| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 CrAdmitted-Finance | ₹2.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.6 CrAdmitted-Finance | ₹2.6 Cr | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | K SARAVANAN L2 | P. Jaisankar L1 |
|---|---|---|---|---|---|
| 1.00 | Improvement of the Road From Sobanapuram to Osarapalli KM 0/0-4/00 ( R - 34 PUR ) ,Uppliyapuram Block,Tiruchirappalli District under MGSMT - 2025-26 (Savings Fund) scheme.
Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete. Km 0 / 0 - 3/820 | 3,232.55 | sqm | 7 ₹22,627.85 | 6 ₹19,395.30 |
| 2.00 | Picking old metalled / BT surface upto 10cm thick as directed by the departmental officers Km 0 / 0 - 3/820 | 3,658.08 | sqm | 25 ₹91,452 | 23 ₹84,135.84 |
| 3.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out Km 0 / 0 - 3/820 | 1,616.27 | cum | 142 ₹2.3 L | 140 ₹2.3 L |
| 4.00 | Providing and laying including cost and conveyance of Gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content Km 0 / 0 - 1/00 | 329.9 | cum | 370 ₹1.2 L | 368 ₹1.2 L |
| 5.00 | Km 1 /00 - 2/00 | 336.01 | cum | 370 ₹1.2 L | 368 ₹1.2 L |
| 6.00 | Km 2 /00 - 3/00 | 320.62 | cum | 370 ₹1.2 L | 368 ₹1.2 L |
| 7.00 | Km 3 /00 - 3/820 | 276.75 | cum | 370 ₹1.0 L | 368 ₹1.0 L |
| 8.00 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401 Km 3/00-3/820 | 615 | cum | 2,585 ₹15.9 L | 2,581 ₹15.9 L |
| 9.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Km 0 / 0 - 3/820 | 2,338.02 | cum | 2,645 ₹61.8 L | 2,644 ₹61.8 L |
| 10.00 | Providing and laying of Prime Coat using Emulsion (SS1) at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.Km 0 / 0 - 3/820 | 14,049.25 | sqm | 90 ₹12.6 L | 86 ₹12.1 L |
Updated dates
Tender Value
₹2.7 Cr
EMD Value
₹2.7 L
Closing Date
20 Jan 2026, 3:00 pmClosed
Project Director
DRDA Tiruchirappalli
Improvement of the Road From Sobanapuram to Osarapalli,Uppliyapuram Block at Tiruchirapalli District under (MGSMT) Savings Fund - 2025-26 scheme,pkg 01
2025_RDTN_634395_1
E1/3748/2025
Open Tender
Civil Works - Roads
180 days
Tiruchirappalli
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹2.7 L
DRDA Tiruchirappalli
14 Feb 2026
19 Dec 2025
20 Jan 2026
19 Dec 2025
20 Jan 2026
19 Dec 2025
25 Dec 2025
Improvement of the Road From Sobanapuram to Osarapalli KM 0/0-4/00 ( R - 34 PUR ) ,Uppliyapuram Block,Tiruchirappalli District under MGSMT - 2025-26 (Savings Fund) scheme. Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete. Km 0 / 0 - 3/820
Picking old metalled / BT surface upto 10cm thick as directed by the departmental officers Km 0 / 0 - 3/820
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out Km 0 / 0 - 3/820
Providing and laying including cost and conveyance of Gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content Km 0 / 0 - 1/00
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401 Km 3/00-3/820
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Km 0 / 0 - 3/820
Providing and laying of Prime Coat using Emulsion (SS1) at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.Km 0 / 0 - 3/820
Providing and laying Tack coat over WMM surface using 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.marea including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat Km 0 / 0 - 3/820
BM (Grade-II) 50mm Thick Using VG30 Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 Km 0 / 0 - 3/820
Above Basement BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 Km 0 / 0 - 3/820
Provision for HM Stones etc 0.15x0.15x0.9
Provision for Km Stones etc
CAUSEWAY,Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation.side wall
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundationFor Hard Bed
Cement concrete 1:4:8 mix using 40mm ISS HBG metal from approved quarry including cost and conveyance of all materials to work site and all labour charges etc.,
Cement concrete 1:2:4 mix using 20mm ISS HBG metal from approved quarry including cost and conveyance of all materials to work site and all labour charges etc.
Supplying and erecting CENTERING for sides and soffits including supports and strutting incl. all charges etc complete..HW-WO143
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
DRAINAGE,Earth work excavation in all classes of soils except hard rock requiring blasting soils such as hard stiff clay ordinary gravel etc., with intial lead and lift asper SS 20 B including shoring baling out water where necessary etc. complete for foundation.
Collection and supply of sand and filling in to the basement including cost and all labours charges etc complete
CC 1:4:8 mix using 40metal including cost and conveyance of all labours charges etc complete and conveyance of all materials to site and all labour charges etc complete -10 cum
CC 1:3:6 mix using 40 metal including cost and conveyance of all labours charges etc complete and conveyance of all materials to site and all labour charges etc complete -10 cum
Cost , supply and erection of steel centering for sides and soffits of all labours charges etc complete and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:4 mix to 20 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Providing of Metal Crash Barrier @ Ch 360 (25M) RS, Ch 1210(25M) LS,Metal Beam Crash Barrier Type - A, “W” Double Guard. Providing and erecting Single sided Double GuardMetal Beam Crash Barrier System 1.70m high,comprising of 3mm thick wall “W” beams postsand spacer channels shall be made by cold roll forming using HR conform to IS 5986 Fe 410/360 and dip galvanized having Zinc Mass of 550gms/ sqm, minimum 950mm above road/ ground level fixed on ISMC series channel vertical post 150x75x5mm spaced 2m center to center 312mm x 83mm flange width x 3mm thick, 4318mm long post directly embedded in the concrete (M15) pit size 350x350x800mm for a depth of 750mm below ground. All fixing bolts and nuts hot dip galvanized conforming to IS:1367 clause 4.60 all complete as per Technical Specification and as directed by the Engineer-in-charge SOR 25-26 PWD Pg no 333, HW-W0088 Ch 360 (25M) RS,
Ch 1210(25M) LS
Provision for 60cm Equilateral Triangle Cautionary Signboard
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.33 MB
TechBid1.pdf
Tender Documents • 0.80 MB
PriceBid1.pdf
Additional Documents • 0.30 MB
BOQ_759134.xls
BOQ • 0.24 MB