| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-Finance GRAM MANELA PO GHAGHAS DWARAHAT | ALMORA | UTTARAKHAND | 263601 | ₹1.0 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹1.0 CrAccepted-Finance BADI BARGICHA ALMORA DISTRICT UTTARAKHAND | ALMORA | UTTARAKHAND | 263601 | ₹1.0 Cr | L2 | Accepted-Finance L2 |
| 3 | L3₹1.1 CrAccepted-Finance | ₹1.1 Cr | L3 | Accepted-Finance L3 |
| 4 | L4₹1.1 CrAccepted-Finance | ₹1.1 Cr | L4 | Accepted-Finance L4 |
| 5 | L5₹1.1 CrAccepted-Finance | ₹1.1 Cr | L5 | Accepted-Finance L5 |
| Sl No | Description | Qty | Unit | Mahesh Chandra Sanwal L2 | JAGDISH CHANDRA BHATT L4 | Suresh Chandra Lohani L5 | Jeevan Singh Mehra L1 | BHARAT SINGH ADHIKARI L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means manual means in foundation trenches or drains,including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 291.51 | cum | 175 ₹51,014.25 | 200 ₹58,302 | 188.78 ₹55,031.26 | 150 ₹43,726.50 | 189 ₹55,095.39 |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 | 70.96 | cum | 5,200 ₹3.7 L | 5,000 ₹3.5 L | 4,952.95 ₹3.5 L | 5,000 ₹3.5 L | 4,964 ₹3.5 L |
| 3.00 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 69.36 | cum | 500 ₹34,680 | 1,500 ₹1.0 L | 1,543.72 ₹1.1 L | 1,250 ₹86,700 | 1,547 ₹1.1 L |
| 4.00 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 | 28.43 | cum | 4,200 ₹1.2 L | 5,000 ₹1.4 L | 5,315.93 ₹1.5 L | 4,500 ₹1.3 L | 5,328 ₹1.5 L |
| 5.00 | Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 | 86.87 | cum | 7,000 ₹6.1 L | 5,700 ₹5.0 L | 6,577.34 ₹5.7 L | 7,250 ₹6.3 L | 6,592 ₹5.7 L |
| 6.00 | Reinforced cement concrete work in walls (any thickness) , including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 | 44.33 | cum | 7,800 ₹3.5 L | 7,500 ₹3.3 L | 7,891.95 ₹3.5 L | 8,500 ₹3.8 L | 7,909 ₹3.5 L |
| 7.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills,staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 | 65.16 | cum | 8,200 ₹5.3 L | 7,800 ₹5.1 L | 8,366.48 ₹5.5 L | 8,500 ₹5.5 L | 8,385 ₹5.5 L |
| 8.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending,placing in position and binding all complete.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 28,711.96 | Kg | 80 ₹23.0 L | 77 ₹22.1 L | 78.09 ₹22.4 L | 75 ₹21.5 L | 78.6 ₹22.6 L |
| 9.00Centering and shuttering including strutting, ropping etc. and removal of form for. | ||||||||
| 10.00 | Foundations, footings, bases of columns, etc. for mass concrete | 127.2 | Sq.m | 240 ₹30,528 | 280 ₹35,616 | 284.89 ₹36,238.01 | 250 ₹31,800 | 200 ₹25,440 |
Tender Value
₹1.3 Cr
EMD Value
₹2.5 L
Closing Date
16 Apr 2026, 3:00 pmClosed
EE RWD ALMORA
EE RWD ALMORA
The work of strengthening the District Library Almora
2026_RES_93707_1
1948 Dated 25-03-2025
Open Tender
Civil Works - Buildings
365 days
Almora
The work of strengthening the District Library Almora
3 documents required · 3 mandatory
₹4,720
EE RWD ALMORA
₹2.5 L
23 Apr 2026
3 Apr 2026
16 Apr 2026
4 Apr 2026
16 Apr 2026
4 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means manual means in foundation trenches or drains,including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | - | cum | - | - | 1 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 | - | cum | - | - | 2 |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | - | cum | - | - | 3 |
| 4 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 | - | cum | - | - | 4 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 | - | cum | - | - | 5 |
| 6 | Reinforced cement concrete work in walls (any thickness) , including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 | - | cum | - | - | 6 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills,staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 | - | cum | - | - | 7 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending,placing in position and binding all complete.Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | Kg | - | - | 8 |
| 9 | Centering and shuttering including strutting, ropping etc. and removal of form for. | - | - | - | - | 9 |
| 10 | Foundations, footings, bases of columns, etc. for mass concrete | - | Sq.m | - | - | 10 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_110917.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.33 MB
Tendernotice_2.pdf
PDF • 3.88 MB
BOQ_110917.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid