Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.6 CrAccepted-AOC 143 SHASHTRI NAGAR DISTRICT LAKHIMPUR KHERI UP | ₹8.6 Cr Quoted ₹7.7 Cr | L1 | Accepted-AOC Financial bid is Accepted at the price of Rs. 86323215.55 by the Employer. |
| 2 | L2₹7.8 Cr+₹9.9 L (1.29%)Rejected-Finance | ₹7.8 Cr+₹9.9 L (1.29%) | L2 | Rejected-Finance Due to L2 Rate |
| 3 | L3₹7.8 Cr+₹12.5 L (1.62%)Rejected-Finance | ₹7.8 Cr+₹12.5 L (1.62%) | L3 | Rejected-Finance Due to L3 Rate |
| 4 | L4₹8.3 Cr+₹63.3 L (8.21%)Rejected-Finance | ₹8.3 Cr+₹63.3 L (8.21%) | L4 | Rejected-Finance Due to L4 Rate |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹17.6 L
Closing Date
4 Jan 2021, 2:00 pmClosed
S.E.Sitapur/Kheri Circle PWD Sitapur
Office of the S.E.Sitapur/Kheri Circle PWD Sitapur
Renewal of Lakhimpur-Mohammdi road (MDR-86) In Km-4 to 42.680 by 25mm thick B.C (By H.M.P.)
2020_CEUCZ_538237_1
4361/352C/E.TENDER/STP-LMP/20 Dt. 07.12.2020
Open Tender
Civil Works - Roads
Item Rate
120 days
Kheri
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹17.6 L
Yes
Office of the S.E.Sitapur/Kheri Circle PWD Sitapur
4 Mar 2021
15 Dec 2020
5 Jan 2021
15 Dec 2020
4 Jan 2021
15 Dec 2020
18 Dec 2020
Amount
Providing and laying slurry seal consisting of a mixture of fine aggregates,portland cement filler,bituminous emulsion and water on a road surface including cleaning of surface,mixing of slurry seal in a sutaible mobile plant ,laying and compacting to provide even riding surface.
Providing and applying tack coat with VG-10 using bitumen distributor at tha rate of 0.30 kg per sqm on the prepared surface cleaned with hydraulic broom.
Providing and laying bituminious concrete with 100THP computerised Hot Mix Plant Producing & average output of 75 tonne per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4% of Mix & filler, transporting the hot mix to work site,laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H Specifications Clause 509 complete in all respects.
Maintenance Charge of firsy Year to Fourth Year of Riding Surface Maintenace Charge of 1st Year is 0.00
Maintenace Charge of 2nd Year
Maintenace Charge of 3rd Year
Maintenace Charge of 4th Year
M/S KANISHKA CONSTRUCTION
M/S AJAY PRAKASH ASSOCIATES
M/S SOBTI INFRATECH LIMITED
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .