| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 CrAccepted-AOC | ₹4.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹4.9 Cr+₹38.1 L (8.50%)Rejected-Finance 254 DOON VIHAR JAKHAN RAJPUR ROAD DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | ₹4.9 Cr+₹38.1 L (8.50%) | L2 | Rejected-Finance Disqualified |
| 3 | L3₹5.5 Cr+₹1.0 Cr (22.5%)Rejected-Finance 379 MOHIT NAGAR DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | ₹5.5 Cr+₹1.0 Cr (22.5%) | L3 | Rejected-Finance Disqualified |
| 4 | Rejected-Technical | - | - | Rejected-Technical Disqualified |
| 5 | Rejected-Technical | - | - | Rejected-Technical Disqualified |
Tender Value
₹4.2 Cr
EMD Value
₹8.4 L
Closing Date
6 Mar 2024, 5:00 pmClosed
Superintending Engineer
Office of Superintending Engineer Construction Circle UKPJN Dehradun
Confirmatory Survey Design Construction and laying of sewer line connection to existing sewerage network testing and commissioning for Chaman Vihar Phase II and adjoining area area in Dehradun
2024_MDPEY_70177_1
Letter No 915/NIVIDA/19 dated 22-02-2024
Open Tender
Civil Works
Item Rate
365 days
Dehradun
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Executive Engineer Dehradun Division UKPJN
₹8.4 L
Dehradun
17 Jun 2025
22 Feb 2024
7 Mar 2024
22 Feb 2024
6 Mar 2024
29 Feb 2024
27 Feb 2024
Amount
Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge
Bituminous road
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in - charge.
Nominal concrete 1:3:6 or leaner mix ( including equivalent design mix )
Taking out existing CC interlocking paver block from footpath / central verge , including removal of rubbish etc.disposal of unserviceable material to the dumping ground for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of engineer in charge.
Excavation of earth depth upto 1.5 mt. Below G.L. for laying of sewer manholes, Gully pits, Chambers, sumps etc. in ordinary soil(earth,sand loam and clay) joints, pits, trimming, dressing, levelling refilling of trenchesincluding cutting of in 20 cm layers,watering and ramming the same including removal of surplus earth or other dismantled material up to a distance of 50 meters from the center of trenches.Excavation in soil mixed with morum,shingle,kankar requaring use of specials T&P.
Depth from 0.0 upto 1.5 m
Depth from 1.5 upto 3.0 m
Depth from 3.0 upto 4.5 m
Depth from 4.50 upto 6.0 m
Provision for barricading in two rows and necessary diversion of paths and where as necessary with the help of bellies, ropes, flags, signals and light signals etc. as per requirement including supply of all material T&P etc complete.
Providing and fix open timbering covering 1/3 surface area by planks in trenches upto required depth. Below ground level consisting, of 40mm - 50mm thick approved country wood planks for poling board 125mm *75mm India Salwood walers and 100mm dia Sal bailies for struts at 1.50m c/c including removal after laying of sewar (both sides of trenches will be taken as one side for the purpose of payments & measurements i.e. face area timbered equals to length x depth of trench). Dismantled timbering materials will be the property of the contractor.
0.00 to 3.00 mBGL
Provide & fixing of Close Timbering in trenches for the following depths below ground level consisting of 40mm thick approved country wood planks for poling board, 125mm × 75mm Indian Salwood walers and 100 mm dia Sal wood ballies for struts at 1.50m interval including removal after laying of sewer(both sides of trenches will be taken as one side for the purpose of payments & measurements i.e. area equals to length x depth of trenches. Dismantled timbering materials will be the property of the contractor.
Depth upto 3 m below G.L
3 m to 6m below G.L
Providing granular bedding with cerefully compacted backfill at all level using graded hard crusher broken stone100% passing through 20mm sieve , 20-50% passing through 10mm sieve and 100% retained on 6mm sieve, laying in layers of not more then 15 cm thick including ramming, watering, compaction etc. complete for pipe bedding and surrounding as per drawing and as directed by the Engineer-in-Charge. Width of bedding ( Outer diameter of pipe + 500mm )
Providing plain cement concrete bedding with 1:2:4 (M-15 grade ) with carefully compacted backfill using 20mm and down hard crusher broken stone laying in layers of not more than 15 cm thick including shuttering, compaction, curing, etc., complete for PCC bedding and surrounding as per drawing and as directed by the Engineer-in-Charge. Width of bedding ( Outer diameter of pipe + 200mm or 1.25 times of outer diameter , whichever is more )
Supply laying and jointing of following dia. R.C.C. NP-3 class (with spigot & Socket (S/S) ends) as per IS: 458-2003 {Amended up to date) with Rubber gaskets at site of work, lowering the same into trenches in depths up to required depth below ground level true to alignment as per drawings and jointing with 1:1 cement mortar in coarse sand including cost of all jointing materials, testing etc. complete as per specifications and as directed by the Engineer-in-Charge.( Pipes of dia 300mm and above have to be NP-3 reinforced made by vertical vibrated casting process with S/S ends conforming to IS 458 : 2003.
200 mm dia
200 mm dia
250 mm dia
200 mm dia
250 mm dia
300 mm dia
350 mm dia
200 mm dia
Constructing Brick Masonry Manhole of various dia and depth as per IS :4111 par1( latest ammendment) in FPS brick class designation M-100 in Cement Mortar 1:5 (1 cement : 5 coarse sand) including nside and outside 15mm thick plastering in cement mortar 1:3(1 cement : 3 coarse sand) finished with a floating coat of neat cement inside only. The work includes excavation, dewatering, planking, strutting etc. refilling, disposal of surplus earth with all lift and lead of 50m, Including construction of concrete base with PCC 1:4:8 (1 cement : 1 coarse sand : 4 stone aggregate 40mm nominal size), preparation of channal up to the height of'the'pipe and benching in PCC 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 20mm nominal size) including neat cement finished, suitable connection of inlet & outlet pipes, testing (watertightness} of manhole, curing etc. complete as per specification and drawing and as per entire satisfaction of Engineer-in-Charge (the depth of manhole will be measured from the invert of the pipe to top of the manhole cover).
900mm internal diameter at bottom,0.90-1.65m depths
1200 mm internal diameter at bottom ,1.65-2.30m depths
1500 mm internal diameter at bottom ,2.30m-4.95 m depths
Constructing Brick Masonry sewer connecting chamber (SCC) of various sizes and depth as per drawing in FPS brick class designation M-100 in.,Cement Mortar 1:5 (1 cement : 5 coarse sand) including inside and outside 15mm thick plastering in cement mortar 1:3 (1 cement : 3 coarse sand)finished with a floating with a neat cement inside only. The work includes excavation, dewatering, planking, strutting etc, refilling, disposal of surplus earth with all lift and lead of 50m, Including construction of concrete base with PCC 1:4:8 (1 cement : 4 coarse sand : 8 stone aggregate 40mm nominal size), preparation of channal up to the height of the pipe and benching in PCC 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 20mm nominal size including neat cement finished, suitable connection of inlet & outlet pipes, testing water tightness of manhole, curing etc. complete as per specification and drawing and as per entire satisfaction ol Engineer-in-Charge (the depth of manhole will be measured from the invert of the pipe to top of the manhole cover).
600mm x 600mm x 1.50m depth
Cartage of excavated earth from site to suitable place as per direction of engineer in charge by head load (the work being in narrow lanes) and carrying back for filling of trenchesafter laying and jointing the pipes up.to max distance 60 m one side
Repairing/Shifting of domestic water supply house connection coming in the alignment of sewer line/mahnole chamber including excavation, refilling, supply of all material, pipes, specials etc., labour, T&P and making good complete as per entire satisfaction of engineer in charge.
15 to 20 mm GI Pipe
Brick work with FPS bricks of class designation M-100 in cement morter 1:5 including supply of all material labour, T&P etc. complete in all respect.
Repairing of leakage in existing pipe line including Excavation in ordianry soil mixed with shingle boulders etc. for repair of leakage in existing pipe line including supply and fixing of necessary specials, fixingof C.I.D/ joints.
Provision for crossing sewers through existing drains coming across the alignment of sewer including making it good after laying the pipe.
Provision for making of connection of proposed sewer to existing sewer including making of holes in the walls and repairing the same with the new brick work as may be required for proper complete connection including clearing of existing sewer manhole.
Dewatering of due to sepage of ground water by well point system by making all arrangements including supply of all material, labour, T&P, pumps etc. required and disposal of sub soil water at near by nala complete. Dewatering shall be done as per IS 9759-1981 (upto date ammendement).
Disposal of surplus earth from the site of work upto a distance of 8.0 km. As directed by Engineer incharge including loading unloading and carting etc. all complete.
Providing and Spreading RBM i.e.,River Bed Material (treated /surface course material )in uniform layer with motor grader on prepared surace with rotavator and compacting with smooth wheeled roller to achieve the desired density.
WBM Grading 2 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405.
WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.
Bituminous Macadam (Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction) for GradingII (19 mm nominal size)
Semi - Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification complete in all respects) for GradingII (10 mm nominal size)
Cement Concrete Pavement Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 Cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
Interlocking Concrete Block Pavement , Providing and Laying of Interlocking Concrete Block Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504
Laying old interlocking concrete block pavement having thickness 80 mm as per drawing and technical specification clause 1504
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering
1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size)
1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size)
Cleaning of Manhole Chamber Depth upto 4.50m.
Deduction in the depth of the manhole to regulate payments for variation of actual depth of manholes in following sizes.
900mm dia ,0.90-1.65m depths
1200 mm dia ,1.65-2.30m depths
1500 mm dia,2.30m-4.95 mm depths
Deduction in the depth of the sewer connecting chamber (SCC) to regulate payments for variation of actual depth of manholes in following sizes.
600mm x 600mm x 1.50m depth
M.R.ENGINEERS AND CONTRACTORS
Ms Ankita Construction
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .