| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹15.4 L+₹40,727.11 (2.72%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | SUJITH S L2 | Pathanamthitta Engineering & Labour Contract Co-operative Society Ltd PT 316 L1 |
|---|---|---|---|---|---|
| 1.00 | 2.31
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and
saplings of girth up to 30 cm measured at a height of 1 m above ground level and
removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 3,000 | Sqm | 20 ₹60,000 | 18.19 ₹54,570 Lowest |
| 1.00 | 50.2.33.6
Cutting branches of trees overhanging above any structures of girth between 60cm to
90cm including stacking of serviceable materials and disposal of unserviceable
material, cost of labour, hire charges of rope and pully etc without making any
damages to nearby structures etc complete | 23 | Each | 675.98 ₹15,547.54 Lowest | 675.98 ₹15,547.54 Lowest |
| 1.00 | 50.2.33.7
Cutting branches of trees overhanging above any structures of girth between 90cm to
120cm including stacking of serviceable materials and disposal of unserviceable
material, cost of labour, hire charges of rope and pully etc without making any
damages to nearby structures etc complete. | 23 | Each | 919.09 ₹21,139.07 Lowest | 919.09 ₹21,139.07 Lowest |
| 2.00 | Fencing - Civil Work
2.6.1
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means
over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)
including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in-charge.All kinds of soil | 15.34 | Cum | 359.72 ₹5,517.75 Lowest | 359.72 ₹5,517.75 Lowest |
| 2.00 | OD376283/2025-2026
Providing and fixing of pre-fabricated bottom fixture 75x75x2mm wall thickness and length of 0.85m ISI make GP or GI Square pipe including all fabrication cost and conveyance etc. | 101 | Each | 1,285.01 ₹1,29,786.01 Lowest | 1,285.01 ₹1,29,786.01 Lowest |
| 2.00 | 4.1.3
Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse
sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm
nominal size derived from natural sources) | 15.34 | Cum | 9,235.97 ₹1,41,670.54 Lowest | 9,235.97 ₹1,41,670.54 Lowest |
| 2.00 | OD376281/2025-2026
Supplying and fixing bottom fixture bush(adopter for 75mm pipe into 50mmpipeacting as a insulator to energize the raiser pipe, made from virgin PP or equivalentmaterial and UV Stabilized, including all cost and conveyance etc. as per therecommendation of the engineer in charge | 101 | Each | 418.34 ₹42,252.34 Lowest | 418.34 ₹42,252.34 Lowest |
| 2.00 | OD376282/2025-2026
Providing and fixing 50*50*2mm ISI make GP or GI square pipe make of vertical
raiser length of 4.25m and horizontal post guard of length 0.60m including
galvanizing and fastener assembly and all cost of materials and labour charges etc. | 101 | Each | 3,647.9 ₹3,68,437.9 Lowest | 3,647.9 ₹3,68,437.9 Lowest |
| 2.01 | OD376284/2025-2026
Providing of factory fabricated T-angled intermediate posts suitable of making
electrically live with bottom insulator fixtures and holes as required. | 201 | Each | 1,186.5 ₹2,38,486.5 Lowest | 1,186.5 ₹2,38,486.5 Lowest |
| 2.01 | OD376286/2025-2026
Providing and fixing warning made from signs poly-ethylene plastic with statutory
colour and signs on proper intervals of the fence as per directions of the engineer in
charge. | 15 | Each | 97.93 ₹1,468.95 Lowest | 97.93 ₹1,468.95 Lowest |
Tender Value
₹17.6 L
EMD Value
₹44,100
Closing Date
12 Jun 2026, 5:00 pmClosed
Divisional Forest Officer, Thenmala
Divisional Forest Office, Thenmala
Construction of Hybrid Solar Power fence from Mangalamtheri- Karayalarthottam-1.5 Km in Kadamanpara Forest Station of Aryankavu Range during 2026-27
2026_FD_850531_2
KFDDO/166(B)/2026/DFOTML-C3
Open Tender
Electrical Works
Item Rate
60 days
Aryankavu Range
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,950
₹44,100
8 Oct 2026
5 Jun 2026
15 Jun 2026
5 Jun 2026
12 Jun 2026
5 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.001 | 2.31
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and
saplings of girth up to 30 cm measured at a height of 1 m above ground level and
removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | Sqm | 100 | - |
| 1.002 | 50.2.33.6
Cutting branches of trees overhanging above any structures of girth between 60cm to
90cm including stacking of serviceable materials and disposal of unserviceable
material, cost of labour, hire charges of rope and pully etc without making any
damages to nearby structures etc complete | - | Each | 100 | - |
| 1.003 | 50.2.33.7
Cutting branches of trees overhanging above any structures of girth between 90cm to
120cm including stacking of serviceable materials and disposal of unserviceable
material, cost of labour, hire charges of rope and pully etc without making any
damages to nearby structures etc complete. | - | Each | 100 | - |
| 2.001 | Fencing - Civil Work
2.6.1
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means
over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)
including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in-charge.All kinds of soil | - | Cum | 100 | - |
| 2.002 | OD376283/2025-2026
Providing and fixing of pre-fabricated bottom fixture 75x75x2mm wall thickness and length of 0.85m ISI make GP or GI Square pipe including all fabrication cost and conveyance etc. | - | Each | 100 | - |
| 2.003 | 4.1.3
Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse
sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm
nominal size derived from natural sources) | - | Cum | 100 | - |
| 2.004 | OD376281/2025-2026
Supplying and fixing bottom fixture bush(adopter for 75mm pipe into 50mmpipeacting as a insulator to energize the raiser pipe, made from virgin PP or equivalentmaterial and UV Stabilized, including all cost and conveyance etc. as per therecommendation of the engineer in charge | - | Each | 100 | - |
| 2.005 | OD376282/2025-2026
Providing and fixing 50*50*2mm ISI make GP or GI square pipe make of vertical
raiser length of 4.25m and horizontal post guard of length 0.60m including
galvanizing and fastener assembly and all cost of materials and labour charges etc. | - | Each | 100 | - |
| 2.006 | OD376284/2025-2026
Providing of factory fabricated T-angled intermediate posts suitable of making
electrically live with bottom insulator fixtures and holes as required. | - | Each | 100 | - |
| 2.007 | OD376286/2025-2026
Providing and fixing warning made from signs poly-ethylene plastic with statutory
colour and signs on proper intervals of the fence as per directions of the engineer in
charge. | - | Each | 100 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1443896.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_1443896.xls
BOQ • 0.25 MB
EPAYMENT.pdf
Tender Documents • 0.06 MB
DECLARATION.pdf
Tender Documents • 0.08 MB
PRELIMINARYAGREEMENT.pdf
Tender Documents • 0.83 MB
TENDERCONDITION.pdf
Tender Documents • 35.78 MB
POWEROFATTORNEY.pdf
Tender Documents • 0.12 MB
NIT2.pdf
Tender Documents • 0.87 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .