Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical HOUSE NO 369 ASNABAD RANCHI PATNA ROAD JHUMRI TELAIYA KODERMA JHARKHAND 825409 | KODERMA | JHARKHAND | 825409 | - | Rejected-Technical Not fulfill the condition of NIT |
Tender Value
₹6.2 L
EMD Value
₹12,400
Closing Date
23 May 2023, 3:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE (EHT-Construction)
Block No. 4, Shakti Bhawan, Rampur
Tender for carrying out all the works related to civil design and drawing section i.e Structural Design and drawing work, vetting of design and drawings, preparation / checking of estimates etc. in respect of various Civil structures for CE (PandD)
2023_MPPTC_269532_1
93
Open Tender
Consultancy
Percentage
365 days
Jabalpur
Please refer tender document
12 documents required · 12 mandatory
₹590
₹12,400
Yes
17 Aug 2023
20 Apr 2023
24 May 2023
20 Apr 2023
23 May 2023
20 Apr 2023
Amount
Total of BOQ2 +BOQ3
Amount as per BOQ2
Amount as per BOQ3
Bidder Name
Amount
AWANEESH NEMA AND ASSOCIATES(GSTN-23ACWPN5050H1ZE)
Description of Work / Item(s)
Amount
Preparation of the structure design & drawing by a structural engineer empanelled with the Chief Architect MP PWD for foundation works in respect of establishment of the power transformer incluiding Main foundation work with all ancilliary foundation work like Jacking pad, Marshalling Box, Radiator, Radiator fan etc. all complete alongwith Oil drain pit (if required) and any other structure foundation as per rerquirement of manufacturers/ deptt. using auto-cad on the basis of architectural drawings/ Machine drawings, electrical drawings etc. along with load details, strata encountered and other relavant conditions of site for establishment of Power Transformer supplied/approved by the department, in accordance with relevant codes / manuals and according to the "Terms & conditions “, of order.The structural engineer shall do revision/ compliances of the required, without any additional cost within stipulated time and obtain approval from the competent authority. Design and drawing shall also include ‘Tables ‘for the bar-bending schedules. (BBS) design and concrete/steel consumption. The design and drawing shall be submitted to the Engineer –in Charge in six hard copies and one soft copy for execution. The payment shall be done on final completion of all design and drawing work. ...400/220 KV Power transformer of any capacity any make
Preparation of the structure design & drawing by a structural engineer empanelled with the Chief Architect MP PWD for foundation works in respect of establishment of the power transformer incluiding Main foundation work with all ancilliary foundation work like Jacking pad, Marshalling Box, Radiator, Radiator fan etc. all complete alongwith Oil drain pit (if required) and any other structure foundation as per rerquirement of manufacturers/ deptt. using auto-cad on the basis of architectural drawings/ Machine drawings, electrical drawings etc. along with load details, strata encountered and other relavant conditions of site for establishment of Power Transformer supplied/approved by the department, in accordance with relevant codes / manuals and according to the "Terms & conditions “, of order.The structural engineer shall do revision/ compliances of the required, without any additional cost within stipulated time and obtain approval from the competent authority. Design and drawing shall also include ‘Tables ‘for the bar-bending schedules. (BBS) design and concrete/steel consumption. The design and drawing shall be submitted to the Engineer –in Charge in six hard copies and one soft copy for execution. The payment shall be done on final completion of all design and drawing work. ...220/132 KV Power transformer of any capacity any make
Preparation of the structure design & drawing by a structural engineer empanelled with the Chief Architect MP PWD for foundation works in respect of establishment of the power transformer incluiding Main foundation work with all ancilliary foundation work like Jacking pad, Marshalling Box, Radiator, Radiator fan etc. all complete alongwith Oil drain pit (if required) and any other structure foundation as per rerquirement of manufacturers/ deptt. using auto-cad on the basis of architectural drawings/ Machine drawings, electrical drawings etc. along with load details, strata encountered and other relavant conditions of site for establishment of Power Transformer supplied/approved by the department, in accordance with relevant codes / manuals and according to the "Terms & conditions “, of order.The structural engineer shall do revision/ compliances of the required, without any additional cost within stipulated time and obtain approval from the competent authority. Design and drawing shall also include ‘Tables ‘for the bar-bending schedules. (BBS) design and concrete/steel consumption. The design and drawing shall be submitted to the Engineer –in Charge in six hard copies and one soft copy for execution. The payment shall be done on final completion of all design and drawing work. .....132/33 KV Power transformer of any capacity any make
Preparation of the structure design & drawing by a structural engineer empanelled with the Chief Architect MP PWD for foundation works in respect of establishment of the power transformer incluiding Main foundation work with all ancilliary foundation work like Jacking pad, Marshalling Box, Radiator, Radiator fan etc. all complete alongwith Oil drain pit (if required) and any other structure foundation as per rerquirement of manufacturers/ deptt. using auto-cad on the basis of architectural drawings/ Machine drawings, electrical drawings etc. along with load details, strata encountered and other relavant conditions of site for establishment of Power Transformer supplied/approved by the department, in accordance with relevant codes / manuals and according to the "Terms & conditions “, of order.The structural engineer shall do revision/ compliances of the required, without any additional cost within stipulated time and obtain approval from the competent authority. Design and drawing shall also include ‘Tables ‘for the bar-bending schedules. (BBS) design and concrete/steel consumption. The design and drawing shall be submitted to the Engineer –in Charge in six hard copies and one soft copy for execution. The payment shall be done on final completion of all design and drawing work. ......220/33 KV Power transformer of any capacity any make
Preparation of the Architetural / structure design & drawing by a structural engineer empanelled with the Chief Architect MP PWD for foundation work of any structure/equipment to be erected in yard or any other civil structure such as Boundary wall, Cable trench, Culvert Retaining wall, Fire Protection wall etc. using autocad on the basis of architectural drawings/Machine drawings, electrical drawings etc. along with load details, strata encountered and other relavant conditions of site for establishment of Structure supplied/approved by the department, in accordance with relevant codes / manuals and according to the "Terms & conditions “, of order.The structural engineer shall do revision/ compliances of the required, without any additional cost within stipulated time and obtain approval from the competent authority. Design and drawing shall also include ‘Tables ‘for the bar-bending schedules. (BBS) design and concrete/steel consumption.The design and drawing shall be submitted to the Engineer –in Charge in six hard copies and one soft copy for execution. The payment shall be done on final completion of all design and drawing work.....Boundary wall
Preparation of the Architetural / structure design & drawing by a structural engineer empanelled with the Chief Architect MP PWD for foundation work of any structure/equipment to be erected in yard or any other civil structure such as Boundary wall, Cable trench, Culvert Retaining wall, Fire Protection wall etc. using autocad on the basis of architectural drawings/Machine drawings, electrical drawings etc. along with load details, strata encountered and other relavant conditions of site for establishment of Structure supplied/approved by the department, in accordance with relevant codes / manuals and according to the "Terms & conditions “, of order.The structural engineer shall do revision/ compliances of the required, without any additional cost within stipulated time and obtain approval from the competent authority. Design and drawing shall also include ‘Tables ‘for the bar-bending schedules. (BBS) design and concrete/steel consumption.The design and drawing shall be submitted to the Engineer –in Charge in six hard copies and one soft copy for execution. The payment shall be done on final completion of all design and drawing work.....Structure Foundations
Preparation of the Architetural / structure design & drawing by a structural engineer empanelled with the Chief Architect MP PWD for foundation work of any structure/equipment to be erected in yard or any other civil structure such as Boundary wall, Cable trench, Culvert Retaining wall, Fire Protection wall etc. using autocad on the basis of architectural drawings/Machine drawings, electrical drawings etc. along with load details, strata encountered and other relavant conditions of site for establishment of Structure supplied/approved by the department, in accordance with relevant codes / manuals and according to the "Terms & conditions “, of order.The structural engineer shall do revision/ compliances of the required, without any additional cost within stipulated time and obtain approval from the competent authority. Design and drawing shall also include ‘Tables ‘for the bar-bending schedules. (BBS) design and concrete/steel consumption.The design and drawing shall be submitted to the Engineer –in Charge in six hard copies and one soft copy for execution. The payment shall be done on final completion of all design and drawing work.....Cable Trench of any type
Preparation of the Architetural / structure design & drawing by a structural engineer empanelled with the Chief Architect MP PWD for foundation work of any structure/equipment to be erected in yard or any other civil structure such as Boundary wall, Cable trench, Culvert Retaining wall, Fire Protection wall etc. using autocad on the basis of architectural drawings/Machine drawings, electrical drawings etc. along with load details, strata encountered and other relavant conditions of site for establishment of Structure supplied/approved by the department, in accordance with relevant codes / manuals and according to the "Terms & conditions “, of order.The structural engineer shall do revision/ compliances of the required, without any additional cost within stipulated time and obtain approval from the competent authority. Design and drawing shall also include ‘Tables ‘for the bar-bending schedules. (BBS) design and concrete/steel consumption.The design and drawing shall be submitted to the Engineer –in Charge in six hard copies and one soft copy for execution. The payment shall be done on final completion of all design and drawing work......Storage/ Office shed
Preparation of the Architetural / structure design & drawing by a structural engineer empanelled with the Chief Architect MP PWD for foundation work of any structure/equipment to be erected in yard or any other civil structure such as Boundary wall, Cable trench, Culvert Retaining wall, Fire Protection wall etc. using autocad on the basis of architectural drawings/Machine drawings, electrical drawings etc. along with load details, strata encountered and other relavant conditions of site for establishment of Structure supplied/approved by the department, in accordance with relevant codes / manuals and according to the "Terms & conditions “, of order.The structural engineer shall do revision/ compliances of the required, without any additional cost within stipulated time and obtain approval from the competent authority. Design and drawing shall also include ‘Tables ‘for the bar-bending schedules. (BBS) design and concrete/steel consumption.The design and drawing shall be submitted to the Engineer –in Charge in six hard copies and one soft copy for execution. The payment shall be done on final completion of all design and drawing work.....Culvert
Preparation of the Architetural / structure design & drawing by a structural engineer empanelled with the Chief Architect MP PWD for foundation work of any structure/equipment to be erected in yard or any other civil structure such as Boundary wall, Cable trench, Culvert Retaining wall, Fire Protection wall etc. using autocad on the basis of architectural drawings/Machine drawings, electrical drawings etc. along with load details, strata encountered and other relavant conditions of site for establishment of Structure supplied/approved by the department, in accordance with relevant codes / manuals and according to the "Terms & conditions “, of order.The structural engineer shall do revision/ compliances of the required, without any additional cost within stipulated time and obtain approval from the competent authority. Design and drawing shall also include ‘Tables ‘for the bar-bending schedules. (BBS) design and concrete/steel consumption.The design and drawing shall be submitted to the Engineer –in Charge in six hard copies and one soft copy for execution. The payment shall be done on final completion of all design and drawing work.....Retaining Wall (RCC)
Preparation of the Architetural / structure design & drawing by a structural engineer empanelled with the Chief Architect MP PWD for foundation work of any structure/equipment to be erected in yard or any other civil structure such as Boundary wall, Cable trench, Culvert Retaining wall, Fire Protection wall etc. using autocad on the basis of architectural drawings/Machine drawings, electrical drawings etc. along with load details, strata encountered and other relavant conditions of site for establishment of Structure supplied/approved by the department, in accordance with relevant codes / manuals and according to the "Terms & conditions “, of order.The structural engineer shall do revision/ compliances of the required, without any additional cost within stipulated time and obtain approval from the competent authority. Design and drawing shall also include ‘Tables ‘for the bar-bending schedules. (BBS) design and concrete/steel consumption.The design and drawing shall be submitted to the Engineer –in Charge in six hard copies and one soft copy for execution. The payment shall be done on final completion of all design and drawing work......Retaining Wall (PCC )
Preparation of the Architetural / structure design & drawing by a structural engineer empanelled with the Chief Architect MP PWD for foundation work of any structure/equipment to be erected in yard or any other civil structure such as Boundary wall, Cable trench, Culvert Retaining wall, Fire Protection wall etc. using autocad on the basis of architectural drawings/Machine drawings, electrical drawings etc. along with load details, strata encountered and other relavant conditions of site for establishment of Structure supplied/approved by the department, in accordance with relevant codes / manuals and according to the "Terms & conditions “, of order.The structural engineer shall do revision/ compliances of the required, without any additional cost within stipulated time and obtain approval from the competent authority. Design and drawing shall also include ‘Tables ‘for the bar-bending schedules. (BBS) design and concrete/steel consumption.The design and drawing shall be submitted to the Engineer –in Charge in six hard copies and one soft copy for execution. The payment shall be done on final completion of all design and drawing work......Fire Protection Wall
Preparation of the Architetural / structure design & drawing by a structural engineer empanelled with the Chief Architect MP PWD for foundation work of any structure/equipment to be erected in yard or any other civil structure such as Boundary wall, Cable trench, Culvert Retaining wall, Fire Protection wall etc. using autocad on the basis of architectural drawings/Machine drawings, electrical drawings etc. along with load details, strata encountered and other relavant conditions of site for establishment of Structure supplied/approved by the department, in accordance with relevant codes / manuals and according to the "Terms & conditions “, of order.The structural engineer shall do revision/ compliances of the required, without any additional cost within stipulated time and obtain approval from the competent authority. Design and drawing shall also include ‘Tables ‘for the bar-bending schedules. (BBS) design and concrete/steel consumption.The design and drawing shall be submitted to the Engineer –in Charge in six hard copies and one soft copy for execution. The payment shall be done on final completion of all design and drawing work.....Septic tank
