Tender Value
₹59.7 L
EMD Value
₹1.2 L
Closing Date
5 Jun 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Deposit Work
Above/Below/Par
TRD
14 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V or V/N crore, whichever is less; were V= Advertised value of the tender in crore of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet
Similar nature work: Tenderer should have experience on "Execution of any 1500V DC or 25kV AC OHE work." (Authority: GM/Elect/WR/CCG's letter No. EL/90/TRD/W/1 dated 21.01.2009)
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender.
10 conditions · 8 needing a document upload
Please submit your bank details i.e. Name of the Bank along with Bank Branch Code, Account Number, IFSC Code, PAN Number, Mobile Number and e-mail address
At the time of submission of bid, if you have any special Condition then upload in scanned pdf copy.
Please furnish list of personal, organization available on hand and proposed to be engaged for the subject work.
Please furnish list of plant and Machinery available on hand own and proposed to be inducted own and hired to be given separately for the subject work.
Please furnish list of Works completed in last Seven years (Ending last day of month previous to the one in which tender is invited) giving Description of Work, Organization for whom executed, approximate value of contract at time of award, Date of award and Date of Completion. Date of actual Start, Actual Completion and Final value of Contract shall also be given.
Please furnish list of works on hand indicating description of works, contract value, Approximate value of balance work yet to be done and date of award.
Tenderer should submit valid electrical contractor license issued by electrical inspector to state government with the offer. If electrical contractor license has been expired, tenderer should submit receipt of renewal electrical contractor license issued by electrical inspector to state government with offer also. At the time of contract agreement, contractor must submit valid electrical contractor license issued by electrical inspector to state government. If tenderer have not submit the valid electrical contractor license, the offer will be summarily rejected.
The tenderer whether sole proprietor/ a company or a partnership firm / joint venture (JV) / registered society / registered trust/HUF/ LLP etc. if they want to act through agent or individual partner(s), should submit along with the tender, a copy of power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person specifically authorizing him/them to sign the tender, submit the tender, and further to deal with the Tender/Contract up to the stage of signing the agreement except in case where such specific person is authorized for above purposes through a provision made in the partnership deed/ Memorandum of understanding/ Article of Association/ Board resolution, failing which tender shall be summarily rejected.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tenderer must have valid Electrical contractors license in their own name or firms name, issued from state authorities for the purpose, attested copies should be submitted with the tender. For participating in tenders for a work in any state the Contractors shall have to possess electrical license of appropriate voltage issued by any State Govt. under Clause 45 of compilation of rule of Indian Electricity Rules 1956 or as amended from time to time and a copy of the same should be submitted along with the offer. They shall keep valid license throughout the period of execution of work by getting it renewed at suitable intervals and submit an attested copy of the same to the Railways after each renewal. In the event of any discontinuity in validity of electrical license of the contractor, its authority to work with Railways will also automatically cease to be valid. If the tenderers do not submit any proof for meeting with the eligibility criteria as laid downin the NIT and tender conditions, the offer will be considered as incomplete and will besummarily rejected
OHE modification work in connection with Shifting of point nos. 150, 151 and 152 at GSECL siding, sikka and OHE modification work in connection with regirdering at Br.- 427 of Rajkot division.
DRM-RJT-EL-TRD-26-27-03R1
DRM-RJT-EL-TRD-26-27-03R1
Open
Works - General
4 Months
Rajkot, Gujarat
₹0
₹1.2 L
5 Jun 2026
14 May 2026
22 May 2026
128 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 43,91,155.95 | ||
| — | 2.00 | — | — | ||
| Survey, Design and preparation of layout plan and SED as per technical specifications | — | — | — | 42,275 | |
| — | 36.00 | — | — | ||
| Preparation of TSWR diagram Board along with caption diagram as per explanatory notes | — | — | — | 11,287.08 | |
| — | 12.00 | — | — | ||
| Supply of fabricated galvanised steel structure and SPS as per technical specifications | — | — | — | 17,31,782.88 | |
| — | 12.00 | — | — | ||
| Erection of fabricated galvanised steel structure and SPS as per explanatory notes | — | — | — | 1,33,179.84 | |
| — | 12.00 | — | — | ||
| Power block charges on erection of fabricated galvanised steel structure and SPS | — | — | — | 39,954 | |
| — | 80.00 | — | — | ||
| Concrete for foundation and plinth in all types of soil incl. hard/rocky soil (incl. excavation and supply of materials viz. cement, sand and ballast) | — | — | — | 6,07,441.6 | |
| — | 15.00 | — | — | ||
| Supply of cantilever/Bracket assembly complete with insulator as per technical specification | — | — | — | 4,06,683.9 | |
| — | 15.00 | — | — | ||
| Erection of cantilever/Bracket assembly complete with insulator as per explanatory notes | — | — | — | 41,039.85 | |
| — | 15.00 | — | — | ||
| Power block charges on Erection of cantilever/Bracket assembly complete with insulator | — | — | — | 12,312 | |
| — | 3.00 | — | — | ||
| Supply of regulating equipment 3 pulley type complete with all accessories as per technical specifications | — | — | — | 1,91,506.14 | |
| — | 3.00 | — | — | ||
| Erection of regulating equipment 3 pulley type complete with all accessories as per technical specifications | — | — | — | 34,112.97 | |
| — | 3.00 | — | — | ||
| Power block charges on erection of regulating equipment 3 pulley type complete with all accessories | — | — | — | 10,233.9 | |
| — | 3.00 | — | — | ||
| Splicing and extension of anchored OHE as per technical specification and explanatory notes | — | — | — | 24,804.03 | |
| — | 20.00 | — | — | ||
| Supply of new droppers complete with clips etc. for the new span | — | — | — | 1,00,529.8 | |
| — | 15.00 | — | — | ||
| Transfer of OHE and adjustment of dropper for the new span as per explanatory notes. | — | — | — | 1,07,971.95 | |
| — | 15.00 | — | — | ||
| Power block charges on Transfer of OHE and adjustment of dropper | — | — | — | 32,391.6 | |
| — | 2.00 | — | — | ||
| Supply of section insulator assembly including core and cut in insulator as per technical specifications | — | — | — | 1,20,874.52 | |
| — | 2.00 | — | — | ||
| Erection of section insulator assembly including core and cut in insulator as per explanatory notes | — | — | — | 14,472.72 | |
| — | 2.00 | — | — | ||
| Power block charges on erection of Section insulator assembly | — | — | — | 4,341.82 | |
| — | 3.00 | — | — | ||
| Supply of material for termination of Double conductor (including supply of 9 ton cut in insulator) as per technical specifications | — | — | — | 41,793.87 | |
| — | 3.00 | — | — | ||
| Erection of material for termination of Double conductor (including supply of 9 ton cut in insulator) as per explanatory notes | — | — | — | 6,095.52 | |
| — | 3.00 | — | — | ||
| Power block charges on Erection of material for termination of Double conductor (including supply of 9 ton cut in insulator) as per explanatory notes | — | — | — | 1,828.68 | |
| — | 3.00 | — | — | ||
| Supply of Guy Rod assembly complete as per technical specification for high rise OHE | — | — | — | 33,421.65 | |
| — | 3.00 | — | — | ||
| Erection of Guy Rod assembly complete as per explanatory notes for high rise OHE | — | — | — | 6,117.78 | |
| — | 3.00 | — | — | ||
| Power block charges on Erection of Guy Rod assembly complete as per explanatory notes for high rise OHE | — | — | — | 1,835.34 | |
| — | 5.00 | — | — | ||
| Supply of 9 tonne cut in insulator as per technical spec. | — | — | — | 44,604.05 | |
| — | 5.00 | — | — | ||
| Erection of 9 tonne cut in insulator as per explanatory notes. | — | — | — | 6,149.3 | |
| — | 5.00 | — | — | ||
| Power block charges on Erection of 9 tonne cut in insulator as per explanatory notes | — | — | — | 1,844.8 | |
| — | 15.00 | — | — | ||
| Supply of 160 sq mm jumpers with fittings as per technical specifications | — | — | — | 38,320.95 | |
| — | 200.00 | — | — | ||
| Supply of all types of galvanized bonds as per technical specifications | — | — | — | 56,094 | |
| — | 200.00 | — | — | ||
| Erection of all types of galvanized bonds as per explanatory notes | — | — | — | 13,608 | |
| — | 10.00 | — | — | ||
| Supply of different types of caution boards as per technical specifications | — | — | — | 12,744.8 | |
| — | 15.00 | — | — | ||
| — | 10.00 | — | — | ||
| — | 3.00 | — | — | ||
| — | 3.00 | — | — | ||
| — | — | — | 6,882.78 | ||
| — | 3.00 | — | — | ||
| — | — | — | 4,334.34 | ||
| — | 3.00 | — | — | ||
| — | — | — | 1,300.29 | ||
| — | 15.00 | — | — | ||
| — | — | — | 55,555.95 | ||
| — | 15.00 | — | — | ||
| — | — | — | 84,622.35 | ||
| — | 15.00 | — | — | ||
| — | — | — | 23,576.55 | ||
| — | 15.00 | — | — | ||
| — | — | — | 7,072.95 | ||
| — | 15.00 | — | — | ||
| — | — | — | 6,888.45 | ||
| — | 15.00 | — | — | ||
| Supply of contact wire splice | — | — | — | 21,318.45 | |
| — | 15.00 | — | — | ||
| Supply of catenary wire ending clamp. | — | — | — | 8,555.4 | |
| — | 15.00 | — | — | ||
| Supply of catenary wire splice | — | — | — | 8,319.45 | |
| — | 30.00 | Each Span | — | ||
| Tower wagon checking and adjustment of OHE/Turn out/ Cross over/ Overlap as per technical specifications | — | — | — | 82,689.9 | |
| — | 30.00 | Each Span | — | ||
| Power block charges on Tower wagon checking and adjustment of OHE as per technical specifications | — | — | — | 24,807 | |
| — | — | — | 15,81,301.05 | ||
| — | 5.00 | — | — | ||
| Supply of fabricated galvanised steel structure and SPS as per technical specifications | — | — | — | 7,50,692.3 | |
| — | 2.00 | — | — | ||
| Erection of fabricated galvanised steel structure and SPS on Bridge No. 427 as per explanatory notes | — | — | — | 27,046.66 | |
| — | 3.00 | — | — | ||
| Supply of Single cantilever assembly complete with insulator as per technical specifications. | — | — | — | 84,823.2 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCCACS1to11.pdf
ATTACHMENT
GCCApril2022.pdf
ATTACHMENT
TenderdocumentsGSEBLcorrected.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .