| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 LAccepted-AOC NO DETAILS FOUND | L1 | Accepted-AOC agreeement executed | |
| 2 | L2₹10.6 L+₹13,956.76 (1.33%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical L4 | |
| 4 | Rejected-Technical | - | Rejected-Technical L6 | |
| 5 | Rejected-Technical KANNIPPARRA HOUSE BEEMBUNGAL HOUSE MAMPAD P O MALAPPURAM 676542 | MAMPAD | MALAPPURAM | KERALA | 676542 | - | Rejected-Technical L3 |
Tender Value
₹14.0 L
EMD Value
₹34,889
Closing Date
14 Jul 2022, 6:55 pmClosed
Assistant Engineer ,LSGD Section(LID EW)Mampad GP
Assistant Engineer ,LSGD Section(LID EW)Mampad GP
Annual Plan-06/22-23 MAMPAD GP-BUDS SCHOOL BUILDING CONSTRUCTION General Civil Work
2022_LSGD_498419_3
TN-01/AE/LSGD/2022-23
Open Tender
Civil Works - Buildings
Item Rate
360 days
MAMPAD
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹34,889
Yes
29 Sept 2023
7 Jul 2022
16 Jul 2022
7 Jul 2022
14 Jul 2022
7 Jul 2022
7 Jul 2022 - 14 Jul 2022
Amount
buds school construction
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15<sup>0</sup> landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
NIYAS BABU K
SADIQ KALAL K
JAS Engineering & Construction
SAHEEM V T
mohammed razin vp
Bidder Name
FASIL K.P.
NIYAS BABU K
SADIQ KALAL K
mohammed razin vp
JAS Engineering & Construction
SAHEEM V T
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_714628.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .