Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹18.1 LAccepted-AOC | ₹18.1 L | 1 | Accepted-AOC L1 |
| 2 | 2₹18.6 LRejected-AOC | ₹18.6 L | 2 | Rejected-AOC L2 |
| 3 | 3₹18.9 LRejected-AOC | ₹18.9 L | 3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | KK MOHAMMED SALIM L3 | MUHAMMED RIYAS M P L2 | SHABEER K.K. L1 |
|---|---|---|---|---|---|---|
| 1.00Maintanance | ||||||
| 1.00 | 55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) | 2.52 | cum | 2,400 ₹6,036 | 2,369.73 ₹5,959.87 | 2,308.98 ₹5,807.08 |
| 1.00 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | 45.1 | cum | 2,300 ₹1,03,727.7 | 2,291.47 ₹1,03,343.01 | 2,232.72 ₹1,00,693.44 |
| 1.00 | 55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface. | 2.52 | cum | 11,900 ₹29,928.5 | 11,675.04 ₹29,362.73 | 11,375.68 ₹28,609.84 |
| 1.00 | 55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | 45.1 | cum | 5,300 ₹2,39,024.7 | 5,187.55 ₹2,33,953.32 | 5,054.54 ₹2,27,954.7 |
| 1.00 | 2.5.2.A:Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately Bituminous course - By Mechanical Means | 67.2 | cum | 450 ₹30,240 | 485.56 ₹32,629.63 | 473.12 ₹31,793.66 |
| 1.01 | 4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 67.2 | cum | 3,300 ₹2,21,760 | 3,287.15 ₹2,20,896.48 | 3,202.87 ₹2,15,232.86 |
| 1.01 | 5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means. | 560 | sqm | 66.38 ₹37,172.8 | 64.72 ₹36,243.2 | 63.06 ₹35,313.6 |
| 1.01 | 5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 5,218 | sqm | 12.58 ₹65,642.44 | 12.26 ₹63,972.68 | 11.95 ₹62,355.1 |
| 1.01 | 5.7.1:Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type-A) aggregates using viscosity grade bitumen ( VG - 30) to the required line, grade, and level to serve as wearing course on a previously prepared base, including mixing in a suitable HMP of appropriate capacity not less than 75 tonnes/hour., laying and rolling with a Smooth wheeled roller 8-10 tonne capacity, and finishing to the required level and grade. | 5,218 | sqm | 216.97 ₹11,32,149.46 | 211.55 ₹11,03,867.9 | 206.12 ₹10,75,534.16 |
Tender Value
₹19.0 L
EMD Value
₹47,621
Closing Date
4 Jun 2026, 11:00 amClosed
EXECUTIVE ENGINEER
PWD NH DIVISION MALAPPURAM
GENERAL-Repair of NH 966 (18/056 - 40/000)-Surface Damage Repair of NH 966 from km 18/056 to km 40/000 (excluding km 27/450 to 29/200)-General Civil Work
2026_PWD_852992_1
PWD/NH/TR/4842/2026_5_1_1/1
Open Tender
Civil Works - Highways
180 days
kondotty
Please refer tender documents
9 documents required · 9 mandatory
₹2,760
Yes
₹47,621
Yes
25 Jun 2026
26 May 2026
6 Jun 2026
26 May 2026
4 Jun 2026
26 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Maintanance | |||||
| 1.001 | 55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) | - | cum | - | - |
| 1.002 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | 1 | cum | - | - |
| 1.003 | 55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface. | - | cum | - | - |
| 1.004 | 55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | 1 | cum | - | - |
| 1.005 | 2.5.2.A:Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately Bituminous course - By Mechanical Means | - | cum | - | - |
| 1.006 | 4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | - | cum | - | - |
| 1.007 | 5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means. | - | sqm | - | - |
| 1.008 | 5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | - | sqm | - | - |
| 1.009 | 5.7.1:Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type-A) aggregates using viscosity grade bitumen ( VG - 30) to the required line, grade, and level to serve as wearing course on a previously prepared base, including mixing in a suitable HMP of appropriate capacity not less than 75 tonnes/hour., laying and rolling with a Smooth wheeled roller 8-10 tonne capacity, and finishing to the required level and grade. | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1441407.xls
BOQ • 0.30 MB
viewnit1840.pdf
Tender Documents • 0.03 MB
viewSBD1840.pdf
Tender Documents • 1.64 MB
Download all tender documents and submit your bid