Jun 2026
13 Apr 2026
8 May 2026
13 Apr 2026
7 May 2026
13 Apr 2026
13 Apr 2026 - 6 May 2026
20 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 0.0 | EXECUTION OF BALANCE MECHANICAL AND PIPING WORKS AS PER BELOW DETAILS AND ATTACHED TENDER DOCUMENTS: | - | - | - | - | - |
Supply, Fabrication and Erection of Structural:
The job includes supply, fabrication, welding, erection in position of structural members at all elevation as per drawing.
The rate is inclusive of all Machinery like Chain pulley blocks, Gas cutting, grinding machine, hydra, crane (if any) etc., welding, electrode, scaffolding, all consumables, manpower etc. required to complete the work.
Structural steel members shall be IS 2062 Gr. A/B. SAIL/TATA/RINL(Vizag Steel) product should be used.
The structural steel members should be strictly as per makes/specification specified against each & every item and the supplier has to provide the quality certificate of the original manufacturer along with the materials supplied.
The payment terms are as follows:
(i) For supply of Structural at HBL Site: 60% of SOR
(ii) For Fabrication: 20% of SOR against Fabrication. Only Theoretical weight of steel sections shall be considered for payment.
(iii) For Erection: 20% of SOR against Erection in field (job completion at field/required location). Only Theoretical weight of steel sections shall be considered for payment
The detailed scope of work and technical specifications given for job shall be followed. | - | Metric Ton | - | - | Item 01 | |
Fabrication and Erection of Structural:
This clause is applicable when structural material (IS-2062) is supplied by HBL.
The job includes fabrication, welding, erection in position of structural members (IS2062) at all elevation as per drawing.
The rates are inclusive of all Machinery like Chain pulley blocks, Gas cutting, grinding machine, hydra, crane (if any) etc., welding, electrode, scaffolding, all consumables, manpower etc. required to complete the work.
Only Theoretical weight of steel sections shall be considered for payment.
The payment terms are as follows:
(i) For Fabrication: 50% of SOR
(ii) For Erection: 50% of SOR (job completion at field/required location)
The detailed scope of work and technical specifications given for job shall be followed. | - | Metric Ton | - | - | Item 02 | |
Erection of structural
This clause is applicable when structural material (IS 2062)/ /grating/chequered plate is already fabricated at HBL site. The fabricated structural material shall be supplied by HBL. Fabrication means welding is already completed for piece at site/yard (for structural members) at HBL.
The job includes erection, welding and fixing in position of structural fabricated assembly at all elevation as per drawing.
The rates are inclusive of all Machinery like Chain pulley blocks, Gas cutting, grinding machine, hydra, crane (if any) etc., welding, electrode, scaffolding, all consumables, manpower etc. required to complete the work.
The payment terms are as follows:
For Erection: 100% of SOR (job completion at field/required location)
Only Theoretical weight of steel sections shall be considered for payment
The detailed scope of work and technical specifications given for job shall be followed. | - | Metric Ton | - | - | Item 03 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.46 MB
UNPRICEDBID001.pdf
Tender Documents • 1.77 MB
BOQ_320709.xls
BOQ • 0.44 MB
AttachmentIVStructuralSpecification.pdf
Additional Documents • 0.43 MB
AttachmentIXElectroforgedGratingSpecification.pdf
Additional Documents • 0.41 MB
AttachmentVIIIListofApprovedMake.pdf
Additional Documents • 0.42 MB
AttachmentVIIScaffoldingSpecification.pdf
Additional Documents • 1.39 MB
AttachmentVISpecificationforPaintingTSQ03.pdf
Additional Documents • 14.31 MB
AttachmentVInsulationMaterialsTechnicalSpecification.pdf
Additional Documents • 0.42 MB
AttachmentIIIWeldingSpecificationforPipingSystem.pdf
Additional Documents • 9.19 MB
Download all tender documents and submit your bid