Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAdmitted-Fee/PreQual/Technical/Finance | ₹4.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹5.0 LAdmitted-Fee/PreQual/Technical/Finance | ₹5.0 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | HARIDAS PANTHAPLACKAL MADHAVANPILLAI L1 | JAYAKRISHNAN P R (J K ASSOCIATES) L2 |
|---|---|---|---|---|---|
| 1.00Appendix -Pre monsoon | |||||
| 1.00 | 2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area | 4.23 | Hectare | 50,000 ₹2,11,650 | 58,000 ₹2,45,514 |
| 1.00 | OD27936/2026-2027:Engaging wood cutter for cutting branches of trees and removing debris from
premises | 6 | each | 3,500 ₹21,000 | 3,600 ₹21,600 |
| 1.00 | OD27937/2026-2027:Engaging hydraulic excavator for removing deposited materials during monsoon season in roadway and other emergent nature works for restore traffic | 7 | each | 8,500 ₹59,500 | 9,500 ₹66,500 |
| 1.00 | OD27939/2026-2027:Engaging man mazdoor for clearing drain, culvert and other miscellaneous items | 60 | Day | 1,000 ₹60,000 | 1,100 ₹66,000 |
| 1.00 | OD27940/2026-2027:Engaging Tipper 5.5 cum capacity from conveying the silt removed | 6 | Day | 5,750 ₹34,500 | 6,500 ₹39,000 |
| 1.01 | OD29057/2026-2027:Filling up potholes with bituminous ready mix compound (25kg bag) and compacting by ramming to get a compact surface including of cost of material,laying charges, transportation to site etc. complete rate is arrived for a bag of 25kg Assuming a average of 15 bags of 25 kg ready mix compound will be laid in potholes in a day | 82 | each | 700 ₹57,400 | 774 ₹63,468 |
Tender Value
₹5.1 L
EMD Value
₹12,700
Closing Date
4 Jul 2026, 6:00 pmClosed
Assistant Executive Engineer
o/o The Assistant Executive Engineer PWD Roads sub division Kanjirapally
Clearing grass removal of rubbish Filling up Pot holes Engaging Excavator for clearing soil . or clearing debris from shoulder etc monsoon clearance work.
2026_PWD_857411_1
PWD/RB/TR/7784/2026
Open Tender
Civil Works - Roads
90 days
Kanjirappally
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,120
Yes
₹12,700
Yes
9 Jul 2026
25 Jun 2026
7 Jul 2026
25 Jun 2026
4 Jul 2026
25 Jun 2026
25 Jun 2026 - 2 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix -Pre monsoon | |||||
| 1.001 | 2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area | 1 | Hectare | - | - |
| 1.002 | OD27936/2026-2027:Engaging wood cutter for cutting branches of trees and removing debris from
premises | - | each | - | - |
| 1.003 | OD27937/2026-2027:Engaging hydraulic excavator for removing deposited materials during monsoon season in roadway and other emergent nature works for restore traffic | - | each | - | - |
| 1.004 | OD27939/2026-2027:Engaging man mazdoor for clearing drain, culvert and other miscellaneous items | - | Day | - | - |
| 1.005 | OD27940/2026-2027:Engaging Tipper 5.5 cum capacity from conveying the silt removed | - | Day | - | - |
| 1.006 | OD29057/2026-2027:Filling up potholes with bituminous ready mix compound (25kg bag) and compacting by ramming to get a compact surface including of cost of material,laying charges, transportation to site etc. complete rate is arrived for a bag of 25kg Assuming a average of 15 bags of 25 kg ready mix compound will be laid in potholes in a day | - | each | - | - |
stage.html
html • 0.02 MB
finance_1449484.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 1.63 MB
BOQ_1449484.xls
BOQ • 0.30 MB
corrigendum.pdf
PDF • 0.38 MB
Download all tender documents and submit your bid