| 1 | L1₹5.4 LAccepted-AOC | ₹5.4 L | L1 | Accepted-AOC Lowest Offer |
| 2 | L2₹5.7 LRejected-Finance | ₹5.7 L | L2 | Rejected-Finance Not Lowest |
| 3 | L3₹6.3 LRejected-Finance 4 14 A LEMBALAKUDDI PUDUKKOTTAI DISTRICT | PUDUKKOTTAI | PUDUKKOTTAI | TAMIL NADU | ₹6.3 L | L3 | Rejected-Finance Not Lowest |
| 4 | L4₹6.4 LRejected-Finance | ₹6.4 L | L4 | Rejected-Finance Not Lowest |
| Sl No | Description | Qty | Unit | kanagaraj L1 | R.GANESAN L3 | S BALASUBRAMANI CONTRACTOR L2 | TR CONSTRUCTIONS L4 |
|---|---|---|---|---|---|---|---|
| 1.00BOQ | |||||||
| 1.01 | EARTH WORK EXCAVATION IN ALL SOILS AND SUB SOILS EXCLUDING ROCK INCLUDING BACKFILLING IN SIDES OF FOUNDATIONS AND BASEMENT, WATERING, CONSOLIDATION, INCLUDING DEWATERING WHEREVER NECESSARY, ETC., AND DISPOSING OFF THE SURPLUS EARTH WITHIN A LEAD OF 40 MTRS AS DIRECTED IN DEPTH FROM GROUND LEVEL TO -2 MTR. | 12 | CUM | 225 ₹2,700 Lowest | 306 ₹3,672 | 240 ₹2,880 | 310 ₹3,720 |
| 1.02 | TRANSPORT EXCAVATED EARTH / OTHER DEBRIS FROM INSIDE THE PLANT PREMISES AND FILL IN LOW LYING AREAS, INCLUDING SPREADING, LOADING, UNLOADING (25% VOIDS TO BE DEDUCTED IN LORRY/TRACTOR MEASUREMENTS) | 12 | CUM | 225 ₹2,700 Lowest | 306 ₹3,672 | 240 ₹2,880 | 310 ₹3,720 |
| 1.03 | CEMENT CONCRETE 1:4:8 USING 25MM DOWN GAUGE BLUE GRANITE AGGREGATE IN FOUNDATIONS, MUD MAT, FLOORING EXCLUDING SHUTTERING BUT INCLUDING RAMMING, LEVELLING, CURING ETC., COMPLETE. | 3 | CUM | 4,000 ₹12,000 Lowest | 4,500 ₹13,500 | 4,000 ₹12,000 Lowest | 4,550 ₹13,650 |
| 1.04 | CEMENT CONCRETE 1:1.5:3 USING 20MM SIZE BLUE GRANITE AGGREGATE FOR ALL CEMENT CONCRETE ITEMS SUCH AS FLOORING, FOUNDATIONS AND PATCH WORK USING MIXTURE MACHINE INCLUDING CURING BUT EXCLUDING SHUTTERING AND REINFORCEMENT, COMPLETE AT ALL LEVELS. | 15 | CUM | 4,700 ₹70,500 Lowest | 5,500 ₹82,500 | 5,000 ₹75,000 | 5,550 ₹83,250 |
| 1.05 | TAKE DELIVERY OF HIGH STRENGTH RIBBED DEFORMED BARS/ MS BARS ISSUED BY TNPL FREE OF COST, CUT, BEND AND TIE UP IN POSITION INCLUDING COST OF SUPPLYING NECESSARY 18 GAUGE BINDING WIRE FOR ALL TYPES OF RCC WORKS AT ALL LEVELS. | 0.5 | MT | 16,000 ₹8,000 Lowest | 18,000 ₹9,000 | 16,500 ₹8,250 | 18,500 ₹9,250 |
| 1.06 | FORM WORK - WROUGHT AND PUT UP WITH GOOD QUALITY MARINE GRADE PLYWOOD / STEEL SHUTTERING INCLUDING STAGGING FOR ALL TYPE OF WORKS AND REMOVING AFTER CONCRETING AND "PLASTER FREE FINISH" AT ALL LEVELS. | 25 | SQM | 850 ₹21,250 Lowest | 990 ₹24,750 | 900 ₹22,500 | 1,000 ₹25,000 |
| 1.07 | SUPPLY AND LAYING OF FLY ASH BRICKS IN SUPER STRUCTURE IN CM 1:6 INCLUDING SCAFFOLDING, CURING ETC., COMPLETE ABOVE +0.00 MTR TO +7.00 MTR | 5 | CUM | 6,400 ₹32,000 Lowest | 7,200 ₹36,000 | 6,500 ₹32,500 | 7,250 ₹36,250 |
| 1.08 | SUPPLY AND LAYING OF FLY ASH BRICKS IN SUPER STRUCTURE IN CM 1:6 INCLUDING SCAFFOLDING, CURING ETC., COMPLETE ABOVE +7.00 MTR TO +14.00 MTR | 2 | CUM | 7,000 ₹14,000 Lowest | 7,500 ₹15,000 | 7,200 ₹14,400 | 7,550 ₹15,100 |
| 1.09 | SUPPLY AND LAYING OF FLY ASH BRICKS IN HALF BRICK THICK WALL IN CM 1:4, EXCLUDING PLASTERING, INCLUDING SCAFFOLDING, CURING ETC., COMPLETE AT ALL LEVELS. | 10 | SQM | 1,100 ₹11,000 Lowest | 1,550 ₹15,500 | 1,150 ₹11,500 | 1,600 ₹16,000 |
Tender Value
Refer Docs
Closing Date
23 Mar 2026, 3:00 pmClosed
Chief General Manager (Projects and Energy)
PMD Office, TNPL Unit I, Kagithapuram.
Civil works for fourth coming annual shutdown in Pulp Mill and SRP area at TNPL Unit I
2026_TNPL_675190_1
TNPL/PMD/CIV/UNIT I/252613007924
Open Tender
Civil Works
Tender cum Auction
30 days
TNPL Unit I, Kagithapuram, Karur district
As per Invitation for Bids of Bid Document
4 documents required · 4 mandatory
₹0
Exempted
31 Mar 2026
19 Mar 2026
23 Mar 2026
19 Mar 2026
23 Mar 2026
19 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | BOQ | - | - | - | - |
| 1.01 | EARTH WORK EXCAVATION IN ALL SOILS AND SUB SOILS EXCLUDING ROCK INCLUDING BACKFILLING IN SIDES OF FOUNDATIONS AND BASEMENT, WATERING, CONSOLIDATION, INCLUDING DEWATERING WHEREVER NECESSARY, ETC., AND DISPOSING OFF THE SURPLUS EARTH WITHIN A LEAD OF 40 MTRS AS DIRECTED IN DEPTH FROM GROUND LEVEL TO -2 MTR. | - | CUM | - | - |
| 1.02 | TRANSPORT EXCAVATED EARTH / OTHER DEBRIS FROM INSIDE THE PLANT PREMISES AND FILL IN LOW LYING AREAS, INCLUDING SPREADING, LOADING, UNLOADING (25% VOIDS TO BE DEDUCTED IN LORRY/TRACTOR MEASUREMENTS) | - | CUM | - | - |
| 1.03 | CEMENT CONCRETE 1:4:8 USING 25MM DOWN GAUGE BLUE GRANITE AGGREGATE IN FOUNDATIONS, MUD MAT, FLOORING EXCLUDING SHUTTERING BUT INCLUDING RAMMING, LEVELLING, CURING ETC., COMPLETE. | - | CUM | - | - |
| 1.04 | CEMENT CONCRETE 1:1.5:3 USING 20MM SIZE BLUE GRANITE AGGREGATE FOR ALL CEMENT CONCRETE ITEMS SUCH AS FLOORING, FOUNDATIONS AND PATCH WORK USING MIXTURE MACHINE INCLUDING CURING BUT EXCLUDING SHUTTERING AND REINFORCEMENT, COMPLETE AT ALL LEVELS. | - | CUM | - | - |
| 1.05 | TAKE DELIVERY OF HIGH STRENGTH RIBBED DEFORMED BARS/ MS BARS ISSUED BY TNPL FREE OF COST, CUT, BEND AND TIE UP IN POSITION INCLUDING COST OF SUPPLYING NECESSARY 18 GAUGE BINDING WIRE FOR ALL TYPES OF RCC WORKS AT ALL LEVELS. | - | MT | - | - |
| 1.06 | FORM WORK - WROUGHT AND PUT UP WITH GOOD QUALITY MARINE GRADE PLYWOOD / STEEL SHUTTERING INCLUDING STAGGING FOR ALL TYPE OF WORKS AND REMOVING AFTER CONCRETING AND "PLASTER FREE FINISH" AT ALL LEVELS. | - | SQM | - | - |
| 1.07 | SUPPLY AND LAYING OF FLY ASH BRICKS IN SUPER STRUCTURE IN CM 1:6 INCLUDING SCAFFOLDING, CURING ETC., COMPLETE ABOVE +0.00 MTR TO +7.00 MTR | - | CUM | - | - |
| 1.08 | SUPPLY AND LAYING OF FLY ASH BRICKS IN SUPER STRUCTURE IN CM 1:6 INCLUDING SCAFFOLDING, CURING ETC., COMPLETE ABOVE +7.00 MTR TO +14.00 MTR | - | CUM | - | - |
| 1.09 | SUPPLY AND LAYING OF FLY ASH BRICKS IN HALF BRICK THICK WALL IN CM 1:4, EXCLUDING PLASTERING, INCLUDING SCAFFOLDING, CURING ETC., COMPLETE AT ALL LEVELS. | - | SQM | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BidDocument_252613007924.pdf
Tender Documents • 2.45 MB
BOQ_811508.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].