Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹12.9 L+₹77,777.20 (6.43%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹13.7 L+₹1.6 L (12.9%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹13.7 L+₹1.6 L (13.4%)Rejected-AOC | L4 | Rejected-AOC L4 |
Tender Value
₹15.3 L
EMD Value
₹38,132
Closing Date
5 Oct 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER Irrigation Division Tvpm
GENERAL NIP Reconstruction of Cut and cover near Ch om of Muriyankara Sub channel General Civil Work
2024_Irrig_693762_1
IRR/IA/TR/2902/2024_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
120 days
Thiruvananathapuram
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
₹38,132
26 Nov 2024
1 Oct 2024
7 Oct 2024
1 Oct 2024
5 Oct 2024
1 Oct 2024
Amount
cut & cover
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
J S Subhash Chandra Babu (BID ID -1935685)
D C DETHY (BID ID -1935509)
R Thankamony (BID ID -1936384)
Bidder Name
J S Subhash Chandra Babu
D C DETHY
RAJAMONY T
R Thankamony
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1080572.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .