Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC BARKOT UTTARKASHI | RUDRA PRAYAG | UTTARAKHAND | 246141 | ₹1.3 Cr | L1 | Accepted-AOC QUALIFIED |
| 2 | L2₹1.6 Cr+₹32.2 L (25.6%)Rejected-Finance | ₹1.6 Cr+₹32.2 L (25.6%) | L2 | Rejected-Finance NOT QUALFIED |
| 3 | L3₹1.3 Cr+₹4.0 L (3.16%)Rejected-Finance 2 FRIENDS ENCLAVE SHAH NAGAR DEHRADUN | ₹1.3 Cr+₹4.0 L (3.16%) | L3 | Rejected-Finance NOT QUALFIED |
| Sl No | Description | Qty | Unit | Aarna Electrical And Co L1 | UTTARANCHAL FORGINGS INDUSTRY L3 | T S Power Co L2 |
|---|---|---|---|---|---|---|
| 1.00SUPPLY OF MATERIAL PORTION | ||||||
| 2.00 | MS Clamp bottom side for STP SP-23/SP-55 | 338 | NOS | 1,52,100 ₹1,52,100 Lowest | 1,55,480 ₹1,55,480 | 1,53,790 ₹1,53,790 |
| 3.00 | LT XLPE Cable 1x95 sq.mm. -D | 12,844 | M | 12,20,180 ₹12,20,180 Lowest | 13,48,620 ₹13,48,620 | 12,84,400 ₹12,84,400 |
| 4.00 | MCCB 250A for 100 KVA T/F- Earth fault Relay | 63 | NOS | 34,02,000 ₹34,02,000 Lowest | 34,33,500 ₹34,33,500 | 34,14,600 ₹34,14,600 |
| 5.00 | MCCB 125A for 63 KVA T/F- Earth fault Relay | 106 | NOS | 49,82,000 ₹49,82,000 Lowest | 50,35,000 ₹50,35,000 | 49,92,600 ₹49,92,600 |
| 6.00LABOUR PORTION | ||||||
| 7.00 | Cartage & Head Load Cartage of MCCB etc. | 169 | JOB | 6,76,000 ₹6,76,000 Lowest | 7,60,500 ₹7,60,500 | 7,09,800 ₹7,09,800 |
| 8.00 | Installation of MCCB with Box at DTRS | 169 | NOS | 16,90,000 ₹16,90,000 Lowest | 17,74,500 ₹17,74,500 | 17,74,500 ₹17,74,500 |
| 9.00 | Earthing of MCCB | 169 | NOS | 1,01,400 ₹1,01,400 Lowest | 1,05,625 ₹1,05,625 | 1,03,090 ₹1,03,090 |
| 10.00 | Laying & Saging of LT XLPE Cable 95 sqmm | 12,844 | M | 3,14,678 ₹3,14,678 Lowest | 3,21,100 ₹3,21,100 | 3,21,100 ₹3,21,100 |
Tender Value
Refer Docs
EMD Value
₹2.5 L
Closing Date
8 Jan 2026, 12:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER, EDC KARANPRAYAG
Installation of MCCB on 63 and 100 KVA T/F in Chamoli, Gopeshwar, Nandprayag and Pandukeshwar Section in EDSD Chamoli/Joshimath against Capital (SI) Head under EDD Gopeshwar on Semi-Turnkey basis
2025_UPCL4_90198_1
34/EDC(K)/2025-26
Open Tender
Repair and Maintenance Works
Item Rate
180 days
Gopeshwar
As Per NIT
3 documents required · 3 mandatory
₹11,800
EE EDD GOPESHWAR
₹2.5 L
6 Jun 2026
24 Dec 2025
9 Jan 2026
25 Dec 2025
8 Jan 2026
25 Dec 2025
SUPPLY OF MATERIAL PORTION
MS Clamp bottom side for STP SP-23/SP-55
LT XLPE Cable 1x95 sq.mm. -D
MCCB 250A for 100 KVA T/F- Earth fault Relay
MCCB 125A for 63 KVA T/F- Earth fault Relay
LABOUR PORTION
Cartage & Head Load Cartage of MCCB etc.
Installation of MCCB with Box at DTRS
Earthing of MCCB
Laying & Saging of LT XLPE Cable 95 sqmm
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_106866.xls
BOQ • 0.28 MB
Tendedocument34.pdf
Tender Documents • 1.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .