Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Rejected-Technical 15 5 KNOWLEDGE MANAGEMENT CENTRE MATHURA ROAD FARIDABAD FARIDABAD HARYANA 121003 | FARIDABAD | HARYANA | 121003 | Rejected-Technical Techno-Commercially NOT Acceptable |
Tender Value
Refer Docs
Closing Date
10 Dec 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
R. Govindarajan
Technip India Ltd, No.19, Velachery Main Road, Guindy, Chennai 600032
Design, Engineering, manufacturing, procurement of materials and bought out components, assembly at shop, testing at manufacturers works, inspection by TPIA, packing, supply of ELECTRICAL HEATER
2021_REFHQ_142495_1
TP/077154C001/603/1681-001/061
Limited
Electrical - All
Supply
210 days
IOCL, Gujarat Refinery
Refer Tender Documents
4 documents required · 4 mandatory
Exempted
22 Feb 2022
22 Oct 2021
13 Dec 2021
22 Oct 2021
10 Dec 2021
10 Nov 2021
22 Oct 2021 - 6 Dec 2021
120 days
GDS H2 Purification reactor feed electrical heater with thyristor control panel
Training requirement at site - Per diem charges for upto 8 hours work on normal working days
Comprehensive AMC for Thyristor control panel (TCP)
Comprehensive AMC for Thyristor control panel (TCP) for 1st Year
Comprehensive AMC for Thyristor control panel (TCP) for 2nd Year
Comprehensive AMC for Thyristor control panel (TCP) for 3rd Year
Comprehensive AMC for Thyristor control panel (TCP) for 4th Year
Comprehensive AMC for Thyristor control panel (TCP) for 5th Year
Site Supervision
Supervision during Erection, Pre-Commissioning and Commissioning (Refer Note: 7 above) - Per diem charges for upto 8 hours work on normal working days
Supervision during Erection, Pre-Commissioning and Commissioning (Refer Note: 8 above) - Overtime rate/hour beyond normal 8 Hours work on normal working days
Supervision during Erection, Pre-Commissioning and Commissioning (Refer Note: 8 above) - Overtime rate/hour for work on weekly off days / Holidays (as applicable to project site)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .