Loading…
Loading…
Tender Value
₹2.3 Cr
EMD Value
₹13.4 L
Closing Date
30 Jun 2026, 12:00 pmClosed
Dy. Director (const) Mandi parishad Basti
Dy. Director (const) Mandi parishad Basti
Construction of Internal And External C C Road Toilet And Aproch and External Drain work
2026_RKUMP_1159930_1
82
Open Tender
Civil Works
Percentage
180 days
Construction of Internal And External C C Road Toi
Please refer Tender documents.
2 documents required · 2 mandatory
₹29,500
Dy. Director (const) Mandi parishad Basti
₹13.4 L
Yes
15 Jun 2026
15 Jun 2026
30 Jun 2026
15 Jun 2026
30 Jun 2026
15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying 7.50 cm compacted thickness of stone aggregate of specific sizes 22.4-53 mm of water bound macadam specification incluiding spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 Kn in stage to proper grade and camber applying and brooming stone dust to fill-up the interstices of coarse brooming stone dust to fill-up the interstices of coarse aggregate watering and compacting to the required dencity grading-3 as per technical Speicification clause 405 including cost of material, roller, cartage, loading, unloading, labour and all taxes complete or as per direction of Engineer in charge. | 595.5 | Cum | 5,353.9 | ₹31,88,247.45 |
| 2 | C.C. (1:1.5:3) with cement C. Sand stone grit in road slab including of cost all material labour T&P etc. complete required for proper comp. of work S.I. No. 279 | 1,826.2 | Cum | 8,250 | ₹1,50,66,150 |
| 3 | Extra providing and mixing hardening compound of approved quality as per manufacturers specification in cement concrete.(2018) | 3,176 | Ltr | 48.15 | ₹1,52,924.4 |
| 4 | Mild steel or iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary including bending for proper completion of the work and excluding the supply of steel and its wastage Bend, hooks and authorized over lapping shall be measured upto floor to level. SI NO 504 | 358.39 | Qtl | 7,150 | ₹25,62,488.5 |
| 5 | Excavation in foundation in ordinary soil (lomclay or sand) including lift up to 1.5M and lead up to 30Mand including filling wetering and ramming of excavated eart into the treanches or into the space between the bulding and the sides of the foundation trenches or into the plinth and remivel and disposal of earth as directed by E/I upto a distance of 30M from the foundation trenches. | 324 | Cum | 120 | ₹38,880 |
| 6 | Providind and laying cement concrete in 1:6:12 (1 cement:5 coares sand:10 graded stone aggregate 40 mm nominal size) and curing complete Includingcost of form work in foundation and floors | 40.5 | Cum | 3,750 | ₹1,51,875 |
| 7 | RCC Work Providing and laying in position specified grade of in RCC Raft foundation including the cost of centering shutting finishing and excluding reinforcement-All work up to plinth level 1:2:4(1 cement:2coarse sand:4 graded stone aggregate 40 mm nominal size | 81 | Cum | 7,200 | ₹5,83,200 |
| 8 | Mild steel or iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary including bending for proper completion of the work and excluding the supply of steel and its wastage bend hooks and authorized over lapping shall be measured upto floor to level. | 79.56 | Qtl | 7,150 | ₹5,68,854 |
| 9 | (Item No. 01 To 07) The routine maintenance of above road Above C C Road work , etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 1.00% | 1 | Job | 2,09,690 | ₹2,09,690 |
| 10 | (Item No. 01 To 07) The routine maintenance of above road Above C C road work Including earthen shoulder, Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 1.50% | 1 | Job | 3,14,535 | ₹3,14,535 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 19.41 MB
BOQ_2174182.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .