Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-Finance 2 2 SUKANTA SARANI 4TH LANE PO NONA CHANDANPUKUR BARRACKPORE KOLKATA PIN 700122 | BARRACKPORE | 24 PARAGANAS NORTH | WEST BENGAL | 700122 | ₹4.4 L | L1 | Accepted-Finance L1 |
| 2 | L2₹4.6 L+₹19,320.65 (4.38%)Rejected-Finance | ₹4.6 L+₹19,320.65 (4.38%) | L2 | Rejected-Finance Not L1 |
| 3 | L3₹4.6 L+₹22,160.55 (5.02%)Rejected-Finance | ₹4.6 L+₹22,160.55 (5.02%) | L3 | Rejected-Finance Not L1 |
| 4 | L4₹4.6 L+₹23,557.22 (5.34%)Rejected-Finance 00 MAA KALI ENTERPRISE NEW ROAD KULTI BARDHAMAN WEST BENGAL 713343 | PASCHIM BARDHAMAN | WEST BENGAL | 713343 | ₹4.6 L+₹23,557.22 (5.34%) | L4 | Rejected-Finance Not L1 |
Tender Value
₹4.7 L
EMD Value
₹9,311
Closing Date
15 Aug 2026, 4:00 pmClosed
Executive Engineer
Araksha Bhawan 3rd Floor Block DJ Sector II Salt Lake City
Day-to-day Electrical Maintenance of all types of Internal and External Electrical Installations along with routine Pump Operation and Maintenance including Maintenance Works of 11kV Sub-Station at Kasba SAP 4th BN for FY 2026-2027. (1st Call)
2026_WBPHI_5018013_1
WBPHIDCL/EE-(HQ-I)/NIT- 6(e)/2026-2027
Open Tender
ELECTRICAL WORKS M/R
Percentage
Refer to NIT
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹9,311
Yes
21 Sept 2026
6 Aug 2026
17 Aug 2026
6 Aug 2026
15 Aug 2026
8 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Electrical (maintenance works) and operation of pump- motor sets.
Note:All the item of SOR of PWD Electrical works w.e.f 01.11.2017 including up to date addenda , corrigenda and the approved non schedule item of works (including 18% GST & 1% labour cess)
( The work shall continue of the entire contract period as per the requirement & as directed by the Engineer in charge .The payment of the executed work shall be made on the basis of - (A) PWD schedule of rates (B) As per the ANNEXURE - 2023/2 for non-schedule items (C) List of rates proposed by PWD (Sub Committee) on 27/02/2026 for different electrical works.) | - | LOT | 1,20,000 | - |
| 2 | Day-to-day Operation of Pump Motor Sets & Day-to-day Electrical Maintenance & Emergent Repair:
Supply of manpower for operation of pump motor sets and controlling valves in water supply line to provide uniterrupted water supply with minor electromechanical works, and Repair , Maintenance of electrical installation as and when required for a period of 274 days (as per direction of EIC.A) Kasba SAP 4th Battalion Campus including 11 KV Sub-Station.
Electrician Cum Pump Operators ( Skilled) :-
A) Kasba SAP 4th Battalion Campus
Shift Duration :-
(i) 06:00 AM to 02:00 PM
=> 1 no. Electrician-Cum-Pump Operators (Skilled) for Day Shift
Therefore, Operation Shift = (1x274x1 ) = 274 ** { Shift x Days x Man Power}
(ii) 02:00 PM to 10:00 PM
=> 1 no. Electrician-Cum-Pump Operator (Skilled) for Evening Shift
Therefore, Operation Shift = (1x274x1 ) = 274 ** { Shift x Days x Man Power}
Total = (274 + 274) = 548 Shifts are to be provided by the agency ( Minimum tools and tackles should be provided by the agency.}
( RATES ARE INCLUDING 10 % AGENCY PROFIT ,18% GST & 1% LABOUR CESS)
Basic rate is taken from Office of the Labour Commissioner,WB Dated 16/07/2024. | - | PerShiftPerElectricianCumPumpOperator | 630.58 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
Tendernotice_2.pdf
PDF • 0.41 MB
Tendernotice_3.pdf
PDF • 0.91 MB
BOQ_5088623.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .