Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC SANTHOSH BHAVAN PADAMUGAL KOCHI PIN 682030 | KOCHI | ERNAKULAM | KERALA | 682030 | ₹2.0 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹2.1 LRejected-Finance | ₹2.1 L | L2 | Rejected-Finance L2 bidder |
| 3 | L3₹2.1 LRejected-Finance NULL | ₹2.1 L | L3 | Rejected-Finance L3 bidder |
| Sl No | Description | Qty | Unit | RITECH SURVEYING AND ENGINEERING LLP L2 | G S Infrastructure L3 | AA AND S CONSTRUCTIONS L1 |
|---|---|---|---|---|---|---|
| 1.00Site clearance and Total station Survey(MoRTH) | ||||||
| 1.01 | 56.13 : Providing access to the site clearing site and making good for surveying in order to provide clear line of site devoid of any hindrance due to vegetation etc. and clearing areas for station points (This item is applicable only for sites without access such as in case of new road formation, bridge and building sites at in accessible locations) | 1.8 | Hecter | 200 ₹360 | 4,147 ₹7,464.60 | 1,000 ₹1,800 |
| 1.02 | 56.12.b : Total station surveying and preparation of site plan for plain built up area with hindrance to line of sight due to buildings/structures. | 6 | Hecter | 12,000 ₹72,000 | 11,131 ₹66,786 | 7,000 ₹42,000 |
| 2.00Soil Investigation(MoRTH) | ||||||
| 2.01 | 56.1.a : Mobilization including transportation of all necessary plan and equipment's and materials of boring field testing and sampling and demobilization after completing the workFor machine boring | 1 | set | 18,000 ₹18,000 | 15,798 ₹15,798 | 60,000 ₹60,000 |
| 2.02 | 56.2.a : Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location.For machine boring. | 3 | Nos hole | 2,000 ₹6,000 | 3,000 ₹9,000 | 10,000 ₹30,000 |
| 2.03 | 56.3.a.1 : Boring with rotary power drilling equipment's in
all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For ordinary soil. | 30 | metre | 600 ₹18,000 | 923 ₹27,690 | 600 ₹18,000 |
| 2.04 | 56.3.b.1 : Boring with rotary power drilling equipment in
all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 10m upto a depth of 20m including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For ordinary soil | 15 | metre | 700 ₹10,500 | 1,025 ₹15,375 | 50 ₹750 |
| 2.05 | 56.4 : Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under and banks of river. | 6 | metre | 4,500 ₹27,000 | 4,941 ₹29,646 | 3,000 ₹18,000 |
| 2.06 | 56.5.a : Boring through all classes of rock excluding hard rocks having ' N' value greater than 50 using tungsten carbide drilling bit.In land. | 6 | metre | 2,500 ₹15,000 | 2,401 ₹14,406 | 50 ₹300 |
Tender Value
₹2.1 L
EMD Value
₹5,350
Closing Date
30 Nov 2023, 3:00 pmClosed
The Chief Engineer, Sports Kerala Foundation
Jimmy George Indoor Stadium, Vellayambalam, Thiruvananthapuram
Construction of Stadium at Krishna Menon Memorial Government Womens College, Azhikode, Kannur-Total Station Survey and Soil Investigation works
2023_SKF_623762_1
108/SKF/CE/2023-24
Open Tender
Civil Works - Others
30 days
KANNUR
Please refer Tender documents.
6 documents required · 6 mandatory
₹590
Yes
₹5,350
Yes
11 Jun 2026
21 Nov 2023
2 Dec 2023
21 Nov 2023
30 Nov 2023
21 Nov 2023
Amount
Site clearance and Total station Survey(MoRTH)
56.13 : Providing access to the site clearing site and making good for surveying in order to provide clear line of site devoid of any hindrance due to vegetation etc. and clearing areas for station points (This item is applicable only for sites without access such as in case of new road formation, bridge and building sites at in accessible locations)
56.12.b : Total station surveying and preparation of site plan for plain built up area with hindrance to line of sight due to buildings/structures.
Soil Investigation(MoRTH)
56.1.a : Mobilization including transportation of all necessary plan and equipment's and materials of boring field testing and sampling and demobilization after completing the workFor machine boring
56.2.a : Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location.For machine boring.
56.3.a.1 : Boring with rotary power drilling equipment's in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For ordinary soil.
56.3.b.1 : Boring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 10m upto a depth of 20m including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For ordinary soil
56.4 : Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under and banks of river.
56.5.a : Boring through all classes of rock excluding hard rocks having ' N' value greater than 50 using tungsten carbide drilling bit.In land.
56.6 : Recovering undisturbed soil samples using thin tube sampler of 75mm.to 100mm length internal dia 500mm length conforming to relevant IS Code at any required depth including clearing the bore hole etc complete.
56.7 : Conducting standard penetration test in bore hole at any depth.
56.8 : Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.
56.11.a : Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate)Machine boring for 5 bore holes.
RITECH SURVEYING AND ENGINEERING LLP
G S Infrastructure
Bidder Name
G S Infrastructure
AA AND S CONSTRUCTIONS
RITECH SURVEYING AND ENGINEERING LLP
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_939554.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid