Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.4 LAccepted-AOC | 1 | Accepted-AOC Lowest Bidder | |
| 2 | 2₹5.6 L+₹21,843 (4.03%)Rejected-Finance | 2 | Rejected-Finance L1 accepted | |
| 3 | 3₹6.6 L+₹1.2 L (22.4%)Rejected-Finance | 3 | Rejected-Finance L1 accepted |
Tender Value
₹5.7 L
EMD Value
₹14,300
Closing Date
10 Mar 2020, 5:00 pmClosed
REGISTRAR
Administrative Office Cochin University of Science and Technology Kochi - 682022
Urgent Construction of RCC drain along collapsed compound wall at East end boundary of CUSAT Campus (near old pond)
2020_CUSAT_347537_1
CUSAT/ET/UEU/3594/19-20
Open Tender
Civil Works - Others
Item Wise
60 days
Thrikkakara Campus
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,150
Yes
online
₹14,300
Yes
30 Mar 2021
3 Mar 2020
16 Mar 2020
3 Mar 2020
10 Mar 2020
3 Mar 2020
Amount
Engaging man coolie for cleaning the premises, clearing the debris from the work site etc.
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone Aggregate 40 nominal size)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo - Mechanically Treated bars of grade Fe-500D or more
12 mm cement plaster of mix: 1:6 (1 cement : 6 fine sand).
S R CONSTRUCTION
AMEER ALI N.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_487077.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .