Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC LID EW SECTION AREEKODE | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.3 L+₹34,744.42 (11.7%)Rejected-AOC 673639 | MALAPPURAM | KERALA | 673639 | L2 | Rejected-AOC L2 | |
| 3 | Rejected-Technical KAVANNUR GRAMA PANCHAYATH KERALA | - | Rejected-Technical L3 |
| Sl No | Description | Qty | Unit | Contractor Balakrishnan V P L3 | RASHID KK L2 | MUHAMMEDALI PALAPPETTA PUTHANPALLIYALI L1 |
|---|---|---|---|---|---|---|
| 1.00compoundwall | ||||||
| 1.00 | OD464140/2025-2026:DISMANTLING laterite masonry - Dismantling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in laterite masonry in cement mortar disposal of debris within a distance of 150m. | 1.8 | cum | 1,588.81 ₹2,859.86 | 1,558.59 ₹2,805.46 | 1,395.58 ₹2,512.04 Lowest |
| 1.00 | OD464141/2025-2026:DISMANTLING DR - Dismantling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 27.07 | cum | 695.1 ₹18,819.83 | 681.88 ₹18,461.9 | 610.56 ₹16,530.91 Lowest |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1.92 | cum | 330.08 ₹633.75 | 323.8 ₹621.7 | 289.93 ₹556.67 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.96 | cum | 7,279.22 ₹6,988.05 | 7,140.77 ₹6,855.14 | 6,393.91 ₹6,138.15 Lowest |
| 1.00 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 61.2 | sqm | 770.42 ₹47,149.7 | 755.77 ₹46,253.12 | 676.72 ₹41,415.26 Lowest |
| 1.01 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 21.06 | cum | 7,863.04 ₹1,65,595.62 | 7,713.49 ₹1,62,446.1 | 6,906.72 ₹1,45,455.52 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 637.74 | kilogram | 103.16 ₹65,789.26 | 101.2 ₹64,539.29 | 90.61 ₹57,785.62 Lowest |
| 1.01 | OD464132/2025-2026:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete. | 30 | metre | 112.75 ₹3,382.5 | 110.61 ₹3,318.3 | 99.03 ₹2,970.9 Lowest |
| 1.01 | 50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc. | 2.04 | cum | 8,291.47 ₹16,914.6 | 8,133.77 ₹16,592.89 | 7,283.05 ₹14,857.42 Lowest |
Tender Value
₹3.4 L
EMD Value
₹8,473
Closing Date
15 Jun 2026, 5:00 pmClosed
ASSISTANT ENGINEER
ASSISTANT ENGINEER LSGD SECTION KAVANUR
RE TENDER Annual Plan-2025-26 kavanur GP project no 385/25 26 Moolakudath Anganwadi Side protection
2026_LSGD_854112_5
ET/01/AE/KVR/26-27
Open Tender
Civil Works - Others
Item Rate
AE LSGD SECTION KAVANUR
Please refer Tender documents.
9 documents required · 9 mandatory
₹750
Yes
₹8,473
Yes
24 Sept 2026
5 Jun 2026
17 Jun 2026
5 Jun 2026
15 Jun 2026
5 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1compoundwall | |||||
| 1.001 | OD464140/2025-2026:DISMANTLING laterite masonry - Dismantling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in laterite masonry in cement mortar disposal of debris within a distance of 150m. | - | cum | - | - |
| 1.002 | OD464141/2025-2026:DISMANTLING DR - Dismantling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 1 | cum | - | - |
| 1.003 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | - | cum | - | - |
| 1.004 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.005 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | - | sqm | - | - |
| 1.006 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.007 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | kilogram | - | - |
| 1.008 | OD464132/2025-2026:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete. | - | metre | - | - |
| 1.009 | 50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc. | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1443693.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.04 MB
Tendernotice_2.pdf
PDF • 0.09 MB
385NIT.pdf
Tender Documents • 0.02 MB
385SBD.pdf
Other Document • 1.82 MB
BOQ_1443693.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .