Loading…
Loading…
Tender Value
₹4.5 L
EMD Value
₹4,600
Closing Date
15 Jun 2026, 6:00 pm
Executive Engineer, panchayat, R & B Division, Surat.
Work of shed at Vareli Primary School Ta: Palsana Di.: Surat
308522
03 0F 2026-27
Open
Civil Works - Others
Surat
5 documents required · 5 mandatory
₹600
Executive Engineer, panchayat R & B Division, surat
₹4,600
26 May 2026
26 May 2026
26 May 2026
15 Jun 2026
26 May 2026
Item No. Quantity Unit Rate in Figures Amount
Book of Specifications)
Excavation for foundation upto 1.5 m depth including sorting out
1 and stacking of useful materials and disposing off the excavated 15.12 CMT. 122.94
stuff upto 50 Meter lead.(A) Loose or soft soil
Providing and laying cement concrete 1:2:4 (1- Cement : 2- Coarse
sand : 4- graded stone aggregates 20 mm nominal size) and curing
complete excluding cost of formwork in (A) Foundation and Plinth
(more than 10 ton)
Providing and laying cement concrete work 1:2:4 (1- Cement : 2-
Coarse sand : 4- graded stone aggregates 20 mm nominal size) and
curing complete excluding cost of formwork and reinforcement for
reinforced concrete work in (B) Slabs, landing, shelves, Balconis
Lintels, Beams, Girders and Cantilever upto floor two level. (more
than 10 ton)
Providing Mild Steel reinfircement for R.C.C. work including
4 bending binding, and placing in position complete upto floor two 122.59 CMT. 61.65
level. (upto 10 ton)
Providing and fixing pre-cast Rubble dye inter locking cocnrete
block 60mm thick with grade concrete M300 pnumatic compressed
by mechanically pressed and as per approved design including
mm sand/stone dust layer for levelling and filling the joint with
sand/stone dust in proper line and level etc. complete.
SHEDULE B Page
Description of Item (With brif Specification And Reference to
Item No. Quantity Unit Rate in Figures Amount
Book of Specifications)
Steel work, Galvanized mild steel welded in built up sections
framed work including cutting, hoisting, fixing in position and
applying a priming coat of read lead paint. (A)In beams and joists,
channels angles Tees, flats, with connecting plates or angle cleats
as in main and cross beams. Hip and jack rafters, purlins conneted
to common rafters and the like (upto 10 ton
Providing corrugated G.I. sheet of class-3 roofing fixed with
glavanished iron J or L Hooks, Bolts and nuts 8mm diameter with
7 bitumen and G.I. limpet washer or G.I. limpet washer. filled with 104.88 CMT. 734.19
white lead complete excluding the cost of purlins, Rafters and
Trusses.(1) 0.80 mm thick sheet. (upto 10 ton)
Filling available excavated earth (excluding rock) in trenches.
plinth, sides of foundations etc. in layers not exceeding 20 cm. in
depth consolidating each disposited layer by ramming and
Supplying and fixing road sign board of M.S.Plates and angle iron
including painting,lettering etc.complete including fixing in c.c
1:4:8 with necessary excavation etc.complete ae per I.R.C.type
design (i) Non -Reflective type
I we am / are willing to carry out the work at …................................ % above/ Below percent ( Should Be writen in figures And words)
of the estimated rate mentioned above. Amount of my / our tender works out as under.
Estimated Amount Put to tender. 4,45,818.69 Estimated Amount Put to tender.
Deduct…........ % Below Deduct…........ % Below
In Words In Words
SHEDULE B Page
Description of Item (With brif Specification And Reference to
Item No. Quantity Unit Rate in Figures Amount
Book of Specifications)
(1) The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra
payment shall be made.
(2) The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
(3) GST and Income tax TDS will be deducted at a source while making payments of bills
(4) In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement
Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost of
difference of cement consumption have been deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Signature of Bidder
Deputy Executive Engineer, Executive Engineer
Panchayat ( R&B) Sub Division, Panchayat ( R&B) Division
Palsana Surat
SHEDULE B Page
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
3.Cement Standards -11-05-17 GR 2 Side.pdf
4.Tender Negotiation.pdf
5.Laboratory GR.pdf
6.GST GR.pdf
7.Steel Lap.pdf
11. Other GR.pdf
8.Clause 47 48.pdf
14 Building Booklet civil.pdf
Cement consumption gr.pdf
GST GR 1.pdf
Inspection 1.pdf
Laboratory GR 1.pdf
Steel Lap 1.pdf
5.GR.pdf
4.0 tender booklet.pdf
GR.pdf
CamScanner 04-09-2025 15.03.58.pdf
GRs - SBD with Index_11zon (1).pdf
DMO_2876_01-May-2025_273.pdf
SBD સાથે જરૂરી દસ્તાવેજો For VC AND SC.pdf
GRs - SBD with Index_11zon (2).pdf
2.0 SBD VARELI SHED (2).pdf
3.0 Specification VARELI SHED.pdf
BOQ VARELI SHED.pdf
Download all tender documents and submit your bid