Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹20.3 L+₹41,908.48 (2.11%)Admitted-Fee/PreQual/Technical/Finance KOLLAYIL KERALA | IDUKKI | KERALA | 685533 | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹20.4 L+₹51,788.18 (2.61%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹20.4 L+₹55,346.50 (2.79%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | |
| 5 | L5₹20.6 L+₹78,789.24 (3.97%)Admitted-Fee/PreQual/Technical/Finance KARITHALAKKAL PUTHEN VEEDU ELAVANKKARA VELIYAMCODE PO TRIVANDRUM | TRIVANDRUM | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | PRADEEP L2 | RADHAKRISHNAN R L6 | RAVI S L1 | SURESH KUMAR P L5 | SAJIN R L4 | CITIZENS LABOUR FORCES DEVELOPMENT CO-OPERATIVE SICIETY Ltd No T-2185 L7 | RAMAKRISHNA PILLAI SATHEESHLAL L3 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Maintenance Works in Director's Quarter | ||||||||||
| 1.00 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 4.08 | cum | 2,242.07 ₹9,147.65 | 2,286.67 ₹9,329.61 | 2,182 ₹8,902.56 | 2,286.67 ₹9,329.61 | 2,260.69 ₹9,223.62 | 250 ₹1,020 | 50 ₹204 Lowest |
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 2.4 | cum | 1,878.75 ₹4,509 | 1,915.91 ₹4,598.18 | 1,828 ₹4,387.2 | 1,915.91 ₹4,598.18 | 1,894.14 ₹4,545.94 | 300 ₹720 | 50 ₹120 Lowest |
| 1.00 | 15.19:Dismantling steel work manually / by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per directions of Engineer -in-Charge. | 300 | kg | 3.45 ₹1,035 | 3.59 ₹1,077 | 3.36 ₹1,008 | 3.59 ₹1,077 | 3.55 ₹1,065 | 100 ₹30,000 | 0.5 ₹150 Lowest |
| 1.00 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 2.81 | cum | 2,219.64 ₹6,237.19 | 2,264.12 ₹6,362.18 | 2,160 ₹6,069.6 | 2,264.12 ₹6,362.18 | 2,238.39 ₹6,289.88 | 2,800 ₹7,868 | 100 ₹281 Lowest |
| 1.00 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.34 | cum | 11,267.33 ₹26,410.62 | 11,489.29 ₹26,930.9 | 10,967 ₹25,706.65 | 11,489.29 ₹26,930.9 | 11,358.73 ₹26,624.86 | 9,500 ₹22,268 | 8,800 ₹20,627.2 Lowest |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 37.5 | sqm | 888.89 ₹33,333.38 | 907.24 ₹34,021.5 | 865 ₹32,437.5 | 907.24 ₹34,021.5 | 896.94 ₹33,635.25 | 900 ₹33,750 | 500 ₹18,750 Lowest |
| 1.01 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 351.6 | kg | 98.38 ₹34,590.41 | 101.13 ₹35,557.31 | 95 ₹33,402 Lowest | 101.13 ₹35,557.31 | 99.98 ₹35,152.97 | 105 ₹36,918 | 95 ₹33,402 Lowest |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.77 | cum | 9,252.22 ₹7,077.95 | 9,435.24 ₹7,217.96 | 9,005 ₹6,888.83 | 9,435.24 ₹7,217.96 | 9,328.02 ₹7,135.94 | 9,800 ₹7,497 | 8,500 ₹6,502.5 Lowest |
| 1.01 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 2.76 | sqm | 740.45 ₹2,043.64 | 755.27 ₹2,084.55 | 720 ₹1,987.2 | 755.27 ₹2,084.55 | 746.69 ₹2,060.86 | 920 ₹2,539.2 | 500 ₹1,380 Lowest |
Tender Value
₹23.4 L
EMD Value
₹50,000
Closing Date
4 Jul 2026, 5:00 pmClosed
Executive Engineer
PWD Buildings Division Thiruvananthapuram
Deposit Museum and Zoo Department Quarters of Director Repair of quarters allocated for Director Museum and Zoos-Civil work
2026_PWD_857527_1
TR/9451/2025_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
180 days
Thiruvananthapuram
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
8 Jul 2026
24 Jun 2026
8 Jul 2026
24 Jun 2026
4 Jul 2026
24 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Maintenance Works in Director's Quarter | |||||
| 1.001 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | - | cum | - | - |
| 1.002 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 1 | cum | - | - |
| 1.003 | 15.19:Dismantling steel work manually / by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per directions of Engineer -in-Charge. | - | kg | - | - |
| 1.004 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | - | cum | - | - |
| 1.005 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.006 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | - | sqm | - | - |
| 1.007 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | - | kg | - | - |
| 1.008 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.009 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 1 | sqm | - | - |
stage.html
html • 0.03 MB
finance_1449612.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1449612.xls
BOQ • 0.36 MB
TenderDocuments.pdf
Tender Documents • 1.13 MB
viewsbd.pdf
Tender Documents • 1.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .