Tender Value
₹4.7 Cr
EMD Value
₹1 L
Closing Date
31 Aug 2026, 3:00 pm3d left
DCE , TC , KANNUR
REFER NIT
Construction of 33kV interlink line using Overhead covered conductor from 220kV AIS Ambalathara to 33kV AIS Belur to provide reliable supply to both 33kV Belur Rajapuram substations using Covered Conductor 120 Sqmm
2026_KSEB_863406_1
DCE/TC/KNR/03/2026-27 dtd. 30.07.2026
Open Tender
Electrical Works
Turn-key
180 days
kasaragod
Attached
5 documents required · 5 mandatory
₹8,850
₹1 L
ONLINE
31 Aug 2026
31 Jul 2026
3 Sept 2026
3 Aug 2026
31 Aug 2026
11 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Transporting lattice tower parts and connected accessories including loading and unloading charges etc as directed by Board staff to an average distance of 5 Km by lorry. | 62.65 | MT | - | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil | 350 | m3 | - | - |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. Ordinary rock | 75 | m3 | - | - |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width aswell as 10 sqm on plan) including getting out and disposal of excavatedearth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge - Hard rock | 75 | m4 | - | - |
| 5 | Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials. (Rate is over corresponding basic item for depth up to 1.5 metre).All kinds of soil | 126.35 | m3 | - | - |
| 6 | Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials. (Rate is over corresponding basic item for depth up to 1.5 metre).- ordinary/hard rock | 54.15 | m3 | - | - |
| 7 | Stub setting in lines and levels using template in concrete foundation for 14 m A,B,C type lattice towers,etc as per specification and as directed by the departmental staff at site. | 35 | set | - | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete | 1,122.8 | m2 | - | - |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) | 136.33 | m3 | - | - |
| 10 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 102.14 | m3 | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
Vol1GeneralandSpecialConditions.pdf
Tender Documents • 1.58 MB
Vol2Section2GTP.pdf
Tender Documents • 0.75 MB
BOQ_1460475.xls
BOQ • 0.42 MB
BOUNDENAGRMNT.pdf
Tender Documents • 1.58 MB
Bidsubmissiondateextended.pdf
PDF • 0.09 MB
Corrigendum.pdf
PDF • 0.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].