Vetting of all structural design/drawing by a structural engineer empanelled with the Chief Architect MP PWD of any building or structure supplied by the deptt. incluiding checking and conforming compliances of all design parameters as per relavant IS codes, prescribed specifications for execution of work on the basis of site conditions, strata encountered and other related issues including suggestions, modifications, additions,alteration in supplied drawing (if required), and thereafter rechecking of drawing regarding incorporation of suggested corrections in the modified drawing,and repetition of the above procedure without any extra/ additional payment upto entire satisfaction of the Engineer-In-Charge and till final vetting of the drawing. After finalisation the design and drawing shall be submitted to the Engineer –in Charge in six hard copies and one soft copy for execution.The payment shall be done on final completion of vetting of all design and drawing work......Building Works
Vetting of all structural design/drawing by a structural engineer empanelled with the Chief Architect MP PWD of any building or structure supplied by the deptt. incluiding checking and conforming compliances of all design parameters as per relavant IS codes, prescribed specifications for execution of work on the basis of site conditions, strata encountered and other related issues including suggestions, modifications, additions,alteration in supplied drawing (if required), and thereafter rechecking of drawing regarding incorporation of suggested corrections in the modified drawing,and repetition of the above procedure without any extra/ additional payment upto entire satisfaction of the Engineer-In-Charge and till final vetting of the drawing. After finalisation the design and drawing shall be submitted to the Engineer –in Charge in six hard copies and one soft copy for execution.The payment shall be done on final completion of vetting of all design and drawing work.....Boundary wall
Vetting of all structural design/drawing by a structural engineer empanelled with the Chief Architect MP PWD of any building or structure supplied by the deptt. incluiding checking and conforming compliances of all design parameters as per relavant IS codes, prescribed specifications for execution of work on the basis of site conditions, strata encountered and other related issues including suggestions, modifications, additions,alteration in supplied drawing (if required), and thereafter rechecking of drawing regarding incorporation of suggested corrections in the modified drawing,and repetition of the above procedure without any extra/ additional payment upto entire satisfaction of the Engineer-In-Charge and till final vetting of the drawing. After finalisation the design and drawing shall be submitted to the Engineer –in Charge in six hard copies and one soft copy for execution.The payment shall be done on final completion of vetting of all design and drawing work......Transformer foundations including all ancilliary foundations
Vetting of all structural design/drawing by a structural engineer empanelled with the Chief Architect MP PWD of any building or structure supplied by the deptt. incluiding checking and conforming compliances of all design parameters as per relavant IS codes, prescribed specifications for execution of work on the basis of site conditions, strata encountered and other related issues including suggestions, modifications, additions,alteration in supplied drawing (if required), and thereafter rechecking of drawing regarding incorporation of suggested corrections in the modified drawing,and repetition of the above procedure without any extra/ additional payment upto entire satisfaction of the Engineer-In-Charge and till final vetting of the drawing. After finalisation the design and drawing shall be submitted to the Engineer –in Charge in six hard copies and one soft copy for execution.The payment shall be done on final completion of vetting of all design and drawing work.....Structure Foundations
Vetting of all structural design/drawing by a structural engineer empanelled with the Chief Architect MP PWD of any building or structure supplied by the deptt. incluiding checking and conforming compliances of all design parameters as per relavant IS codes, prescribed specifications for execution of work on the basis of site conditions, strata encountered and other related issues including suggestions, modifications, additions,alteration in supplied drawing (if required), and thereafter rechecking of drawing regarding incorporation of suggested corrections in the modified drawing,and repetition of the above procedure without any extra/ additional payment upto entire satisfaction of the Engineer-In-Charge and till final vetting of the drawing. After finalisation the design and drawing shall be submitted to the Engineer –in Charge in six hard copies and one soft copy for execution.The payment shall be done on final completion of vetting of all design and drawing work.....Cable Trench of any type
Vetting of all structural design/drawing by a structural engineer empanelled with the Chief Architect MP PWD of any building or structure supplied by the deptt. incluiding checking and conforming compliances of all design parameters as per relavant IS codes, prescribed specifications for execution of work on the basis of site conditions, strata encountered and other related issues including suggestions, modifications, additions,alteration in supplied drawing (if required), and thereafter rechecking of drawing regarding incorporation of suggested corrections in the modified drawing,and repetition of the above procedure without any extra/ additional payment upto entire satisfaction of the Engineer-In-Charge and till final vetting of the drawing. After finalisation the design and drawing shall be submitted to the Engineer –in Charge in six hard copies and one soft copy for execution.The payment shall be done on final completion of vetting of all design and drawing work....Storage/ Office shed
Vetting of all structural design/drawing by a structural engineer empanelled with the Chief Architect MP PWD of any building or structure supplied by the deptt. incluiding checking and conforming compliances of all design parameters as per relavant IS codes, prescribed specifications for execution of work on the basis of site conditions, strata encountered and other related issues including suggestions, modifications, additions,alteration in supplied drawing (if required), and thereafter rechecking of drawing regarding incorporation of suggested corrections in the modified drawing,and repetition of the above procedure without any extra/ additional payment upto entire satisfaction of the Engineer-In-Charge and till final vetting of the drawing. After finalisation the design and drawing shall be submitted to the Engineer –in Charge in six hard copies and one soft copy for execution.The payment shall be done on final completion of vetting of all design and drawing work....Culvert
Vetting of all structural design/drawing by a structural engineer empanelled with the Chief Architect MP PWD of any building or structure supplied by the deptt. incluiding checking and conforming compliances of all design parameters as per relavant IS codes, prescribed specifications for execution of work on the basis of site conditions, strata encountered and other related issues including suggestions, modifications, additions,alteration in supplied drawing (if required), and thereafter rechecking of drawing regarding incorporation of suggested corrections in the modified drawing,and repetition of the above procedure without any extra/ additional payment upto entire satisfaction of the Engineer-In-Charge and till final vetting of the drawing. After finalisation the design and drawing shall be submitted to the Engineer –in Charge in six hard copies and one soft copy for execution.The payment shall be done on final completion of vetting of all design and drawing work.....Retaining Wall (RCC)
Vetting of all structural design/drawing by a structural engineer empanelled with the Chief Architect MP PWD of any building or structure supplied by the deptt. incluiding checking and conforming compliances of all design parameters as per relavant IS codes, prescribed specifications for execution of work on the basis of site conditions, strata encountered and other related issues including suggestions, modifications, additions,alteration in supplied drawing (if required), and thereafter rechecking of drawing regarding incorporation of suggested corrections in the modified drawing,and repetition of the above procedure without any extra/ additional payment upto entire satisfaction of the Engineer-In-Charge and till final vetting of the drawing. After finalisation the design and drawing shall be submitted to the Engineer –in Charge in six hard copies and one soft copy for execution.The payment shall be done on final completion of vetting of all design and drawing work......Retaining Wall (PCC )
Vetting of all structural design/drawing by a structural engineer empanelled with the Chief Architect MP PWD of any building or structure supplied by the deptt. incluiding checking and conforming compliances of all design parameters as per relavant IS codes, prescribed specifications for execution of work on the basis of site conditions, strata encountered and other related issues including suggestions, modifications, additions,alteration in supplied drawing (if required), and thereafter rechecking of drawing regarding incorporation of suggested corrections in the modified drawing,and repetition of the above procedure without any extra/ additional payment upto entire satisfaction of the Engineer-In-Charge and till final vetting of the drawing. After finalisation the design and drawing shall be submitted to the Engineer –in Charge in six hard copies and one soft copy for execution.The payment shall be done on final completion of vetting of all design and drawing work.....Fire Protection Wall
Vetting of all structural design/drawing by a structural engineer empanelled with the Chief Architect MP PWD of any building or structure supplied by the deptt. incluiding checking and conforming compliances of all design parameters as per relavant IS codes, prescribed specifications for execution of work on the basis of site conditions, strata encountered and other related issues including suggestions, modifications, additions,alteration in supplied drawing (if required), and thereafter rechecking of drawing regarding incorporation of suggested corrections in the modified drawing,and repetition of the above procedure without any extra/ additional payment upto entire satisfaction of the Engineer-In-Charge and till final vetting of the drawing. After finalisation the design and drawing shall be submitted to the Engineer –in Charge in six hard copies and one soft copy for execution.The payment shall be done on final completion of vetting of all design and drawing work.....Septic tank
Checking of detailed estimate on the basis of the working drawing (Structural/ Architectural) supplied by the department current SOR applicable, and Standard Measurement Book of the MPPTCL including checking/computation of bill of quantities (BOQ) of material and supplying the same in six hard copies and one soft copy to the Engineer –in Charge and if required revision of the same without any additional charges (Work shall be got done through consultants duly empanelled with chief Architect MP P.W.D) .The estimate shall be prepared only in format prescribed by the department and shall be submitted in six hard copies and one soft copy to the Engineer –in Charge of work.The payment shall be done on final completion of checking of estimate work.( The % (percentage rate ) on the estiamted value as given in the schedule, the rate to be quoted in the form of decimal ( for example 2% to be indicated as 0.02 )
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .