| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹2.4 L+₹957.60 (0.40%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹2.9 L+₹50,157.58 (20.9%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹2.9 L+₹51,119.53 (21.3%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | REJI T L4 | SEENA P S L3 | Sreeju S S L2 | Sachin S Babu L1 |
|---|---|---|---|---|---|---|---|
| 1.00Maintenance | |||||||
| 1.00 | 2.7.D:Dismantling Stone Masonry as per Technical Specification Clause 202.<br> Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.<br> (D) Dry Rubble Masonry | 17.1 | cum | 391.23 ₹6,690.03 | 423 ₹7,233.3 | 351.16 ₹6,004.84 | 342 ₹5,848.2 Lowest |
| 1.00 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m <br> Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 21.1 | cum | 893.12 ₹18,844.83 | 388 ₹8,186.8 | 322.69 ₹6,808.76 | 314 ₹6,625.4 Lowest |
| 1.00 | OD54186/2026-2027:DRY RUBBLE MASONRY (without concrete levelling course) with good quality blasted rubble (without bond stone), and packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications. | 46.99 | cum | 3,589.12 ₹1,68,670.69 | 4,685 ₹2,20,171.58 | 2,918.78 ₹1,37,168.07 Lowest | 3,900 ₹1,83,280.5 |
| 1.00 | OD54212/2026-2027:DRY RUBBLE MASONRY (without concrete levelling course) WITH DEPARTMENTAL RUBBLE (without bond stone), and packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per directions of Departmental officers at site | 13.68 | cum | 5,600.12 ₹76,609.64 | 2,600 ₹35,568 | 5,501.85 ₹75,265.31 | 2,100 ₹28,728 Lowest |
| 1.00 | 75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 2.32 | cum | 8,963.12 ₹20,794.44 | 8,400 ₹19,488 | 6,983.07 ₹16,200.72 | 6,900 ₹16,008 Lowest |
Tender Value
₹3.4 L
EMD Value
₹8,442
Closing Date
6 Jul 2026, 4:00 pmClosed
The Assistant Engineer, LID EW Section , Nanniyode
The Assistant Engineer, LID EW Section , Nanniyode
Annual Plan-Nanniyode GP 2026-27, Project No 43/27-Improvements of Madathunada Elankam Mannarakunnu Road in ward 8-General Civil Work
2026_LSGD_857858_5
01/AE/LIDEW/NYD/26-27
Open Tender
Civil Works - Roads
Item Rate
180 days
Nanniyode
Please refer Tender documents.
9 documents required · 9 mandatory
₹745
Yes
₹8,442
Yes
8 Jul 2026
29 Jun 2026
8 Jul 2026
29 Jun 2026
6 Jul 2026
29 Jun 2026
29 Jun 2026 - 6 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Maintenance | |||||
| 1.001 | 2.7.D:Dismantling Stone Masonry as per Technical Specification Clause 202.<br> Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.<br> (D) Dry Rubble Masonry | - | cum | - | - |
| 1.002 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m <br> Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | - | cum | - | - |
| 1.003 | OD54186/2026-2027:DRY RUBBLE MASONRY (without concrete levelling course) with good quality blasted rubble (without bond stone), and packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications. | 1 | cum | - | - |
| 1.004 | OD54212/2026-2027:DRY RUBBLE MASONRY (without concrete levelling course) WITH DEPARTMENTAL RUBBLE (without bond stone), and packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per directions of Departmental officers at site | 1 | cum | - | - |
| 1.005 | 75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 1 | cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_1450160.xls
BOQ • 0.30 MB
Affdvt.pdf
Tender Documents • 0.23 MB
fot.pdf
Tender Documents • 0.23 MB
ipact.pdf
Tender Documents • 0.23 MB
PA.pdf
Tender Documents • 0.25 MB
rmtnc.pdf
Tender Documents • 0.20 MB
viewnit.pdf
Tender Documents • 0.03 MB
viewsbd.pdf
Tender Documents • 2.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .