| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 LAccepted-AOC BHU | L1 | Accepted-AOC PLEASE SEE SUMMARY | |
| 2 | L2₹7.1 L+₹71,500.86 (11.3%)Rejected-AOC NAGAR ATHANI P O MULAMGUNNATHUKAVU THRISSUR 680581 | THRISSUR | THRISSUR | KERALA | 680581 | L2 | Rejected-AOC PLEASE SEE SUMMAEY |
Tender Value
₹5.6 L
EMD Value
₹14,020
Closing Date
11 Dec 2023, 4:00 pmClosed
DGM (Projects)
Travancore Titanium Products Ltd, P.B.No.1, Kochuveli P.O, Trivandrum- 21
Construction of Sump system and associated drain works at TiO2 Plant- White end
2023_TTPL_617987_1
PROJ/Sump and Drain/ TDP-White end/IT-09/23-24
Open Tender
Civil Works - Others
Item Rate
90 days
Travancore Titanium Products Ltd, Trivandrum- 21
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,357
Yes
₹14,020
Yes
10 Jul 2024
2 Nov 2023
12 Dec 2023
2 Nov 2023
11 Dec 2023
2 Nov 2023
2 Nov 2023 - 11 Dec 2023
Amount
Laying and Jointing PVC Pipe. Heading
White end sump and drain
Clearing the site by removing the debris, sludge etc and conveying it to the dump yard complete as per the direction of the Engineer in chargeClearing the site by removing the debris, sludge etc and conveying it to the dump yard complete as per the direction of the Engineer in charge
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Providing and laying up to floor five level reinforced cement concrete in kerbs, steps and the like excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) : 3 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
Cleaning the surface, thoroughly melting and applying corromastic so as to provide a continuous lining and heating the joints with blow lamps before applying corromastic to next section so as to form a monolithic joint and finishing the surface to the required line and level including applying SPL solution etc. as in the standard practice in the company and as per the direction of Engineer in charge. Only corromastic and Diesel will be supplied by TTPL.
Labour charges for AR tile/ AR brick work with swk powder and K solution in the existing practice of the company including charges for conveying required tiles from store yard, paving tiles to line and level, cleaning all surface etc. as directed by the Engineer in charge. Only AR tiles, Swk powder, K I solution and Diesel will be supplied by TTPL.
Sump System
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
Cleaning the surface, thoroughly melting and applying corromastic so as to provide a continuous lining and heating the joints with blow lamps before applying corromastic to next section so as to form a monolithic joint and finishing the surface to the required line and level including applying SPL solution etc.as in the standard practice in the company and as per the direction of Engineer in charge. Only corromastic and Diesel will be supplied by TTPL.
Labour charges for AR tile/ AR brick work with swk powder and K solution in the existing practice of the company including charges for conveying required tiles from store yard, paving tiles to line and level, cleaning all surface etc. as directed by the Engineer in charge. Only AR tiles, Swk powder, K I solution and Diesel will be supplied by TTPL.
External development
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Labor charges for Solid block masonry using pre cast solid blocks ( factory made) of size 40x20x15 cm or nearest available size confirming to IS 2185 part 1 of 1979 for foundation and plinth with thickness 20 cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete as per the direction of the Engineer in charge. Only solid block will be supplied by TTPL.
12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Labour charges for painting with rubber based paint (lighty grey) over steel structurals such as columns, beams, roof trusses, purlin, louvers, brazing, connected platforms, hand rails, staircases, walkways, pipelines, cable trays, steel doors , windows, gates, cover plates, tanks, ducts, scrubber stack, chimneys and equipment supports including charges for all tools, scaffolding etc complete as per the direction of the Engineer in charge. Only required quantity of paint will be supplied by TTPL.
Labour charges for painting with rubber based paint (dark grey) over steel structurals such as columns, beams, roof trusses, purlin, louvers, brazing, connected platforms, hand rails, staircases, walkways, pipelines, cable trays, steel doors , windows, gates, cover plates, tanks, ducts, scrubber stack, chimneys and equipment supports including charges for all tools, scaffolding etc complete as per the direction of the Engineer in charge. Only required quantity of paint will be supplied by TTPL.
Labor charges for fixing Non asbestos cement sheet/FRP Sheet on roof and side cladding with GI bolts and nuts, grease washer, rubber cap, roofing compound etc. up to a height of 25m including cost of all labors ,hire of tools, conveying, cutting the sheet into suitable size if necessary, charges for scaffolding etc. complete as per the direction of officer in charge. Only Non-asbestos Cement sheet and fixing clamp will be supplied by TTPL.
steel industrials kerala ltd
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .