Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹53,000
EMD Value
₹1,060
Closing Date
10 May 2023, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer FMD Baramulla
Executive Engineer FMD Baramulla
Repair and replacement of fast moving mechanical parts like rebuilding of arms adopter seats fitting of cutting teeth of cutter to Budshah II dredger of Ellicott series
2023_IFC_211268_3
eNIT No. 4 of 2023-24
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
7 days
Khawjabagh Baramulla
Please refer Tender documents.
2 documents required · 2 mandatory
₹100
Executive Engineer FMD Baramulla
₹1,060
11 May 2023
4 May 2023
11 May 2023
4 May 2023
10 May 2023
4 May 2023
Amount
Repairs to the crakes developed in the spud of Water Master by way of patching the cracked surface at various points with an MS 8 01 mm metallic strips and duly welding the MS strips with the base Job metal to give perfect strength to the spud. The job includes shifting of the crew by engaging private transport to and fro for shifting the Diesel generator welding set along with other tools and tackles cutting, grinding and finishing of welding joints. The job includes the carriage charges of machine and material up to site at Hokersar, Srinagar. All the consumables and electricity required for the job to be borne by the firm. Dismantling of the ram of the master cylinder assembly and Water master and shifting it 01 repairs to ram of the master cylinder to workshop. The job includes cutting away the broken eye of the Job ram , removing the worn out bush from the ram eye , re - metalling the eye bore and then turning on lathe for the proper dia of new bush . The job also includes fitting of a new bush to be provided by the Department, welding the cye back to ram and then shifting it back to the site. The job further includes shifting back the ram to the site and then fitting and testing of the same for the proper functioning of Excavation Arm of the Water Master. All the consumables and electricity required for the job to be borne by the firm. Repairs to the bucket of water master classic - iii by way of disengaging of bucket from the hoisting assembly by way of Job involving skilled mechanic. The dissembled bucket from the linkage assembly is then to be lifted by way of engaging crane and shifting to workshop for necessary repairs. Job includes welding of the damaged portion of bucket, repair to movement link of bucket and other necessary repairs. After necessary repair work the bucket is, then to be refitted back bucket hoisting assembly of water master classic at site by engagement of crane, skilled mechanic . All tools tackles for execution of job shall be provided by the firm itself.
Asif Engineering Works
stage.html
html • 0.02 MB
finance_564130.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .