| 1 | L1₹6.1 LAccepted-AOC | ₹6.1 L | L1 | Accepted-AOC Lowest Negotiated Bidder |
| 2 | L2₹6.4 L+₹30,652.32 (5.00%)Rejected-Finance | ₹6.4 L+₹30,652.32 (5.00%) | L2 | Rejected-Finance Higher rate |
| 3 | L3₹6.9 L+₹80,916.74 (13.2%)Rejected-Finance | ₹6.9 L+₹80,916.74 (13.2%) | L3 | Rejected-Finance Higher rate |
Tender Value
₹6.1 L
EMD Value
₹15,323
Closing Date
13 Apr 2023, 5:00 pmClosed
Muneeswaran D
Assistant Executive Engineer, Dredger Sub Division Ernakulam (Irrigation) Civil station, 5th floor, Kakkanad- 682030
GENERAL-Kanakkankadavu RCB-Emergency lifting of collapsed shutter no.7 and Strengthening work of lock shutter and shutter no.5-RCB at kanakkankadavu-General Mechanical Work
2023_Irrig_570161_1
IRR/MH/TR/8198/2022_16_1_1/1
Open Tender
Repair and Maintenance Works
Item Rate
10 days
kanakkankadavu
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,355
Yes
₹15,323
Yes
13 Jun 2023
1 Apr 2023
19 Apr 2023
1 Apr 2023
13 Apr 2023
1 Apr 2023
1 Apr 2023 - 13 Apr 2023
Amount
Strengthening work of Lock shutter (for using instead of collapsed shutter No.7) and shutter No.5, correcting misalignment and lubrication.
OD22401/2022-2023: Lifting the collapsed shutter No.7, removing severely damaged portions using cutting set and accessories for smooth lifting , toeing the shutter by hooking with chain block, wire rope and crane placing and stacking the shutter at the nearby premises which is approximate 25 feet below the road level at river bank including the cost of all labour, machineries, tools, conveyance ,incidental charges etc complete.
OD22399/2022-2023:Taking out the lock shutter (already stacked at the river bank) covered by the thickly vegetation growth using crane & chain block after cleaning the debris and soil & removing the vegetation growth for inspecting the condition of the lock shutter whether it can be used instead of the collapsed shutter No.7 including the cost of materials ,machineries, tools, labour charges etc. complete
OD22400/2022-2023:Rectifying bent down portion of the lock shutter with the help of mobile crane and other accessories after proper cleaning, cutting removing the unwanted portion, including the cost of all materials , machineries labour charges, etc. complete
OD22047/2022-2023:Supply of MS plates for the patch work of Lock shutter (shutter no.7) and shutter no.5 including the cost of materials, conveyance etc. complete
OD23014/2022-2023:Patch work to the shutter no .5 and 7 including cost of materials and labour charges etc.complete
OD23071/2022-2023:Lifting the lock shutter from the river bank o the road level after carried out patch work using mobile crane and accessories including cost of materials ,,labour conveyance etc. complete
OD22564/2022-2023:Leading the lock shutter from the west side to the 7th shutter using mobile crane including cost of all materials ,machinery, labour charges etc. complete
OD22563/2022-2023:Removing the hoisting bridge and allied hoisting accessories for facilitating the erection of the lock shutter in the place of shutter No.7 and placing down on the RCB road with the help of 30T crane including cost of materials , machinery ,tools, labour, conveyance etc. complete
OD23066/2022-2023:Inserting the lock shutter in the groove of shutter no.7 by lifting it from the bridge road as per direction of departmental officers at site including cost of materials labour charges etc. complete
OD22562/2022-2023:Repositioning hoisting bridge of shutter No.7 and allied accessories such as motor unit worm reducers ,transmission system assembly ,gear wheels, pinion, shafts, Plummer blocks ,electro magnetic brake and manual operating mechanism etc by lifting it from the bridge road and placing on the platform ,cutting and enlarging holes for bolting and fixing ,positioning ,setting it as per the direction of departmental officer at site including cost of materials, machinery, labour charges , conveyance etc. complete
85.135:Conveying and Fixing wire rope already supplied to the new gates and Hoisting unit safely and conducting Trial Run
OD22040/2022-2023:Applying grease on the wheel assembly of the regulating shutters 5 & 7, including cost of Materials, labour, tools, conveyance etc, complete as per the directions of departmental officers at site. cost per Set/shutter
OD22053/2022-2023:Applying cardium compound after preheating to the wire rope of Shutter No.5 & 7 including cost of all materials, labour, machinery etc complete.
OD22583/2022-2023:Cleaning all the debris deposited in the shutter groove no 5 and 7 and including cost of all material, labour charges, tools etc. complete
OD22039/2022-2023:Correcting the misalignment of the shutter No.7 & 5 and its hoisting mechanisms including cost of all material , machinery, labour, conveyance etc. complete
OD22060/2022-2023:Providing hanging platform for the patch work & alignment setting of the lock shutter (for shutter no.7) and shutter No.5 etc including the cost of materials, tools, handling charges etc. complete (hanging platform for 1 time use)
OD25046/2022-2023:Conducting trial run including cost of materials, labour, hire charges etc complete
Brothers Engineering Contractors
ANILKUMAR K K
Bidder Name
ANILKUMAR K K
Brothers Engineering Contractors
Amity Projects & Construction
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_841647.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .