| 1 | L1₹1.6 CrAccepted-AOC | ₹1.6 Cr | L1 | Accepted-AOC LOA |
| 2 | L2₹1.6 Cr+₹1.7 L (1.13%)Rejected-Finance | ₹1.6 Cr+₹1.7 L (1.13%) | L2 | Rejected-Finance Rejected |
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
27 Jul 2023, 3:00 pmClosed
The Project Director , DRDA,Dindigul
The Project Director , DRDA,Dindigul
Upgradation/Strengthening of 2 nos Rural Roads in Oddanchatram Block of Dindigul District under Mudhalvarin Grama Salaigal Membattu Thittam MGSMT 25percentage 2022-23TN05-151
2023_RDTN_346361_1
DIPR NO.3578/Tender / 2023 dated. 13.07.2023
Open Tender
Civil Works
Item Wise
180 days
DRDA, DINDIGUL
Upgradation/Strengthening of 2 nos Rural Roads in Oddanchatram Block of Dindigul District under Mudhalvarin Grama Salaigal Membattu Thittam MGSMT 25percentage 2022-23TN05-151
5 documents required · 5 mandatory
₹0
₹1.6 L
DRDA,DINDIGUL
5 Sept 2023
19 Jul 2023
27 Jul 2023
19 Jul 2023
27 Jul 2023
19 Jul 2023
21 Jul 2023
Amount
Name of the work : 1. Strengthening of the road from Odaipatty Higer secondary school to Perumal kovil Road H/O Odaipatty. Km 0/0 - 1/325 Estimate amount : Rs. 58.46 Lakhs
A. Construction work Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation from borrow pits for filling in all classes of soil except sand and hard rock etc with initial lead and lift for raising and widening the existing road sidedrain etc, complete.as per SS20A
Picking the existing worn - out WBM / BT surface using 5 - 10 cm thick including allcost andconveyance of all materials and all labour charges etc complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Provision for Km stone, Hm stone,Guardstone,Name board, Logo board and Cautionary sign boards etc.
KM Stone
HM Stone
Provision for Name board
Provision for DPR Preparation Chrage
Provision for Sign board (900mm Triangular)
Construction of Retaining wall @ch 200m and ch 600m
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size 25x25x3mm for boarding laid over silver oak (country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported by casaurina props of 10 - 13cm dia spaced at 75cm c/c etc. complete.
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
Name of the work : 2. Strengthening of the road from Akkaraipatty - Kalaigar Nagar road H/o Odaipatti. Km 0/00 - 2/690 Estimate amount : Rs. 98.76 Lakhs
A. Construction work Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation from borrow pits for filling in all classes of soil except sand and hard rock etc with initial lead and lift for raising and widening the existing road sidedrain etc, complete.as per SS20A
Picking the existing worn - out WBM / BT surface using 5 - 10 cm thick including allcost andconveyance of all materials and all labour charges etc complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Provision for Km stone, Hm stone,Guardstone,Name board, Logo board and Cautionary sign boards etc.
KM Stone
HM Stone
Provision for Sign board
Provision for Name board
Provision for DPR Preparation Charge
Provision for Road White marking
Construction of Retaining wall @ ch.200m
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size 25x25x3mm for boarding laid over silver oak (country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported by casaurina props of 10 - 13cm dia spaced at 75cm c/c etc. complete.
Construction of Retaining wall @ ch.1200m
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size 25x25x3mm for boarding laid over silver oak (country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported by casaurina props of 10 - 13cm dia spaced at 75cm c/c etc. complete.
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
JAWAHAR CONSTRUCTIONS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .