Tender Value
₹70.6 L
EMD Value
₹1.4 L
Closing Date
1 Oct 2026, 5:00 pm3d left
VICE CHAIRMAN GHAZIABAD DEVELOPMENT AUTHORITY
GDA OFFICE VIKAS PATH GHAZIABAD
CONSTRUCTION OF SHOPS AND COMMUNITY HALL AT GH-11 AND 12 IN KOYAL ENCLAVE SCHEME.
2026_GDAUP_1184494_1
688/4/PA-T/2026-27 Dt. 09.09.2026 (S.no-1)
Open Tender
Civil Works
Percentage
180 days
GHAZIABAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,779
AS PER LINK PROVIDED IN TENDER DOCUMENT
₹1.4 L
10 Sept 2026
10 Sept 2026
5 Oct 2026
11 Sept 2026
1 Oct 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. 2.6.1 All kinds of soil. DSR 2.6.1/2023 | 87 | cu.m | 139.31 | ₹12,119.97 |
| 2 | Dismantling RCC Work/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer -
in - charge. RCC Work DSR 15.3/2023 | 1.18 | cu.m | 2,788.98 | ₹3,291 |
| 3 | Providing and laying in position cement concrete 1:4:8 (1cement :4 coarse sand:08graded brick aggregated 40mm .nominal size.) excluding the cost of centering and shuttering - All work upto plinth level. DSR 4.17/2023 | 17 | cu.m | 5,346.47 | ₹90,889.99 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement -All work up to plinth level : .All works upto plinth level. 1 :1.5:3 (1 cement : 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) DSR 5.1.2/2023 | 15 | cu.m | 7,104.09 | ₹1,06,561.35 |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : .All works upto plinth level. 1 :1.5:3 (1 cement : 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) DSR 5.2.2/2023 | 24 | cu.m | 8,518.05 | ₹2,04,433.2 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands,plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1 :1.5:3 (1 cement: 1.5 coarse sand(zone-111) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). DSR 5.3/2023 | 65 | cu.m | 9,030.21 | ₹5,86,963.65 |
| 7 | Centering shuttering including strutting, propping etc. and removal of form work
FOUNDATION UP TO PLINTH. DSR 5.9.1/2023 | 24 | Sqm | 307.78 | ₹7,386.72 |
| 8 | COL SUPER STRUCTURE DSR 5.9.6/2023 | 192 | Sqm | 754.49 | ₹1,44,862.08 |
| 9 | Roof Beam DSR 5.9.5/2023 | 279 | Sqm | 577.97 | ₹1,61,253.63 |
| 10 | Slab DSR 5.9.3/2023 | 371 | Sqm | 728.22 | ₹2,70,169.62 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_2228361.xls
BOQ • 0.39 MB
688_1.pdf
Tender Documents • 1.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .