Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.5 LAccepted-AOC | ₹47.5 L | L1 | Accepted-AOC technically qualified and quoted lowest amount |
| 2 | L2₹49.7 LRejected-Finance GANGABAKSPURWA NEAR BILGRAM CHUNGI DISTRICT HARDOI | HARDOI | HARDOI | UTTAR PRADESH | ₹49.7 L | L2 | Rejected-Finance QUOTED HIGHER RATE THAN L1 |
| 3 | L3₹49.9 LRejected-Finance NIVASI BALASINGHKHEDA POST KARORA DISTRICT LUCKNOW LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | ₹49.9 L | L3 | Rejected-Finance QUOTED HIGHER RATE THAN L1 |
| 4 | L4₹50.2 LRejected-Finance | ₹50.2 L | L4 | Rejected-Finance QUOTED HIGHER RATE THAN L1 |
| 5 | L5₹50.9 LRejected-Finance | ₹50.9 L | L5 | Rejected-Finance QUOTED HIGHER RATE THAN L1 |
| Sl No | Description | Qty | Unit | Raj Boux Yadav L1 | M/S Sushila Enterprises L10 | M/S J.P. INTERPRISES L3 | NIRBHAY KUMAR MISHRA L9 | M/S SURENDRA TRADERS L6 | Jagat Construction L7 | PRAVEEN KUMAR BAJPAI L2 | ATUL CONSTRUCTION L5 | M/S TYAGI CONTRACTOR L4 | M/S RAGHVENDRA PRATAP SINGH L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Cleaning thick jungle and throney bushess without uprooting. | 27,367.2 | SqM | 2 ₹54,734.40 | 5.2 ₹1.4 L | 3.3 ₹90,311.76 | 4.95 ₹1.4 L | 3.35 ₹91,680.12 | 4.83 ₹1.3 L | 4.52 ₹1.2 L | 4.64 ₹1.3 L | 4.57 ₹1.3 L | 4.88 ₹1.3 L |
| 2.00 | Earth workin leveling ofland including leadupto 30M and lift upto 1.5M, manual compaction,labour, T&P etc. complete asper direction of Engineer-in-charge. | 7,470 | CuM | 35 ₹2.6 L | 86.06 ₹6.4 L | 67.9 ₹5.1 L | 82.25 ₹6.1 L | 54 ₹4.0 L | 80.37 ₹6.0 L | 75.19 ₹5.6 L | 77.09 ₹5.8 L | 75.93 ₹5.7 L | 80.85 ₹6.0 L |
| 3.00 | Supply and fixing Precost boundry wall with Poll 150x150 mm, 7No., 3mm high tension PC wire with panel 50mm, 3mm high tension PC wire including earth work and fixing in position (450x450x600mm) in 1:1.5:3 with stonegrit (all works done as per direction of Engineer-in-charge. including cost of all material,labour,T&P etc. | 1,426 | RM | 2,980 ₹42.5 L | 3,208.65 ₹45.8 L | 2,850 ₹40.6 L | 3,066.53 ₹43.7 L | 3,100 ₹44.2 L | 2,996.45 ₹42.7 L | 2,802.49 ₹40.0 L | 2,873.94 ₹41.0 L | 2,830.04 ₹40.4 L | 3,030 ₹43.2 L |
| 4.00 | Earth work in cutting in foundation of masonary on channels of discharge above 10 Cumecs including lead upto 30 M. and lift upto 1.5M and disposal and back filling as per direction of Engineer-in-charge. | 3.8 | CuM | 100.2 ₹380.76 | 117.36 ₹445.97 | 107 ₹406.60 | 112.16 ₹426.21 | 142 ₹539.60 | 109.6 ₹416.48 | 102.5 ₹389.50 | 105.12 ₹399.46 | 103.54 ₹393.45 | 110.88 ₹421.34 |
| 5.00 | Laying plane cement concrete( M-15 ) in foundation 1:2:4 with stone grit including cost of material, labour, T&P etc.complete. | 0.71 | CuM | 4,752.5 ₹3,374.28 | 5,580.98 ₹3,962.50 | 5,170 ₹3,670.70 | 5,333.14 ₹3,786.53 | 6,800 ₹4,828 | 5,211.26 ₹3,699.99 | 4,875.07 ₹3,461.30 | 4,998.32 ₹3,548.81 | 4,923.72 ₹3,495.84 | 5,272 ₹3,743.12 |
| 6.00 | Laying reinforcement cement concrete in (M25A20) in foundation 1:1:2 with stone grit including cost of material, labour, T&P etc.complete. | 0.32 | CuM | 6,435.4 ₹2,059.33 | 7,479 ₹2,393.28 | 6,400 ₹2,048 | 7,160.91 ₹2,291.49 | 9,100 ₹2,912 | 6,997.26 ₹2,239.12 | 6,545.86 ₹2,094.68 | 6,711.34 ₹2,147.63 | 6,610.21 ₹2,115.27 | 7,078 ₹2,264.96 |
| 7.00 | Class 150 Brick work in 1:3 CM including 3 M lift and 60 M lead including cost of material, labour, T&P etc.complete. | 4 | CuM | 4,910.1 ₹19,640.40 | 5,710.53 ₹22,842.12 | 5,500 ₹22,000 | 5,464.3 ₹21,857.20 | 265 ₹1,060 | 5,339.42 ₹21,357.68 | 4,994.96 ₹19,979.84 | 5,121 ₹20,484 | 5,044.07 ₹20,176.28 | 5,401 ₹21,604 |
| 8.00 | 12.5 mm Cement Plaster in 1:3 cement morter t including cost of material, labour, T&P etc.complete. | 22.53 | SqM | 173.1 ₹3,899.94 | 201.61 ₹4,542.27 | 181 ₹4,077.93 | 192.8 ₹4,343.78 | 240 ₹5,407.20 | 188.4 ₹4,244.65 | 176.24 ₹3,970.69 | 180.5 ₹4,066.67 | 177.97 ₹4,009.66 | 190 ₹4,280.70 |
| 9.00 | Supply and fixing Steel Gate on angle Iron frame 55x55x5 mm ,50x5mm flat iron bracing and welded Iron Mesh 3x30x30mm with one coat of red oxide primer & painting with synthetic enamel paint of approved brand and manufacture to give in even shade ( all work done as per direction of Engineer-in-charge) including cost of all material, labour T&P etc. | 3 | No | 9,404.2 ₹28,212.60 | 10,947.73 ₹32,843.19 | 13,000 ₹39,000 | 10,465.38 ₹31,396.14 | 13,400 ₹40,200 | 10,226.22 ₹30,678.66 | 9,566.5 ₹28,699.50 | 9,808 ₹29,424 | 9,660.56 ₹28,981.68 | 10,345 ₹31,035 |
| 10.00 | Finishing walls with water proofing cement paint of required shade, new work (Two or more coats applied @ 3.84Kg./10 Sqm) | 5,296.5 | SqM | 24 ₹1.3 L | 48.87 ₹2.6 L | 48 ₹2.5 L | 46.73 ₹2.5 L | 49 ₹2.6 L | 45.67 ₹2.4 L | 42.72 ₹2.3 L | 43.5 ₹2.3 L | 43.14 ₹2.3 L | 46 ₹2.4 L |
Tender Value
₹70 L
EMD Value
₹1.4 L
Closing Date
2 Jan 2026, 1:00 pmClosed
SE SIX CIRCLE LUCKNOW
SE Six circle lucknow
Mau nirikshan grah patauna nirikshan grah va mau taarghar ki suraksha hetu precast boundrywall ke nirman ka karya
2025_UPIDC_1101421_3
04/SE-6/2025-26
Open Tender
Civil Works
90 days
Lucknow
Please refer tender document
2 documents required · 2 mandatory
₹3,054
₹1.4 L
SE Six circle lucknow
12 Mar 2026
26 Dec 2025
2 Jan 2026
26 Dec 2025
2 Jan 2026
26 Dec 2025
29 Dec 2025
Cleaning thick jungle and throney bushess without uprooting.
Earth workin leveling ofland including leadupto 30M and lift upto 1.5M, manual compaction,labour, T&P etc. complete asper direction of Engineer-in-charge.
Supply and fixing Precost boundry wall with Poll 150x150 mm, 7No., 3mm high tension PC wire with panel 50mm, 3mm high tension PC wire including earth work and fixing in position (450x450x600mm) in 1:1.5:3 with stonegrit (all works done as per direction of Engineer-in-charge. including cost of all material,labour,T&P etc.
Earth work in cutting in foundation of masonary on channels of discharge above 10 Cumecs including lead upto 30 M. and lift upto 1.5M and disposal and back filling as per direction of Engineer-in-charge.
Laying plane cement concrete( M-15 ) in foundation 1:2:4 with stone grit including cost of material, labour, T&P etc.complete.
Laying reinforcement cement concrete in (M25A20) in foundation 1:1:2 with stone grit including cost of material, labour, T&P etc.complete.
Class 150 Brick work in 1:3 CM including 3 M lift and 60 M lead including cost of material, labour, T&P etc.complete.
12.5 mm Cement Plaster in 1:3 cement morter t including cost of material, labour, T&P etc.complete.
Supply and fixing Steel Gate on angle Iron frame 55x55x5 mm ,50x5mm flat iron bracing and welded Iron Mesh 3x30x30mm with one coat of red oxide primer & painting with synthetic enamel paint of approved brand and manufacture to give in even shade ( all work done as per direction of Engineer-in-charge) including cost of all material, labour T&P etc.
Finishing walls with water proofing cement paint of required shade, new work (Two or more coats applied @ 3.84Kg./10 Sqm)
Please Enable Macros to View BoQ information
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.46 MB
Lot3TDmauih.pdf
Tender Documents • 1.88 MB
BOQ_2030113.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid