Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC NO 163 CHINNAMUTHU STREET E K VALASU ERODE 638011 | ERODE | ERODE | TAMIL NADU | 638011 | ₹1.4 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹1.5 CrRejected-AOC | ₹1.5 Cr | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | PRIDE CONSTRUCTIONS L1 | shanmathi constructions private limited L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling clearing away carefully the stacking material useful for reuse for any thickness of walls of brick or stone in clay walls etc.,Complete complying with standard specification and as directed by the departmental officer. | 100 | m3 | 280 ₹28,000 | 285 ₹28,500 |
| 2.00 | Dismantling clearing away carefully the stacking material useful for reuse for any thickness of RCC Concrete etc.,Complete complying with standard specification and as directed by the departmental officer. | 30 | m3 | 4,310 ₹1.3 L | 4,315 ₹1.3 L |
| 3.00 | Providing Reinforced cement concrete vertical cast in situ bored pile 300 mm dia of effective length of 3m using M20 design mix concrete and 20mm HBGS jelly metal ISS excluding cost of steel reinforcement, including providing of temporary casing pipe of minimum lenth of 1m at top for stablising the sides of bore holes for the remaining length concreting for this pile shall be done through trasit pipes and minimum cement content shall not be less than 400kg/m3.The reinforcement of the pile must be done up to top level of the pile cap,Excluding cost of the pile reinforcement.The cost includes mobilisation and demobilisation of pile equipment etc., with standard specification and as directed by the departmental officer. | 950 | Rm | 2,450 ₹23.3 L | 2,500 ₹23.8 L |
| 4.00 | Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officer. | 104 | m3 | 110 ₹11,440 | 120 ₹12,480 |
| 5.00 | Providing and laying M sand gravel mix (1:1) at the rate of 0.62 cu.m of filling sand and 0.66 cu .m of gravel to consolidated 1hide of 150mm designed to attain a CBR value of not less than 20 including cost and conveyance of sand gravel from approved sources to work site and stacking them to the departmental gauge for premeasurement including labour charges labour charges for power roller watering and all other tools and plants employed including all other incidental charges etc., complete (For road works)complying iwith standrard specification and as directed by the departmental officer | 54 | m3 | 1,500 ₹81,000 | 1,550 ₹83,700 |
| 6.00 | Cement Concrete 1:4:8 (One Cement, Four M sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 39 | m3 | 5,400 ₹2.1 L | 5,450 ₹2.1 L |
| 7.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 86 | m3 | 8,350 ₹7.2 L | 8,500 ₹7.3 L |
| 8.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) and as directed by the departmental officers | 152.15 | Qtl | 9,075 ₹13.8 L | 9,100 ₹13.8 L |
| 9.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete laid | 1,005 | m2 | 950 ₹9.5 L | 1,020 ₹10.3 L |
| 10.00 | Brick work in following Cement Mortar using best quality of country bricks of size 8-3/4" x 4-1/4" x 2-1/4" in C.M 1:5 for foundation and basement including curing, etc., complete complying with standard specifiction and as directed by the departmental officers | 560 | m3 | 6,200 ₹34.7 L | 6,220 ₹34.8 L |
Tender Value
₹1.5 Cr
EMD Value
₹81,000
Closing Date
30 Apr 2025, 11:00 amClosed
Joint Commissioner / Executive Officer
Office of the Joint Commissioner / Executive Officer, Arulmigu Mariamman Temple, Samayapuram
Construction of Compound wall in Formation of approach Road from Peruvala canal to Temple Parking area and 0 meter-300 meter retaining wall in Peruvala canal at Arulmigu Mariamman Temple, Samayapuram, Trichy District
2025_HRCE_543460_1
1652/1434/A4
Open Tender
Civil Works
183 days
Arulmigu Mariamman Temple, Samayapuram
Please refer Tender documents.
12 documents required · 12 mandatory
₹0
₹81,000
6 Jan 2026
11 Apr 2025
30 Apr 2025
11 Apr 2025
30 Apr 2025
23 Apr 2025
Amount
Dismantling clearing away carefully the stacking material useful for reuse for any thickness of walls of brick or stone in clay walls etc.,Complete complying with standard specification and as directed by the departmental officer.
Dismantling clearing away carefully the stacking material useful for reuse for any thickness of RCC Concrete etc.,Complete complying with standard specification and as directed by the departmental officer.
Providing Reinforced cement concrete vertical cast in situ bored pile 300 mm dia of effective length of 3m using M20 design mix concrete and 20mm HBGS jelly metal ISS excluding cost of steel reinforcement, including providing of temporary casing pipe of minimum lenth of 1m at top for stablising the sides of bore holes for the remaining length concreting for this pile shall be done through trasit pipes and minimum cement content shall not be less than 400kg/m3.The reinforcement of the pile must be done up to top level of the pile cap,Excluding cost of the pile reinforcement.The cost includes mobilisation and demobilisation of pile equipment etc., with standard specification and as directed by the departmental officer.
Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officer.
Providing and laying M sand gravel mix (1:1) at the rate of 0.62 cu.m of filling sand and 0.66 cu .m of gravel to consolidated 1hide of 150mm designed to attain a CBR value of not less than 20 including cost and conveyance of sand gravel from approved sources to work site and stacking them to the departmental gauge for premeasurement including labour charges labour charges for power roller watering and all other tools and plants employed including all other incidental charges etc., complete (For road works)complying iwith standrard specification and as directed by the departmental officer
Cement Concrete 1:4:8 (One Cement, Four M sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) and as directed by the departmental officers
Supplying and erecting steel centering including necessary supports for plane surfaces for Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete laid
Brick work in following Cement Mortar using best quality of country bricks of size 8-3/4" x 4-1/4" x 2-1/4" in C.M 1:5 for foundation and basement including curing, etc., complete complying with standard specifiction and as directed by the departmental officers
Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Painting two coats of newly plastered wall surface with ready mixed water based emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification and as directed by the departmental officers
Sub Total
shanmathi constructions private limited (BID ID -1326071)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_647907.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid